Loading...
HomeMy WebLinkAboutB16-0296_M2.1_1478898157.pdfA 6 4.8 4.6 3.9 3.1 2 1 E D C SCALE: PROPOSED MECHANICAL FIRST LEVEL FLOOR PLAN 1/4" = 1'-0" 1. RE: M4.0 FOR TYPICAL DIFFUSER CONNECTION. 2. RE: M4.0 FOR FAN COIL UNIT INSTALLATION. 3. RE: M4.0 FOR ROUND DUCT TAKE-OFF DIAGRAM. 4. RE: M4.0 FOR 45° DUCT TAKE-OFF DIAGRAM. 5. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 6. AVOID ROUTING DUCTWORK OVER ELECTRICAL ROOMS AND DO NOT ROUTE OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 16 CONTRACTOR. 7. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. T-STATS AND CO2 SENSOR LOCATIONS SHALL BE COORDINATED WITH ARCHITECT. 10. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER DUCTS, PIPES, AND ELECTRICAL. 11. ACCESS PANEL SIZES AND LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT. PANELS SHALL BE SIZED AS REQUIRED FOR THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: PROVIDE NEW EXHAUST FAN, REUSE EXISTING DUCTWORK EXTEND AS REQUIRED FOR NEW ROOFTOP TERMINATION. MAINTAIN 3' CLEARANCE TO PROPERTY LINE AND OPENINGS INTO BUILDING AND 10' CLEARANCE TO MECHANICAL OSA INTAKES. DRYER EXHAUST DUCT UP TO ROOF TERMINATION, MAINTAIN DUCT WITHIN CODE ALLOWED LENGTH. UTILIZE (E) DRYER EXHAUST PATHS. PROVIDE NEW TERMINATIONS PER MFR INSTALLATION INSTRUCTIONS. OSA DUCT TO LOUVER. PROVIDE DUCT COIL SIZED AT 500 FPM AND PIPE HWS/R TO COIL. (E) RESTAURANT KITCHEN TYPE II EXHAUST DUCT ROUTED UP IN THIS AREA (FIELD VERIFY SIZE AND EXACT LOCATION DURING DEMO) TO NEW EXHAUST FAN LOCATION ON ROOF, ADJUST DUCT ROUTING AS REQUIRED. MAINTAIN EQUIVALENT FREE AREA AND FIRE RATING WITH 1.5" FIRE WRAP. ELECTRIC PANEL LOCATIONS, DO NOT INSTALL PIPES OR DUCTWORK ABOVE THIS AREA. PROVIDE NEW EXH FAN, EXH GRILLE, DUCTWORK (6"Ø), AND ROOFTOP TERMINATION, MAINTAIN 3' CLEARANCE TO PROPERTY LINE AND OPENINGS INTO BUILDING AND 10' CLEARANCE TO MECHANICAL OSA INTAKES 1 FLAG NOTES: 7 1 1 7 2 3 2 A 210 12x6 B 210 24x3 A 320 36x3 A 320 36x3 A 400 36x4 A 400 36x4 T T T A 600 24x8 A 600 24x8 4 H 1 2 A 200 24x3 4 24x8 OSA WITH 1" LINER, HYDRONIC DUCT HEATING COIL, AND MOTORIZED OSA DAMPER INTERLOCKED WITH KITCHEN RANGE HOOD EXHAUST. CONNECT OSA DUCT TO VERTICAL FAN COIL UNIT BASE RA PLENUM A 210 24x3 H 1 FC 1 FC 4 FC 2 EF 1 EF 1 EF 1 FC 3 EF 1 FC 5 RELOCATE (E) VENTILATION DUCT TO FIT INTO NEW SHAFT LOCATION AS REQUIRED. FIELD VERIFY LOCATION AND SIDE DURING DEMO. B60024x12 20x8 KITCHEN GREASE EXH UP TO ROOF TERMINATION, COORDINATE TRANSITION INTO HOOD AS REQUIRED. FIRE SPRINKLER VENT TO BE RELOCATED TO NEW WALL. 24x5 RA DN WALL TO VERTICAL FAN COIL UNIT BASE RA PLENUM WITH MOTORIZED DAMPER INTERLOCKED WITH KITCHEN RANGE HOOD EXHAUST. 24x8 SA WITH 1" LINER. DC 2 12x6 12x6 12"Ø 12"Ø 5 5 6 6 7 T H CONNECT FAN COIL UNIT OUTLET TO SA DIFFUSER WITH 1" LINED SA DUCT SAME SIZE AS FAN COIL UNIT OUTLET, TYP. 4. 1" LINED RA PLENUM SAME SIZE AS FAN COIL UNIT INLET, TYP. CU 1 CU 2 Sheet Title: Sheet No: Project No: Revisions: Issue Dates: Seal © 2016 Judge + Associates Architects + Planners 1509.00 Red Lion Condo 3 Renovation 304 Bridge St, Vail Village, CO Judge + Architects + Planners Vail CO 81658.1734 (970) 949.7034 Post Office Box 1734 Edwards, CO 81632 105 Edwards Village Blvd, Suite G104 email: general@vagarchitects.com Associates H "E" 03.14.16: PEC Meeting "H" 04.20.16: 40% DD M2.1 Mechanical Floor Plan Proposed 09/23/16