Loading...
HomeMy WebLinkAboutprint_page_11-01-2016_5818b5146a5d9-0.pdfPERMITS MANAGEMENT Non-Designated Parcel Rec Fees will have to be manually calculated Create New Inspection: Project: Kirkpatrick Residence 2016 Select options Create Go to Main Inspection Grid 1 + 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0384 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Rough Mechanical (Rough Mechanical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0384 Parcel Checklist Edit Info Gas Piping (Gas Piping (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Florencio (JR) Mondragon at 10/28/2016 08:07:09 am Gas air test 15# ok for meter Status Completed Estimated Duration 1 Hour(s) Permit Number B16-0384 Parcel Requested Date Inspection Date 10/28/2016 Inspection Time Morning Date Completed 10/28/2016 Schedule Notes Gas Meter hookup located on northside under deck Result Pass Florencio (JR) Mondragon at 10/28/2016 08:07:12 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 08:07:12 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 08:07:17 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 08:07:17 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 08:07:21 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 08:07:21 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 08:07:25 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 08:07:25 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 08:07:29 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 08:07:29 am Applicant Signature Result comments Send NotificationInsert Re-Inspection 1 + Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0384 Parcel