Loading...
HomeMy WebLinkAboutprint_page_01-12-2017_5878107cbd45d-0.pdfPERMITS MANAGEMENT Other B16-0469.001 plans routed to Projectdox B16-0469 Create New Inspection: Project: Vail Six Pack Residence 2016 Select options Create Go to Main Inspection Grid 1 + 1 + 1 + 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Dry Wall Dry Wall ((UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 11/23/2016 Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Batt Insulation (Batt Insulation (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 11/23/2016 Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel Gas Piping (Gas Piping (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Checklist Edit Info Schedule Prerequisites Schedule Inspection Minor Framing (Minor Framing (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel Plumbing Final (Plumbing Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled 1 + 1 + Checklist Edit Info Schedule Prerequisites Schedule InspectionInfo Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Planning Final (Planning Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number B16-0469.001 Parcel