Loading...
HomeMy WebLinkAboutB16-0296_M2.2_1474657380.pdfSCALE: PROPOSED MECHANICAL SECOND LEVEL FLOOR PLAN 1/4" = 1'-0" A 6 4.8 4.6 3.9 3.1 2 1 E D C PROVIDE NEW EXHAUST FAN, REUSE EXISTING DUCTWORK EXTEND AS REQUIRED FOR NEW ROOFTOP TERMINATION. MAINTAIN 3' CLEARANCE TO PROPERTY LINE AND OPENINGS INTO BUILDING AND 10' CLEARANCE TO MECHANICAL OSA INTAKES. 600 CFM OSA DUCT TO ROOFTOP TERMINATION. PROVIDE DUCT COIL SIZED AT 500 FPM AND PIPE HWS/R TO COIL. PROVIDE MOTORIZED OSA DAMPER TO OPEN WHEN FAN COIL UNIT IS ACTIVATED FOR KITCHEN RANGE HOOD MAKE-UP AIR. PROVIDE MOTORIZED RA DAMPER ON 14" Ø RA. (E) RESTAURANT TYPE I GREASE EXHAUST DUCT ROUTED UP IN THIS AREA (FIELD VERIFY SIZE AND EXACT LOCATION DURING DEMO). TERMINATE AND CAP ON ROOF FOR FUTURE USE, ADJUST DUCT ROUTING AS REQUIRED. MAINTAIN EQUIVALENT FREE AREA AND FIRE RATING WITH 3" FIRE WRAP. NEW BATHROOM EXH FAN AND DUCTWORK. EXTEND 6"Ø EXHAUST DUCTWORK TO NEW ROOFTOP EXHAUST TERMINATION OR CONNECT TO COMMON (N) 7"Ø EXHAUST UP TO NEW ROOFTOP EXHAUST TERMINATION. MAINTAIN MINIMUM 3' CLEARANCE TO OPENINGS INTO BUILDING AND 10' CLEARANCE TO MECHANICAL OSA INTAKES. 1 FLAG NOTES: 2 1. RE: M300 FOR TYPICAL DIFFUSER CONNECTION. 2. RE: M300 FOR FAN COIL UNIT INSTALLATION. 3. RE: M300 FOR ROUND DUCT TAKE-OFF DIAGRAM. 4. RE: M300 FOR 45° DUCT TAKE-OFF DIAGRAM. 5. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 6. AVOID ROUTING DUCTWORK OVER ELECTRICAL ROOMS AND DO NOT ROUTE OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 16 CONTRACTOR. 7. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 10. T-STATS AND CO2 SENSOR LOCATIONS SHALL BE COORDINATED WITH ARCHITECT. 11. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER DUCTS, PIPES, AND ELECTRICAL. 12. ACCESS PANEL SIZES AND LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT. PANELS SHALL BE SIZED AS REQUIRED FOR THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: A 270 24x4 A 270 24x4 T A 200 24x3 A 200 24x3 A 600 24x8 A 300 24x4 A 300 24x4 4 1 1 T T FC 6 H 1 2 FC 8 H 1 EF 1 EF 1 EF 1 (N) 20x8 KITCHEN HOOD EXHAUST UP TO (N) ROOF TERMINATION. FC 7 DC 7 12"Ø 12"Ø 14"Ø 10"Ø 9"Ø 3 3 4 H CONNECT FAN COIL UNIT OUTLET TO SA DIFFUSER WITH 1" LINED SA DUCT SAME SIZE AS FAN COIL UNIT OUTLET, TYP. 1" LINED RA PLENUM SAME SIZE AS FAN COIL UNIT INLET, TYP. (E) FIREPLACE FLUE TO REMAIN. H RELOCATED (E) VENTILATION DUCT TO FIT INTO NEW SHAFT LOCATION AS REQUIRED. EF 1 DRYER EXH UP TO ROOF TERMINATION. BOILER FLUES AND CA UP TO ROOF TERMINATION. Sheet Title: Sheet No: Project No: Revisions: Issue Dates: Seal © 2016 Judge + Associates Architects + Planners 1509.00 Red Lion Condo 3 Renovation 304 Bridge St, Vail Village, CO Judge + Architects + Planners Vail CO 81658.1734 (970) 949.7034 Post Office Box 1734 Edwards, CO 81632 105 Edwards Village Blvd, Suite G104 email: general@vagarchitects.com Associates H "E" 03.14.16: PEC Meeting "H" 04.20.16: 40% DD M2.2 Mechanical Floor Plan Proposed 09/23/16