Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B16-0296_M2.1X_1478898159.pdf
SCALE: EXISTING MECHANICAL FIRST LEVEL FLOOR PLAN 1/4" = 1'-0" DEMO (E) BOILER PLANT INCLUDING BOILER, EXPANSION TANK, AIR SEPERATOR, SIDE ARM WATER HEATER, HEATING WATER DISTRIBUTION VALVES AND PIPING, AND OTHER HEATING WATER APPURTENANCES. WATER SOFTENING EQUIPMENT TO REMAIN. DEMO (E) HYDRONIC BASEBOARD SYSTEM FOR REPLACMENT WITH HYDRONIC RADIANT FLOOR HEATING SYSTEM. NEW WASHER/DRYER LOCATION. RELOCATE PLUMBING AND DRYER EXHAUST AS REQUIRED. 1 FLAG NOTES: A 6 4.8 4.6 3.9 3.1 2 1 E D C 1 DEMO (E) UNIT 3 BOILER SYSTEM AND FLUE UP THROUGH ROOF. 3 2 3 1. ADDITIONAL STORM, HYDRONIC, DOMESTIC, WASTE AND VENT PIPING MAY BE ROUTED IN SPACE THAT IS NOT REPRESENTED, BUT IS TO REMAIN. OTHER SYSTEMS MAY EXIST WITHIN THE SPACE THAT ARE NOT REPRESENTED ON THESE DRAWINGS; MODIFICATIONS TO THESE SYSTEMS ARE NOT ANTICIPATED. 2. FIELD VERIFY ALL COMPONENTS PRIOR TO DEMOLITION. THE INFORMATION ON THIS SHEET WAS OBTAINED, IN PART, FROM HISTORIC DESIGN DRAWINGS. ONLY PORTIONS OF THE SYSTEMS WERE ACCESSIBLE FOR VISUAL CONFIRMATION DURING DESIGN PROCESS. 3. PROVIDE PRELIMINARY TESTING OF EXISTING HYDRONIC SYSTEMS. MEASURE CURRENT FLUID FLOW RATE THROUGH ALL EXISTING COILS, RADIANT, AND SNOWMELT ZONES FOR THE CURRENTLY INSTALLED SYSTEMS. SUBMIT REPORT OF MEASURED VALUES TO ENGINEER FOR REVIEW AND CONFIRMATION OF SYSTEM DESIGN ASSUMPTIONS PRIOR TO DEMOLITION. 4. PROVIDE PRELIMINARY TESTING OF EXISTING HVAC DUCTWORK SYSTEMS. MEASURE CURRENT AIR FLOW RATES AT ALL EXISTING SUPPLY, RETURN, AND EXHAUST REGISTERS. MEASURE TOTAL AIR FLOWS AT MAIN DUCT BRANCHES AND ALL FAN SYSTEMS. SUBMIT REPORT OF MEASURED VALUES TO ENGINEER FOR REVIEW AND CONFIRMATION OF SYSTEM DESIGN ASSUMPTIONS PRIOR TO DEMOLITION. 5. (E) WASTE SYSTEM SERVING SPACE IS LOCATED IN THE CEILING OF THE SPACE BELOW. 6. REMOVE ALL MECHANICAL ITEMS INDICATED. 7. TEMPORARILY SEAL OR CAP PIPING TO BE RE-USED FOR LATER CONNECTION. 8. SEAL ALL OPEN DUCTS DURING CONSTRUCTION TO MITIGATE DUST AND DEBRIS FROM SYSTEM. CAP DUCTWORK IN LOCATIONS THAT ARE NOT BEING RECONNECTED. 9. REMOVE ALL DEMOLISHED COLD WATER, HOT WATER AND HOT WATER RECIRCULATION PIPING BACK TO BRANCH FROM MAIN TO ELIMINATE ALL DEAD ENDS IN DOMESTIC WATER PIPING. 10. NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES OF INFORMATION REPRESENTED IN THE DOCUMENTS VERSUS WHAT IS FOUND IN THE FIELD. 11. COORDINATE PATCHING AND REPAIRS OF WALLS, CEILINGS AND FLOORS WITH ARCHITECT. 12. PATCH STRUCTURAL OPENINGS IN FLOORS, WALLS AND ROOFS THAT WERE PREVIOUSLY OCCUPIED BY SYSTEMS AND EQUIPMENT DEMOLISHED UNDER THIS CONTRACT IN ACCORDANCE WITH STRUCTURAL ENGINEER'S REQUIREMENTS. DEMOLITION NOTES: 2 2 2 2 2 2 DEMO (E) RANGE HOOD EXHAUST UP THROUGH ROOF. DEMO (E) HUMIDIFIER AND ASSOCIATED DUCTWORK. REUSE DRAIN AND WATER PIPING FOR (N) HUMIDIFIER DEMO (E) VENTILATION FAN AND ASSOCIATED DUCTWORK. (E) RESTAURANT KITCHEN TYPE II EXHAUST DUCT ROUTED UP IN THIS LOCATION TO EXHAUST FAN ON ROOF. ADJUST DUCT ROUTING AS REQUIRED TO MAINTAIN EQUIVALENT (E) FREE AREA AND FIRE RATING. FIRE SPRINKLER VENT TO BE RELOCATED TO NEW WALL. (E) VENTILATION DUCT TO REMAIN. (E) FIREPLACE FLUE TO REMAIN. Sheet Title: Sheet No: Project No: Revisions: Issue Dates: Seal © 2016 Judge + Associates Architects + Planners 1509.00 Red Lion Condo 3 Renovation 304 Bridge St, Vail Village, CO Judge + Architects + Planners Vail CO 81658.1734 (970) 949.7034 Post Office Box 1734 Edwards, CO 81632 105 Edwards Village Blvd, Suite G104 email: general@vagarchitects.com Associates H "E" 03.14.16: PEC Meeting "H" 04.20.16: 40% DD M2.1X Mechanical Floor Plan Existing 09/23/16