Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B16-0296_M0.0_1474657380.pdf
' ' ISSUE LOG KEY: # DATE ISSUE LOG MECHANICAL SHEET INDEX TITLE MECHANICAL COVER SHEET M0.0 7 0% D D 04/19/2016 ISSUED AS PART OF A SET ' ' NOT PART OF SET ' ' ISSUED FOR INFORMATION ONLY * √ √ √ M0.1 EXISTING MECHANICAL FIRST LEVEL FLOOR PLAN M2.1X √ M2.1 √ M2.2X SINGLE LINE DESCRIPTION DOUBLE LINE D D SPLIT BRANCH TAKE-OFF WITH SQUARE ELBOW & SPLITTER DAMPER SPLIT BRANCH TAKE-OFF WITH RADIUS ELBOW & SPLITTER DAMPER POSITIVE PRESSURE RISER, TYPICALLY SUPPLY NEGATIVE PRESSURE RISER, TYPICALLY RETURN, EXHAUST OR OUTSIDE AIR F/S COMBINATION FIRE & SMOKE DAMPER F/S FIRE DAMPER MOTOR OPERATED DAMPER (MOD) MANUAL VOLUME DAMPER, SINGLE BLADE DAMPER (SBD) FOR ROUND OR <10" TALL, OPPOSED BLADE DAMPER (OBD) >10" TALL BACKDRAFT DAMPER BDD BDD SMOKE DAMPER SMOKE DETECTOR DUCT SIZE: FIRST NUMBER IS PLAN WIDTH, SECOND NUMBER IS DEPTH. 24x36 24x36 DUCTWORK LEGEND SD SD PRESSURE REDUCING VALVE SHOCK ABSORBER STRAINER W/ BLOW-OFF VALVE SAFETY RELIEF VALVE VACUUM BREAKER PRESSURE GAUGE W/ PIG TAIL & COCK THERMOMETER PRESSURE - TEMP. TAP AIR VENT PIPE ANCHOR FLEXIBLE CONNECTOR PIPE EXPANSION JOINT PIPE UNION DOUBLE CHECK BACKFLOW PREVENTER PUMP & EQUIPMENT CONNECTOR TEMPERATURE CONTROL VALVE (2-WAY) DRAIN VALVE W/ HOSE END PLUG VALVE IN RISER FLOW BALANCING VALVE GATE OR GLOBE VALVE IN RISER FLOW CONTROL VALVE BALL VALVE PLUG OR BALANCING VALVE CHECK VALVE GLOBE VALVE BUTTERFLY VALVE VENTURI/FLOW INDICATOR TEMPERATURE CONTROL VALVE (3-WAY) SOLENOID VALVE 90° ELBOW UP TEE UP TEE DOWN SHUT OFF (BALL, GATE, BUTTERFLY) PIPING SYMBOLS 90° ELBOW DN S FLOW SWITCH HOSE BIBB WALL HYDRANT TEMPERATURE CONTROLLER OR SENSOR BAR SINK BS 1/2" 1/2" 1-1/2" 1-1/2" FIXTURE CONNECTION SCHEDULE HW CW WASTE VENT : 1. SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGER SIZES MAY BE INDICATED ON PLANS WHERE REQUIRED. 2. MINIMUM DOMESTIC PIPE SIZE TO (2) OR MORE FIXTURES IS 3/4". 3. RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTE SIZES. 4. WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY. WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED OR SIZES MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACK VENTS, WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED. PRIOR APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESE ALTERNATIVE VENTING METHODS. 5. PROVIDE TRAP PRIMER FOR ALL FLOOR DRAINS AND FLOOR SINKS NOT LOCATED IN FOOD SERVICE AREAS. 6. MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2". 7. ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT. 8. REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBING FIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, AND GARBAGE DISPOSALS. 9. PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALL REFRIGERATOR LOCATIONS. ABBREV. CS CLOTHES WASHER ROUGH-IN 1/2" 1/2" 2" 1-1/2" DRINKING FOUNTAIN / E.W.C. DF - 1/2" 1-1/2" 1-1/2" DISH MACHINE ROUGH-IN DM 3/4" 3/4" 2" 1-1/2" DW DISHWASHER ROUGH-IN - 1/2" 2" 1-1/2" FD FLOOR DRAIN - - 2" 1-1/2" FS FLOOR SINK - - 3" 2" HOSE BIB HB - - -3/4" HAND SINK HS 1-1/2" 1-1/2" 1/2" 1/2" KITCHEN SINK W/ OR W/O DISPOSER KS 1/2" 1/2" 2" 1-1/2" LAVATORY LAV 1/2" 1-1/2" 1-1/2" 1/2" MOP SERVICE BASIN MSB 3/4" 3" 2" 3/4" SHOWER / BATHTUB SH 3/4" 3/4" 2" 1-1/2" SERVICE SINK SS 3" 2" 1/2" 1/2" TROUGH DRAIN TD - - 3" 2" URINAL (BLOWOUT) UR 1" 2" 1-1/2" - URINAL (WASHDOWN) UR UR URINAL (WATERLESS) 3/4" 2" 1-1/2" - - WATER CLOSET (FLUSH VALVE) WC WATER CLOSET (FLUSH TANK) WCT WS 3/4" 3/4" 2" 1-1/2" WORK SINK EQUIPMENT ABBREVIATIONS AIR HANDLING UNIT AHU AIR SEPARATOR AS BOILER (HOT WATER) B BASE BOARD BB BUFFER TANK BT DEHUMIDIFICATION UNIT DHU ELECTRIC BASEBOARD HEATER EBH FAN COIL FC GLYCOL FEEDER GF HUMIDIFIER HRV HEAT RECOVERY UNIT HX HEAT EXCHANGER KITCHEN EXHAUST FAN KEF MAKE-UP AIR UNIT MAU MOTOR CONTROL CENTER MCC MIXING VALVE MV PUMPP RETURN (OR RELIEF) AIR FAN RF RADIANT ZONE RZ SNOWMELT AREA SA STORAGE TANK ST THERMOSTATIC MIXING VALVE TMV UNIT HEATER UH WATER HEATER WH H CHILLER CH COILING COIL CC CABINET UNIT HEATER CUH DUCT COIL DC EVAPORATIVE COOLING UNIT ECU ENERGY RECOVERY UNIT ERU EXHAUST FAN EF EXPANSION TANK ET TYPE OF AIR DEVICE RE: GRD SCHEDULE. AIR DEVICE DESIGNATION KEY # CA EXH OSA RA XFR SIZE (INCHES) OR MINIMUM FREE AREA REQUIRED IN SQUARE FEET. : FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN IS NECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE. INDICATES AIR INLET DEVICE. = = = = = = AIR QUANTITY (CFM) COMBUSTION AIR EXHAUST OUTSIDE AIR RETURN TRANSFER B XFR 12x6 A 150 12x6 REFERENCE SAMPLE FFI = FOR FURTHER INFORMATION FCT = FOR CONTINUATION RE: B/M400 FFI REFER TO: DRAWING NUMBER OR DIAGRAM LETTER SHEET NUMBER NOTES 1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS ON LEGEND SHEET ARE NOT NECESSARILY USED ON THIS PROJECT. 