HomeMy WebLinkAboutB16-0444_4-H2.1_1484002828.pdf9 10 11 8 7
PERMIT COMMENTS RESPONSE:
B009 - Please provide gas pipe sizing for alternate tankless water heater(s).
RESPONSE: PLEASE REFER TO "PRICING ALTERNATES" ON
SHEET M1.0 FOR ALTERNATE GAS PIPING SIZES.
B010 - Please verify that walls comply with section 507.2.6 of the 2015 IMC.
RESPONSE: PLEASE REFER TO CAPTIVE AIRE DRAWINGS.
HOOD IS BEING FURNISHED AS "FULLY INSULATED" AND IS
LISTED FOR CLEARANCE TO COMBUSTIBLES OF ZERO
INCHES.
B011 - Please provide distance measurement from all rooftop equipment to
roof edge per section 1015.6 of the 2015 IBC.
RESPONSE: KEF-1 KITCHEN EXHAUST FAN = 7'-5"
MAU-1 MAKE-UP AIR UNIT = 12'-3"
HP-1 HEAT PUMP = 13'-4" (UPPER ROOF)
2'-8" (LOWER ROOF)
B012 - Structural engineer to analyze roof structure for the addition of
mechanical equipment - please provide engineering analysis.
RESPONSE: STRUCTURAL ENGINEERING SERVICES TO BE
PROVIDED BY OWNER.
MAIN LEVEL HVAC PLAN
SCALE: 1/4" = 1'-0"
ROOF LEVEL HVAC PLAN
SCALE: 1/4" = 1'-0"
BASEMENT LEVEL HVAC PLAN
SCALE: 1/4" = 1'-0"
12/20/16
01/09/17