HomeMy WebLinkAboutB16-0273_E16-0145 inspection list_1492539180.pdfPERMITS MANAGEMENT
Other
Create New Inspection:
Project: Mckelvey Residence 2016
Select options Create Go to Main Inspection Grid
1 +
1 +
Inspections
Checklist Edit Info Schedule Prerequisites Schedule Inspection
Electrical Final (Electrical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0145
Parcel
Checklist Edit Info Schedule Prerequisites Schedule Inspection
Rough Electrical (Rough Electrical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date
Estimated Duration 1 Hour(s)
Permit Number E16-0145
Parcel