Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B16-0296_M3.1_1474657440.pdf
A 6 4.8 4.6 3.9 3.1 2 1 E D C SCALE: PROPOSED PIPING FIRST LEVEL FLOOR PLAN 1/4" = 1'-0" REARRANGED BATHROOM/KITCHEN FIXTURES. RE-ROUTE WASTE & VENT SYSTEMS TO MATCH NEW ARRANGEMENT. CONNECT CW, HW, & HWC PIPING TO (E) DISTRIBUTION PIPING SERVING THE ORIGINAL LAYOUT. (E) WATER METER LOCATION. REUSE EXISTING HOT, COLD, WASTE, AND VENT PIPING AS DETERMINED DURING DEMO. 3/4"HWS/R UP TO RADIANT MANIFOLD 3/4"HWS/R DN TO RADIANT MANIFOLD 3/4"HWS/R DN TO DC-2 1"HWS/R UP TO RADIANT MANIFOLD AND DC-7 1/2"HWS/R DN TO RADIANT MANIFOLD NEW PLUMBING FIXTURE. CONNECT TO (E) WASTE 3" OR LARGER, (E) VTR 3" AND LARGER, PROVIDE NEW CW, HW, & HWC PIPING TO MECHANICAL ROOM WATER ENTRY AND WATER HEATER. 1 FLAG NOTES: 1 1 1 1 1. RE: M4.0 FOR CLEANOUT DIAGRAMS. 2. RE: M4.0 FOR ISLAND VENT DIAGRAM. 3. RE: M4.0 FOR TRAP PRIMER CONNECTION. 4. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 5. CLEANOUTS ARE NOT SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 6. COORDINATE ROUTING OF CONDENSATE DRAIN LINES WITH ARCHITECT PRIOR TO INSTALLATION. 7. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 8. TERMINATE PLUMBING VENTS NOT LESS THAN 12" ABOVE ROOF. 9. AVOID ROUTING PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 16 CONTRACTOR. 10. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 11. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 10 FEET OF ALL HOT WATER FIXTURES. CONNECT WITHIN 3 FEET OF 0.5 GPM AND LOWER FAUCETS. 12. ALL VALVES SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS, OR WITH ACCESS PANELS IN OTHERWISE UN-ACCESSIBLE LOCATIONS. PLUMBING NOTES: 1. ALL RE-USED (E) DUCTWORK SHALL BE INSPECTED FOR LEAKAGE AND CLEANED/SANITIZED. 2. FIELD VERIFY ALL COMPONENTS PRIOR TO DEMOLITION. THE INFORMATION ON THIS SHEET WAS OBTAINED, IN PART, FROM HISTORIC DESIGN DRAWINGS. ONLY PORTIONS OF THE SYSTEMS WERE ACCESSIBLE FOR VISUAL CONFIRMATION DURING DESIGN PROCESS. 3. TEMPORARILY SEAL OR CAP PIPING TO BE RE-USED FOR LATER CONNECTION. 4. SEAL ALL OPEN DUCTS DURING CONSTRUCTION TO MITIGATE DUST AND DEBRIS FROM SYSTEM. CAP DUCTWORK IN LOCATIONS THAT ARE NOT BEING RECONNECTED. 5. REMOVE ALL DEMOLISHED COLD WATER, HOT WATER AND HOT WATER RECIRCULATION PIPING BACK TO BRANCH FROM MAIN TO ELIMINATE ALL DEAD ENDS IN DOMESTIC WATER PIPING. 6. NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES OF INFORMATION REPRESENTED IN THE DOCUMENTS VERSUS WHAT IS FOUND IN THE FIELD. 7. COORDINATE PATCHING AND REPAIRS OF WALLS, CEILINGS AND FLOORS WITH ARCHITECT. 8. PATCH STRUCTURAL OPENINGS IN FLOORS, WALLS AND ROOFS THAT WERE PREVIOUSLY OCCUPIED BY SYSTEMS AND EQUIPMENT DEMOLISHED UNDER THIS CONTRACT IN ACCORDANCE WITH STRUCTURAL ENGINEER'S REQUIREMENTS. DEMOLITION NOTES: T UNIT 3 RADIANT MANIFOLD SCHEDULE ZONE DESCRIPTION AREA (SQ. FT.) GPM ESTIMATED # OF LOOPS MAX LOOP PRESSURE LOSS (FTWC) FLOOR COVERING 1 BEDROOM 2 245 0.6 2 15 - 2 KITCHEN/POWDER 300 0.8 3 8 3 LAUNDRY 70 0.2 1 4 MASTER BATH 170 0.5 2 6 5 MASTER BED 360 1 6 DINING ROOM 270 0.7 2 15 7 LIVING ROOM 475 1.3 4 15 8 MUDROOM/FOYER 200 0.5 2 8 9 BATH 2 60 0.2 MANUFACTURERS: * GENERAL NOTES: A: PROVIDE UPONOR 10" QUICK TRACK OR EQUAL. USE 5/16" TUBING TO LIMIT FLOOR ASSEMBLY HEIGHT. B: B 1 B 1 WH 1 REUSE AND RE-PIPE (E) WATER SOFTENER. RADIANT ZONE 8 RADIANT ZONE 1 RADIANT ZONE 3 RADIANT ZONE 2 RADIANT ZONE 7 RADIANT ZONE 6 RADIANT ZONE 4 RADIANT ZONE 5 RADIANT ZONE 9 ELECTRIC PANEL LOCATIONS, DO NOT INSTALL PIPES OR DUCTWORK ABOVE. DC 2 2 2 3 3 6 3 4 4 4 4 5 5 RE SHEET M4.1 FOR BOILER PIPING DIAGRAM. RE SHEET M4.0 FOR GAS PIPING DIAGRAM. 1" HWS/R 6 1" HWS/R 1" HWS/R 3/4" HWS/R 3/4" HWS/R 1-1/4" HWS/R 7 7 4" CPVC BOILER FLUE AND COMBUSTION AIR PIPE UP TO ROOF CONCENTRIC TERMINATION 8 G G HWS/R 8 8 8 8 8 Sheet Title: Sheet No: Project No: Revisions: Issue Dates: Seal © 2016 Judge + Associates Architects + Planners 1509.00 Red Lion Condo 3 Renovation 304 Bridge St, Vail Village, CO Judge + Architects + Planners Vail CO 81658.1734 (970) 949.7034 Post Office Box 1734 Edwards, CO 81632 105 Edwards Village Blvd, Suite G104 email: general@vagarchitects.com Associates H "E" 03.14.16: PEC Meeting "H" 04.20.16: 40% DD SNOWMELTED WALKWAY SERVED FROM B-3. RE M0.2 FFI. M3.1 Floor Plan Proposed 09/23/16