Loading...
HomeMy WebLinkAbout84 Beaver Dam Road Special Inspections Executed.pdf 1 , MNOFVATi, A SPECIAL INSPECTION AND TESTING SCHEDULE (IBC 1704) Project Name: 84 Beaver Dam Remodel Permit# Owner's Name:e: A [M AnrA E C.O f.P 417/16 Testing Inspection Signa, re Print Name Date Agency: tA,Dia -o Dave Young ,,./ 1! - 417/16 Testing Inspection - .: cure / Print Name Date i Hereby certifies that the Testini nspection Agency named above has been engaged to perform structural tests and inspections during construction as checked below,to satisfy all applicable-portions-of the-Building Code. Prior to final inspection, the Inspection Agency shall submit a statement that all items of designated work performed were reported. Any items checked but not tested or inspected will be noted and explained. Whenever any designated items on the list are ready for sampling, testing, or Inspection, it shall be the responsibility of the contractor to give timely notice to the Inspection agency so that the required services may be performed. REINFORCING STEEL: UNDERPINNING: Tensile 8 Bend,one set per heat per tons Temporary!Permanent Inspection of Placement Inspection of Steel Fabrication Inspection of Welding Inspection of Reinforcing&Forms "" Epoxy Inspection of Concrete Placement - Inspection of Tiebacks MASONRY: Prelim.Acceptance Tests(Masonry Units,Wall Prisms) SOIL NAILS: Subsequent Tests(Mortar,Grout,Field Wall Prisms) . Temporary Shoring inspection of Placement and Grouting Permanent Well CONCRETE,SHOTCRETE,GROUT AND MORTAR: STRUCTURAL STEEL: Concrete Shot Grout Mortar Sample&Test(List specific members below) Aggregate tests for design Shop Identification&Welding Inspection - Suitability of aggregates _ Shop Ultrasonic Inspection Mix Designs Shop Radiography Test Panel- Field Welding Inspection Batch Plant Inspection Field Bolting Inspection Cement Grab Sample _ Field Ultrasonic Inspection Inspect Placing Field Radiography Compression Tests .,r Metal Deck Welding Inspection Cast Specimens HREPROOFING: Pick-up Samples Inspection&Placement Shrinkage Bars : Yield Check SOILS: Air Chedc Acceptance Tests Dry Unit Weight Moisture-Density Determination PRECAST CONCRETE: Field Density Reinforcing Tests _ Drilled Piers Inspection of Reinforcing Placement Deep Foundation Tendon Tests Inspection of Tendon Placement STRUCTURAL WOOD: Inspection of Concrete Placement Inspection of Fabrication Inspection of Concrete Batching` Inspection of Truss Joint Fabrication Inspection of Panel Attachment&Inserts Sample&Test Components Compression Tests inspection of Glu Lam Fabrication Inspection of Stressing/Transfer SMOKE CONTROL: PILING,CAISSONS,CAPS,TIES: Inspection of Reinforcing Placement - SPECIAL•CASES: Inspection of Concrete Placement Inspection of Concrete Batching SPECIAL INSPECTION: - Seismic Resistance Sperfly other tests,inspections or speclal knstruotlons squired. Wind Requirements pl\\.)\( Job Name: 84 Beaver Dam Remodel A' .Job Address: 84 Beaver Dam Road TOW OF VAIL Permit No.: SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tests - Scheduled to the TTown-of-%ail- for..review and approval Signatures are required on-both pages; photocopied or faxed signatures are acceptable. The'owner and his/her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor is responsible for. proper notification to the Inspection or Testing agency for items listed.(Page 1) (IBC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on'a weekly basis. 4. Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for.review and approval.(Page 2) 5. The special inspector is responsible toimmediately notify-the Town'of Vail Building°Official in writing of any concerns and/or problems encountered. 8. It is the responsibility.of the contractor to review the Town of Vail approved plans for additional inspection or testing'requirements that may be noted. A pre-construction conference at the job site is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. All special inspection field reports must be left on site for review by the Town of Vail staff poor to required inspections or re-inspections. BEFORE OCCUPANCY WILL BE GRANTED The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfilled and reported. Those Items not tested and/or inspected shall be noted in this statement. A copy of the statement shall be maintained at the job site for the Building Inspector's review prior:to final inspection. Acknowledgem=nt: �es-. ,31 Vv1 t,,,,,4 GE,v,,,r..t— ft.`{ Owner: .� '_l 1 . R -- y i (, gOpr ,-Ign- ure Print Name D Special Inspection iQ ., .,��. � G -/.40 Agency: .../ a,)ta a4c . :. y'7 _______--Signature of Print Date Project Arch/Eng: l t vu‘ 1-f CNW o'(A 1-1--7-1 n Signature Print Name Date Contractor. 12• ') h 640 c err ti-1./i. Sign lure Print Name Dale i ..