2. THIS DRAWING SET CONSISTS OF DATA GENERATED, IN PART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES AND NOTATION CONVENTIONS OCCURRING IN THIS DRAWING SET ARE NECESSARILY DEFINED ON THESE LEGENDS. CONSULT THE ENGINEER IN THE EVENT SYMBOLOGY OR NOTATION INTERPRETATION IS REQUIRED. PLAN SYMBOLS CONTROL PANEL/RADIANT MANIFOLD CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR DIAGRAM CONTINUATION REFERENCE PLUMBING/HVAC RISER POINT OF NEW CONNECTION DUCT STATIC PRESSURE SENSOR ROOM PRESSURE SENSOR EMERGENCY POWER OFF SWITCH ACCESS PANEL SNOWMELT MANIFOLD SECTION CUT LETTER/SHEET SHOWN ON POINT OF DISCONNECTION - SP CO2 EPO P CO -- -P THERMOSTAT HUMIDISTAT REMOTE TEMPERATURE SENSOR T S H H B W H TC FS ROOF DRAIN FLOOR DRAIN FLOOR SINK HORIZONTAL CLEANOUT VERTICAL CLEANOUT DECK/ROOF DRAIN ABOVE PIPING DESIGNATIONS SNOWMELT SUPPLY SNOWMELT RETURN HEATING WATER SUPPLY (HIGH TEMP) HEATING WATER RETURN (HIGH TEMP) CHILLED WATER SUPPLY CHILLED WATER RETURN CONDENSER RETURN NATURAL GAS MEDIUM PRESSURE GAS HIGH PRESSURE STEAM HIGH PRESSURE CONDENSATE RETURN LOW PRESSURE STEAM LOW PRESSURE CONDENSATE RETURN REFRIGERANT SUCTION REFRIGERANT LIQUID DOMESTIC WATER DOMESTIC HOT WATER DOMESTIC HOT WATER (TEMP. SHOWN) DHW RECIRCULATION FIRE LINE PRESSURIZED WASTE PLUMBING VENT PIPE WASTE PIPE ACID WASTE PIPE STORM DRAIN PIPE STORM DRAIN OVERFLOW COMPRESSED AIR PIPE GREASE WASTE PIPE ACID VENT PIPE LIQUID PROPANE GAS SECONDARY DRAIN SAND AND OIL WASTE FLOOR COOLING SUPPLY FLOOR COOLING RETURN PROPANE GAS HEATING WATER SUPPLY (LOW TEMP) HEATING WATER RETURN (LOW TEMP) SOLAR HEATING WATER SUPPLY SOLAR HEATING WATER RETURN GROUND LOOP SUPPLY GROUND LOOP RETURN GROUND WATER SUPPLY GROUND WATER RETURN HEATING WATER SUPPLY HEATING WATER RETURN DRAIN PIPE FUEL OIL SUPPLY FUEL OIL RETURN GLYCOL FEED GREASE VENT MEDIUM PRESSURE STEAM MEDIUM PRESSURE CONDENSATE RETURN FUEL OIL VENT FUEL OIL FILL PUMPED CONDENSATE GEOTHERMAL (OR GROUND) LOOP SUPPLY GEOTHERMAL (OR GROUND) LOOP RETURN CLOSED CONDENSER SUPPLY CLOSED CONDENSER RETURN PROPANE DRAIN CONDENSER SUPPLY PLUMBING PIPING NON-SOFTENED DOMESTIC WATER CR CS CCR CCS GLR GLS CHR CHS GLR GLS GF HWR HWS HWR(LT) HWS(LT) HWR(HT) HWS(HT) FCR FCS SHWR SHWS SMS SMR PC MPR MPS LPS LPR HPR HPS PD D PG LPG MG G RS RL FOF FOV FOR FOS GWR GWS CW HW HWC NS 140° HW GV SO SD ST GW AW AV V W PW ST(OF) F CA SOLID DRAIN PIPE DS STEAM & CONDENSATE PIPING HYDRONIC PIPING 90° ELBOW DOWN (ROUND DUCT ONLY) ROUND 90° ELBOW UP (ROUND DUCT ONLY) OFFSET TO CHANGE ELEVATION (AT 30° WHEN