Loading...
HomeMy WebLinkAboutB16-0092_A3.1B_1478906452.pdf3/16" / 12" 3/16" / 12" 71' - 7 7/8" 1 A5.3 EXISTING F.F. @ 72' - 3" V.I.F. 2 A5.3 3 A5.3 FD UP (2) NEW WINDOWS HEAD HEIGHT, MULLIONS AND SILL HEIGHT TO ALIGN WITH NEW DOOR ON ADJACENT WALL NEW BUNK ROOM EXISTING WALL TO BE DEMO'D ABOVE EXISTING FOUNDATION WALL AND REBUILT W/ CMU EXTERIOR TO MATCH EXISTING AND NEW INTERIOR FURRED WALL 6" EXISTING WALL AND WINDOW TO BE REMOVED NEW SLAB OVER EXISTING SLAB TO REMAIN FINISH FLOOR TO MATCH EXISTING FLOOR AND EXISTING FLOOR ELEVATION @ APPROX. 72' - 3" EXISTING GROUTED STONE PATIO TO REPLACED WITH NEW GROUTED STONE PATIO SLOPED TO NEW CENTER DRAIN NEW DOOR TO MATCH EXISTING DOOR ON ADJACENT WALL EXISTING BEDROOM WALLS TO BE REPLACED W/ CMU CONSTRUCTION AND STONE TO MATCH EXISTING. VERIFY CONDITION AND DIMENSIONS IN FIELD. NEW P.T. 2X4 WALL HOLD OFF CONCRETE WALL 1" FILL CAVITY W/ 3 1/2" 2# CLOSED CELL SPRAY FOAM ALIGN REMOVE EXISTING STONE VENEER AND SAVE FOR REUSE, TYP. 71' - 9" A4.1 1 003 001 4 A6.3 3 A6.3 002 FD DS LOW WALL 1/4" / 12" 1/4" / 12" REMOVE EXISTING PATIO SLAB AS REQ'D TO HARD PIPE TIE IN THE DOWNSPOUT INTO THE EXISTING DECK DRAIN SYSTEM INSTALL NEW DOWNSPOUT WITHIN OPEN DOWNSPOUT. PROVIDE HEAT TAPE. EXISTING FLOOR DRAIN DOWNSPOUT NON-INSULATED PORTION OF WALL FOR HOSE BIB GENERAL NOTES: 1.) SEE SECTIONS FOR TOP OF EXISTING BEAM INFORMATION. 2.) PROPOSED PATIO HEIGHTS ARE SHOWN BASED ON ASSUMPTIONS OF EXISTING CONDITIONS INCLUDING EXISTING BEAM HEIGHTS AND EXISTING ADJACENT PATIO HEIGHTS. V.I.F. ALL EXISTING CONDITIONS. 3.) ALL NOTES APPLY TO NEW CONSTRUCTION EXCEPT WHERE NOTED WITH "EXISTING". US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Scale Date Drawn by Checked by Issue Date 4/6/2016 4:27:36 PM As indicated 84 BEAVER DAM REMODEL VAIL, CO A3.1B EXISTING LOWER LEVEL 4-05-2016 CWF Checker 4-05-2016 PERMIT SET 1/2" = 1'-0" 1 LOWER LEVEL FLOOR PLAN - EAST REVISION SCHEDULE # DESCRIPTION DATE 05/12/16