Loading...
HomeMy WebLinkAboutB16-0469_Booth Creek Unit A-2 Design Review Narrative 10-30-16_1484762718.pdf rod.jvcdevelop@gmail.com www.jvcconsult.com DESIGN • REMODELING • RESIDENTIAL • COMMERCIAL • DEVELOPMENT • NEW CONSTRUCTION RODNEY BAHR 651.757 7869 Design Review Exterior Alteration Project: Town Home Renovation – Skylight Install & Gas Main Install Location: Booth Creek Townhomes Unit A-2 2875 Manns Ranch Rd Vail CO 81657 Owner/Client: Vail Six Pack LLC, c.o. Dave Inman- The Representative Contractor: JVC LLC (Colorado Division) Rep: Rodney Bahr Date Proposed: 10-31-16 Scope of Proposed Work: The new owner of this premise Vail Six Pack LLC – c/o Dave Inman has requested JVC LLC to Contract for the construction element of a complete and entire interior remodel this coming winter. JVC and the client are currently in the design phase of the exact element’s they wish to incorporate for such. However, one thing is for certain, they wish to have skylights installed in the roof and a main gas line connected to the premise. Reason being, is they are a center unit with no side windows and they have seen examples of how appropriate the introduction of skylights is to the overall ambiance and natural light preferences within the unit. It is the intent to install 4 Velux Brand fixed panel skylights, please see the following link for examples- http://www.veluxusa.com/products/skylights/fixed Attached is a Plan/Layout of the proposed locations within the existing unit conditions and proposed remodel conditions for the upper level. It is the intent to have Xcel install a Gas Meter at the existing Main location, then run a gas line to Unit A-2 via the east side of the building. Attached is a site plan of current conditions and all that is being proposed for the location of gas line etc This request now is for the Skylight and Gas Main approval only. We ask for such, so we may get them installed in the near future, prior to Winter being upon us. The Final Layout and full extent of the proposed remodel will be submitted in the next few weeks for the HOA and Town Of Vails full review and further approval of such at that time. We respectfully request that the attached be approved as submitted for Skylights and Gas Main install only at this time. Sincerely, __________________________ JVC LLC- Owner Thank you for taking the time to do review on this project. 10-31-16