POSSIBLE) D = DROP R = RISE ROUND RADIUS ELBOW 90° STRAIGHT TEE 90° CONICAL TEE 45° BRANCH 45° CONICAL TEE SIZE OR SHAPE TRANSITION ROUND FLEXIBLE DUCT 90° ELBOW DN (NEGATIVE PRESSURE) 90° ELBOW DN (POSITIVE PRESSURE) 90° ELBOW UP (NEGATIVE PRESSURE) 90° ELBOW UP (POSITIVE PRESSURE) 90° RADIUS ELBOW 90° RADIUS ELBOW W/TURNING VANES SQUARE DUCT SPLIT ROUND DUCT SPLIT SUMP PUMP SP MECHANICAL SYSTEMS LEGEND √ MECHANICAL DIAGRAMS M4.0 CLG CEILING (OR COOLING) ENTERING AIR TEMPERATURE EAT EA EXHAUST AIR CONN CO CONNECT CLEANOUT BELOW FINISHED GRADE CUBIC FEET PER MINUTE (AIR FLOW RATE) BOTTOM OF PIPE FROM FINISHED FLOOR CFM BOP BFG ABOVE FINISHED GRADE AFG AFF ABOVE FINISHED FLOOR ENTERING WATER TEMPERATURE EWT OSA OUTSIDE AIR UNLESS NOTED OTHERWISE TYP UNO TYPICAL OPPOSED BLADE VOLUME DAMPER OC OBD NIC ON CENTER NOT IN CONTRACT LEAVING AIR TEMPERATURE LEAVING WATER TEMPERATURE LAT LWT FBO FURNISHED BY OWNER EXH EXHAUST PLAN ABBREVIATIONS (N) NEW COTG CLEANOUT TO GRADE GPM GALLONS PER MINUTE (WATER FLOW RATE) RA RETURN AIR SA SUPPLY AIR WITH W/ WALL CLEANOUT WCO FCO FLOOR CLEANOUT BACK DRAFT DAMPER BDD AUTOMATIC AUTO ABOVE ABV CONC CONCRETE COND CONDENSATE (E) EXISTING FIRE DAMPER FD COMBINATION FIRE/SMOKE DAMPER FSD KW KILOWATTS MOTOR OPERATED DAMPER MOD TRANSFER XFR T.A. THROW-AWAY DW(OR CW) DOMESTIC WATER DHW DOMESTIC HOT WATER DN DOWN MANUFACTURER MFG BUILDING BLDG OA OUTSIDE AIR DIAMETER Ø SFFA SQUARE FEET FREE AREA HP HORSEPOWER COMBUSTION AIR CA HW HOT WATER SS STAINLESS STEEL FCT FOR CONTINUATION COMMON C NC NORMALLY CLOSED N0 NORMALLY OPEN GC GENERAL CONTRACTOR MECHANICAL CONTRACTOR MC EC ELECTRICAL CONTRACTOR CONTROLS CONTRACTOR CC AAV AIR ADMITTANCE VALVE BUILDING CONTROL SYSTEM BCS CONTINUATION DESIGN BUILDCDBBC BY CONTRACTOR CIP CAST IN PLACE CONTR'R CONTRACTOR LINEAR FOOT LF NEC NATIONAL ELECTRIC CODE REQ'D REQUIRED REQ'MTS REQUIREMENTS SF SQUARE FOOT ILO IN LIEU OF VENT THRU ROOF VTR BETWEEN B/N WITH REGARD TO WRT WATER COOLED W/C RE: REFER TO: FIRE ALARM CONTROL PANEL FACP FFI FOR FURTHER INFORMATION ESP EXTERNAL STATIC PRESSURE RADIANT MANIFOLD RZM MECHANICAL SCHEDULES M0.2 √ √ 1. PROVIDE DEDUCT PRICING FOR USE OF PEX IN PLUMBING SYSTEMS. 