HomeMy WebLinkAboutB16-0092_A6.1_1478906466.pdfSLOPE @ 1.5% 5" STONE VENEER TO MATCH EXISTING EXISTING WALL STONE CAP TO MATCH EXISTING DRAINAGE MEDIUM OVER CONT. W.P. MEMBRANE EXISTING STEEL BEAM VERIFY HEIGHT AND SIZE IN FIELD SLOPE @ 1.5% EXISTING STONE VENEER REMOVE TOP STONE AS REQ'D AND LAP CONTINUOUS W.P. MEMBRANE OVER EXISTING W.P. MEMBRANE NEW CENTER DRAIN LAP W.P. MEMBRANE OVER DRAIN COLLAR EXISTING SLAB VERIFY HEIGHT AND THICKNESS IN FIELD VIF B.O. EXISTING STEEL/SLAB 70' - 3 3/4" FINISH PATIO 70' - 9" F.F. EXISTING FURRED WALL EXISTING DROPPED CEILING SLOPE @ 1% EXISTING FLOOR ASSEMBLY NEW TOPPING SLAB W/THICKENED EDGE EXISTING CORBEL GARAGE PROVIDE WEEP @ DRAINS NEW STEEL DECKING RE: STRUCT. REMOVE EXISTING STONE ABOVE DECK TO INSTALL NEW W.P. MEMBRANE AND DRAINAGE UP WALL MIN. 24". 4" ASSEMBLY CONSISTS OF 2"+/- FLAGSTONE TO MATCH EXISTING OVER +/- 1 1/2" GROUT OVER 1/2" ASSEMBLY OF CONTINUOUS DRAINAGE MEDIUM (RE: SPEC) AND CONT. W.P. DECK MEMBRANE. PROVIDE HEAT TUBE ATTACHED TO WELDED WIRE MESH IN 1 1/2" GROUT BED. (RE: SPEC). LAP 2ND LAYER DRAINAGE MEDIUM OVER FLASHING OVER CONTINUOUS W.P. MEMBRANE DRAINAGE MEDIUM RE:SPEC. V.I.F. 5 1/4" V.I.F. 1' - 0 13/16" 6" 1 1/2" 4"REPAIR EXISTING WALL AND PROVIDE BLOCKING AS REQ'D TO SUPPORT NEW DECK CONSTRUCTION. V.I.F. 2' - 2 1/16" W12X26 RE: EXISTING STRUCT W10X26 RE: EXISTING STRUCT EXISTING FLOOR AND WALL ASSEMBLY TO REMAIN REPAIR EXISTING WALL AND PROVIDE BLOCKING AS REQ'D TO SUPPORT NEW DECK CONSTRUCTION. RE: STRUCT. FOR SLAB CONNECTION TO EXISTING WALL. PROVIDE ACCESS HATCH, PER CODE, INTO SLAB FOR FUTURE INSPECTION OF NEW DRAIN & NEW CONSTRUCTION. STL. ANGLE RE: STRUCT. 3' - 8" +/-COPPER SHEET METAL FLASHING W/ HEMMED EDGE (TYP) GRACE ULTRA OVER COPPER FLASHING W/ GRACE LIQUID MEMBRANE TOOLED AROUND PIN STAINLESS STEEL PIN TO SECURE STONE CAP COPPER FLASHING W/ HEMMED EDGE W/ COTTEN WICKS 20" X 16" O.C. LAP BUILDING PAPER OVER WALL AND DOWN 6" MIN.. BUILDING PAPER OVER W.P. MEMBRANE, LAPPED OVER FLASHING BUILDING PAPER OVER W.P. MEMBRANE, LAPPED OVER FLASHING WHEN REMOVING EXISTING STONE BE CAREFUL NOT TO TEAR EXISTING BUILDING PAPER LAP EXISTING BUILDING PAPER OVER NEW BUILDING PAPER OVER WPM. A6.1 3 2# CLOSED CELL SPRAY FOAM INSULATION @ UNDERSIDE OF EXISTING SLAB TO ACHIEVE R49 DRAIN: ZURN Z158-85 RE: W.P. CONSULT. 