HomeMy WebLinkAboutB16-0402_A4.4_1478904071.pdfMAIN LEVEL F.F.
8261' - 4 1/2"
UPPER LEVEL F.F.
8270' - 4 1/2"
LOWER LEVEL F.F.
8252' - 4 1/2"
PROPOSED NEW WALKWAY FROM
WEST DECK TO REAR DECK
A B C D E F G
EXISTING
WINDOW WELL
PROPOSED NEW SHED ROOF OVER ENTRY
6' - 9 5/8" 7' - 0 3/4" 2' - 5 1/2" 23' - 10 7/8" 22' - 0" 3' - 8 3/8"
3" / 12"
6' - 8"
OVERHANG TYPICAL
MATCH EXISTING
1 11
9
1
7
1 1
1
1
6
6
7
9
5
2
3
4
12
17
13
15
PROPOSED LIGHT FIXTURE
SEE SPEC. SHEET FOR DETAILS
DS
DS
DS
DS
PROPOSED LIGHT FIXTURE
SEE SPEC. SHEET FOR DETAILS
OVERHANG TYPICAL
MATCH EXISTING
PROPOSED 6" STEP IN BEDROOM
TO MEET EGRESS REQUIREMENTS
5
006
23
006
5
006
581
116
15
120
15
120
15
121
15
121
8A
122
17
205
17
205
22
205
12
3 3' - 7"
1
A5.4
1
A5.5
1
A5.7
1
A5.6
PROPOSED 6" STEPS TO MEET EGRESS
@ INTERIOR
6
117
8A
118
6
119
6
119
12
T.O. EXISTING STRUCTURE @ 8269' - 3"
T.O. EXISTING STRUCTURE @ 8286' - 9"
T.O. EXISTING STRUCTURE @ 8283' - 3"
EXISTING RAIL TO REMAIN AS-IS
WOOD FRAMED WALLS, FLOORS, AND,
ROOFS AND COLUMNS SHOWN WHITE
WITH SOLID BLACK LINES
REBUILT DECKING SHOWN WITH DIAGONAL HATCH
CONCRETE WALL SHOWN WITH HATCH
EXISTING WALL
NEW WALL
MODIFIED EXISTING
WALL TO ADD
INSULATION,
VAPOR BARRIER,
DRYWALL + ELEC.
ETC.
DEMOLISHED
6
A8.1
5
A8.1
4
A8.1
3
A8.1
2
A8.1
1
A8.1
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date 8/26/2016 3:38:58 PM
1250 PTARMIGAN ROAD
VAIL VILLAGE SUB, LOT 3 & 4, PT OF
BLOCK 8, VAIL, CO
1/4" = 1'-0"
CROW RESIDENCE
A4.4
ELEVATIONS
August 26th, 2016
AH
AG
August 26th, 2016
BUILDING PERMIT SET
0' 2' 4' 8' 16'
1/4" = 1'-0"
1
EAST ELEVATION
MATERIALS
1. 3X3 CEDAR TRIM
2. 8X8 COLUMN
3. 8X12 BEAM
4. 6X10 RAFTER
5.NEW STEEL HANDRAIL. SEE DETAIL @ A6.3 FOR MORE INFO
6.NEW WINDOW -NO EXISTING WINDOW @ THIS LOCATION
7.REPLACEMENT WINDOW WITH LOWER SILL THAN EXISTING
8. REPLACEMENT WINDOW WITH HIGHER HEAD THAN EXISTING
9. LINE OF EXISTING WINDOW
10. STUCCO TO BE PAINTED
11. VERTICAL WOOD SIDING
12. NEW ASPHALT SHINGLE ROOF
13. EXISTING STONE VENEER
14. REMOVE STUCCO AND REPLACE WITH MATCHING WOOD SIDING
15. SNOW FENCE
16. PROPOSED DECK COLUMN
17. NEW STANDING SEAM METAL ROOF
GENERAL NOTES:
1.) ALL WINDOWS TO BE REPLACED WITH NEW METAL CLAD WINDOWS, SIZES
ADJUSTED AS NOTED
2.) ALL SIDING TO BE REPLACED WITH NEW WOOD SIDING
3.) WEST DECKING TO BE REBUILT
4.) WINDOWS WITHOUT HEAD HEIGHT CALL OUTS ARE
TO USE EXISTING R.O. HEAD HEIGHT
5.) RUN ALL DOWNSPOUTS BELOW GRADE TO DAYLIGHT A MIN. OF 10' FROM
BUILDING AND PROVIDE HEAT TAPE @ ALL DOWNSPOUTS AND GUTTERS
REVISION SCHEDULE
# DESCRIPTION DATE
10/14/16