2. PROVIDE DEDUCT PRICING FOR USE OF CLOSED CELL PIPE INSULATION ILO GLASS FIBER. ADD/ALT AND DEDUCT PRICING OPTIONS SPECIFICATIONS FIREPLACE FP HEATING AND COOLING LOAD CALCULATIONS WERE COMPLETED BY BG WITH THE TRANE TRACE 700 LOAD CALCULATION PROGRAM BASED ON INDUSTRY STANDARD ASHRAE CALCULATION METHODS. THE FOLLOWING DESIGN PARAMETERS WERE USED TO COMPLETE THE CALCULATIONS: HEATING DESIGN SPACE TEMPERATURE: 68°F. COOLING DESIGN SPACE TEMPERATURE: 75°F DB. (N) WINDOW U=0.31 SC=0.18. (E) WINDOW U=0.5 SC=0.55. ROOF INSULATION VALUE: R-49. (E) WALL INSULATION VALUE: R-12. DESIGN PARAMETERS DRYER CFM KITCHEN HOOD EXH 100 CFM (ASSUMED), QTY. 1 1,100 CFM, QTY. 1 DESIGN AIR LEAKAGE 0.45 ACH HEATING/COOLING LOAD CALCULATIONS ALTITUDE 8,200 FT 0.793 0.734 GAS VALUE (CONFIRMED WITH UTILITY) AIR TRANSFER FACTOR (CFM/BTUHx°F) SP (OR HP) CORRECTION 800 BTU/CF DRY BULB CONDITION SUMMER - HOT DAY SUMMER - HUMID DAY -16°F 88°F 70°F WINTER WET BULB N/A 61°F 59°F : THE ABOVE SUMMER FIGURES REPRESENT THE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE) STATISTICALLY RECOMMENDED 99.6% DESIGN VALUES FOR THE LOCAL WEATHER DATA SET. 1. 0.4% OF HOURS WITHIN A TYPICAL YEAR (APPROX 35 HOT DAY HOURS AND 35 HUMID DAY SUMMER HOURS ARE EXPECTED TO EXCEED EACH OF THE ABOVE CONDITIONS). ATYPICAL WEATHER YEARS COULD RESULT IN HIGHER EXCEEDANCE VALUES. LOAD LIGHTING PEOPLE (40) 1.0 WATTS/SF NOTES: 250 BTU/HR SENSIBLE 250 BTU/HR LATENT OUTDOOR AIR DESIGN TEMPERATURES INTERIOR LOAD ASSUMPTIONS PROJECT SPECIFICS 1. HEAT GAIN RATES DUE TO PEOPLE IS BASED ON ASHRAE 2009 FUNDAMENTALS HANDBOOK FOR ANTICIPATED ACTIVITY RATES WITHIN THE FACILITY (DESCRIBED BY ASHRAE AS STANDING, LIGHT WORK; WALKING) FIREPLACE VENTILATION N/A PROPOSED MECHANICAL FIRST LEVEL FLOOR PLAN EXISTING MECHANICAL SECOND LEVEL FLOOR PLAN M2.2 √ PROPOSED MECHANICAL SECOND LEVEL FLOOR PLAN M2.4X √ EXISTING MECHANICAL ROOF PLAN M2.4 √ PROPOSED MECHANICAL ROOF PLAN M3.1 √ PROPOSED PIPING FIRST LEVEL FLOOR PLAN M3.2 √ PROPOSED PIPING SECOND LEVEL FLOOR PLAN C O O R D IN A T IO N S E T 05/17/2016 √ √ √ √ √ √ √ √ √ √ √ √ C O O R D IN A T IO N S E T 05/24/2016 √ √ √ √ √ √ √ √ √ √ √ √ MECHANICAL DIAGRAMS M4.1 06/01/2016 √ √ √ √ √ √ √ √ √ √ √ √ P R O G R E S S S E T 08/02/2016 √ √ √ √ √ √ √ √ √ √ √ √ P E R M IT S E T Sheet Title: Sheet No: Project No: Revisions: Issue Dates: Seal © 2016 Judge + Associates Architects + Planners 1509.00 Red Lion Condo 3 Renovation 304 Bridge St, Vail Village, CO Judge + Architects + Planners Vail CO 81658.1734 (970) 949.7034 Post Office Box 1734 Edwards, CO 81632 105 Edwards Village Blvd, Suite G104 email: general@vagarchitects.com Associates H "E" 03.14.16: PEC Meeting "H" 04.20.16: 40% DD M0.0 Cover Mechanical 09/23/16