Loading...
HomeMy WebLinkAboutB16-0336_ED-PA-102D_1478900652.pdfHP HG AP AP AP AP AP AP HG AP AP AP AP AP AP AP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ELECTRICAL DEMO FLOOR PLAN SECOND LEVEL - AREA D ED-PA-102D ACTIVITY Draw Design Manager BY Check P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S EST. 1915 DATE REVISIONS DESCRIPTION NO. FILE LOG STAMP 2016 © LEO A DALY Company Project No. 012-10378-000 AUGUST 19, 2016 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 GO, KA Monroe & Newell alibre VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 OWNER: VAIL HOTEL PARTNERS 1880 CENTURY PARK EAST SUITE 1016 LOS ANGELES, CA 90067 1. REMOVE EXISTING WALL SCONCE; CAP EXISTING WIRE (PROVIDE SPLICE CONNECTION WHERE NECESSARY FOR CIRCUIT CONTINUITY) AND PROVIDE NEW COVERPLATE. FINISH TO MATCH THAT OF NEW WALL FINISHES. 1. REFER TO DRAWING E-PA-001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES. 2. REFER DEMOLITION SECTION OF THE SPECIFICATION SHEET E-PA-004. COORDINATE WORK WITH OTHER DISCIPLINES. 3. IN AREAS WHERE NO WORK IS SHOWN, ALL EXISTING ELECTRICAL DEVICES AND EQUIPMENT ARE TO REMAIN, UNLESS NOTED OTHERWISE. ALL PROPOSED DEMOLITION WORK SHALL BE THOROUGHLY COORDINATED WITH THE LANDLORD PRIOR TO COMMENCING WORK. 4. WHERE EXPOSED, REMOVE ABANDONED CONDUIT. ALL CONDUIT ABANDONED IN THE SLAB OR CEILING SHALL HAVE ITS WIRING REMOVED AND SHALL BE LEFT PLUGGED-FLUSH WITH ITS COINCIDING SLAB OR CEILING. 5. REMOVE ALL ABANDONED HANGERS, SUPPORTS, ETC. FOR ELECTRICAL ITEMS. 6. WHERE ENCOUNTERED IN THE RENOVATION AREA, MAINTAIN OR RESTORE (WHERE INTERRUPTED) ANY WIRING DEVICES, RACEWAY OR CIRCUITS SERVING UNDISTURBED AREAS OF THE FACILITY. 7. WHERE ELECTRICAL DEVICES AND/OR CONDUIT ARE REMOVED, PATCH ALL HOLES IN SLABS, WALLS AND CEILINGS TO MATCH EXISTING CONSTRUCTION. ALL PATCHING SHALL BE MADE USING INTUMESCING FIRE SEALING MATERIAL. 8. REFER TO ARCHITECTURAL DOCUMENTS FOR ADDITIONAL INFORMATION AND DEMOLITION REQUIREMENTS. GENERAL CONTRACTOR TO NOTIFY ENGINEER IN WRITING OF AN DISCREPANCIES BETWEEN DOCUMENTS PRIOR TO WORK AND BID SUBMISSION. 9. ALL ITEMS ARE EXISTING, UNLESS NOTED OTHERWISE. 10. CONTRACTOR SHALL INCLUDE IN HIS BASE BID FOR CIRCUIT TRACING. DESIGN DEVELOPMENT / PROGRESS THIS DOCUMENT IS RELEASED FOR TH PURPOSE OF DESIGN DEVELOPMENT AND PROGRESS UNDER THE AUTHORIT OF MARK B. MURPHY, PE #45799 ON JU 8, 2016. IT IS NOT TO BE USED FOR OTHER PURPOSES. 08/19/2016 DESIGN DEVELOPMENT / PROGRESS THIS DOCUMENT IS RELEASED FOR TH PURPOSE OF DESIGN DEVELOPMENT AND PROGRESS UNDER THE AUTHORIT OF MARK B. MURPHY, PE #45799 ON JU 8, 2016. IT IS NOT TO BE USED FOR OTHER PURPOSES. 08/19/2016 10/26/16