7 1/2" SLOPED STRUCTURAL SLAB OVER METAL DECKING RE: STRUCT. W10X12 RE: NEW STRUCT. SLOPE @ 1.5% SLOPED STRUCTURAL SLAB OVER METAL DECKING RE: STRUCT. DRAINAGE MEDIUM OVER CONT. W.P. MEMBRANE, LAP OVER WATER PROOFING AT FDN. WALL. EXISTING STEEL BEAM NOTE: T.O. BEAM TO BE VERIFIED IN FIELD NEW CENTER DRAIN LAP W.P. MEMBRANE OVER DRAIN COLLAR EXISTING CONCRETE SLAB VIF B.O. EXISTING STEEL/SLAB 70' - 3 3/4" FINISH PATIO EXISTING FURRED WALL EXISTING DROPPED CEILING GARAGE SLOPE @ 1.5% STEEL ANGLE TO SUPPORT NEW SLAB RE: STRUCT. NEW INTERMEDIATE STEEL STRUCTURE RE: STRUCT. PROVIDE WEEP @ DRAINS NEW STEEL DECKING RE: STRUCT. EXISTING WALL TO REMAIN 10' - 8" SLOPE @ 1.5% 4 3/4" GARAGE 5' - 4 1/2" 5' - 6" 3 1/2" MAX 7 1/2" EXISTING CONCRETE SLAB W10X12 STL. BEAM RE: STRUCT. W21X101 STL. BEAM RE: EXISTING STRUCT. PROVIDE ACCESS HATCH, PER CODE, IN SLAB FOR FUTURE INSPECTION OF NEW DRAIN & NEW CONSTRUCTION. T.O. STL. BEAM @ 69' - 7 3/4" T.O. STL. BEAM @ 69' - 11" V.I.F. B.O. TOPPING SLAB @ 69' - 7 3/4" V.I.F. 2# CLOSED CELL SPRAY FOAM INSULATION @ UNDERSIDE OF EXISTING SLAB TO ACHIEVE R49 ZURN Z158-85 DRAIN PER W.P. CONSULTANT DRAIN PER W.P. CONSULTANT: ZURN Z158-85 REQUIRES 3 3/8" MIN. ASSEMBLY DEPTH ABOVE W.P.M. EXISTING STEEL NEEDS TO BE CLEANED AND PRIMED. REINFORCE WPM W/ FLEX FLASHING UN WHERE SPANS FROM CONC. TO STEEL. 7 1/2" PROVIDE R21 2# CLOSED CELL SPRAY FOAM INSULATION 4" ASSEMBLY CONSISTS OF 2"+/- FLAGSTONE TO MATCH EXISTING OVER +/- 1 1/2" GROUT OVER 1/2" ASSEMBLY OF CONTINUOUS DRAINAGE MEDIUM (RE: SPEC) AND CONT. W.P. DECK MEMBRANE. PROVIDE HEAT TUBE ATTACHED TO WELDED WIRE MESH IN 1 1/2" GROUT BED. (RE: SPEC). SLOPE @ 1% REPAIR EXISTING WALL AND PROVIDE BLOCKING AS REQ'D TO SUPPORT NEW DECK CONSTRUCTION. COPPER FLASHING W/ HEMMED EDGE W/ COTTEN WICKS 20" X 16" O.C. LAP BUILDING PAPER OVER WALL AND DOWN 6" MIN.. BUILDING PAPER OVER W.P. MEMBRANE, LAPPED OVER FLASHING LAP CONTINUOUS W.P. OVER EXISTING W.P. 70' - 3 3/4" FINISH PATIO GARAGE SLOPE 1.5 % SLOPE 1.5 % VIF B.O. EXISTING STEEL/SLAB EXISTING STEEL BEAM NOTE: T.O. BEAM TO BE VERIFIED IN FIELD EXISTING SLAB EXISTING DROPPED CEILING NEW SLAB RE: STRUCT. 4" ASSEMBLY CONSISTS OF 2"+/- FLAGSTONE TO MATCH EXISTING OVER +/- 1 1/2" GROUT OVER 1/2" ASSEMBLY OF CONTINUOUS DRAINAGE MEDIUM (RE: SPEC) AND CONT. W.P. DECK MEMBRANE. PROVIDE HEAT TUBE ATTACHED TO WELDED WIRE MESH IN 1 1/2" GROUT BED. (RE: SPEC). NEW STEEL ANGLE RE: STRUCT. STEEL ANGLE W/ NUT AND WASHER EPOXY THREADED ROD INTO CONC.;EMBEDDED 3" MIN.SIZE AND SPACE RE: STRUCT. 3" MIN. W.P. MEMBRANE EXTENDS UP WALL MIN. 24" DETAIL W.P. AROUND EACH THREADED ROD 1 1/2" DRAINAGE MEDIUM AIR AND WATER INFILTRATION BARRIER STONE VENEER US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Scale Date Drawn by Checked by Issue Date 4/6/2016 4:18:48 PM As indicated 84 BEAVER DAM REMODEL VAIL, CO A6.1 DETAILS 4-05-2016 CWF HB 4-05-2016 PERMIT SET 1 1/2" = 1'-0" 1 DETAIL @ SOUTH DECK OVER GARAGE 1 1/2" = 1'-0" 2 DETAIL @ SOUTH DECK OVER GARAGE @ GRADE 1 1/2" = 1'-0" 4 DETAIL @ DECK TRANSITION 3" = 1'-0" 3 STEEL ANGLE ANCHOR DETAIL REVISION SCHEDULE # DESCRIPTION DATE 05/12/16