Loading...
HomeMy WebLinkAboutB16-0501_ME-1.0_1484940900.pdf' ' ISSUE LOG KEY: # DATE ISSUE LOG MECHANICAL/ELECTRICAL SHEET INDEX TITLE MECHANICAL/ELECTRICAL COVER SHEET ME-1.0 P E R M IT 09.23.2016 ISSUED AS PART OF A SET ' ' NOT PART OF SET ' ' ISSUED FOR INFORMATION ONLY * √ √ √ √ MECHANICAL/ELECTRICAL FLOOR PLANS ME-1.1 BOILER PIPING SCHEMATIC ME-1.2 ABBREVIATIONS AFC AFF AFG AHJ - ABOVE FINISHED CEILING - ABOVE FINISHED FLOOR - ABOVE FINISHED GRADE - AUTHORITY HAVING JURISDICTION AL - ALUMINUM AWG AP - ACCESS POINT - AMERICAN WIRE GAUGE BFG BMS BAS - BUILDING AUTOMATION SYSTEM - BELOW FINISH GRADE - BUILDING MANAGEMENT SYSTEM C CATV CCTV - CONDUIT - COMMUNITY (CABLE) ANTENNA TELEVISION SYSTEM - CLOSED CIRCUIT TELEVISION CKT - CIRCUIT CPU - CENTRAL PROCESSING UNIT CT - CURRENT TRANSFORMER DISP - GARBAGE DISPOSAL DW - DISHWASHER (E) - EXISTING EM - EMERGENCY EWC - ELECTRIC WATER COOLER FBO GFI FA FACP GRD GC - FIRE ALARM - FIRE ALARM CONTROL PANEL - FURNISHED BY OTHERS - GENERAL CONTRACTOR - GROUND FAULT CIRCUIT INTERRUPTER - GROUND IAW IN ACCORDANCE WITH - IC IDF IG IR LAN - INTERMEDIATE CROSS-CONNECT - INTERMEDIATE DISTRIBUTION FRAME - ISOLATED GROUND - INFRARED - LOCAL AREA NETWORK NIC MDF (N) MAIN DISTRIBUTION FRAME - NEW - NOT IN CONTRACT - NL NIGHT LIGHT - NTS NOT TO SCALE - OC PA ON CENTER - PUBLIC ADDRESS - REF REFRIGERATOR - TVSS TTB TELECOMMUNICATIONS TERMINAL BOARD - TRANSIENT VOLTAGE SURGE SUPPRESSOR - TVTB TELEVISION TERMINAL BOARD - UG UNO W V UNDERGROUND - UNLESS NOTED OTHERWISE - VOLT - WATT - WP XP WAN WLAN WAP WIDE AREA NETWORK - WIRELESS ACCESS POINT - WIRELESS LOCAL AREA NETWORK - WEATHERPROOF - EXPLOSIONPROOF - +18" DEVICE ABOVE FINISH FLOOR (VERIFY W/ ARCH ELEVS) MOUNTING HEIGHT TO CENTERLINE OF - POWER SYMBOLS SINGLE RECEPTACLE DUPLEX RECEPTACLE DOUBLE DUPLEX RECEPTACLE GFCI DUPLEX RECEPTACLE DUPLEX RECEPTACLE; HALF SWITCHED ISOLATED GROUND DUPLEX RECEPTACLE WALL MOUNTED SPECIAL OUTLET AS NOTED SPECIAL OUTLET AS NOTED JUNCTION BOX WALL MOUNTED JUNCTION BOX FLOOR MOUNTED JUNCTION BOX DUPLEX RECEPTACLE MOUNTED ABOVE COUNTER C FLUSH FLOOR MOUNTED DUPLEX RECEPTACLE FLUSH FLOOR MOUNTED DOUBLE DUPLEX RECEPTACLE FLUSH FLOOR MOUNTED DUPLEX RECEPTACLE; HALF SWITCHED FLUSH FLOOR MOUNTED DUPLEX RECEPTACLE AND TELECOM DIVISION 15 EQUIPMENT POWER CONNECTION FUSED DISCONNECT NON FUSED DISCONNECT MOTOR STARTER ENCLOSED CIRCUIT BREAKER PULL BOX PUSH BUTTON TRANSFORMER PANELBOARD OR LOADCENTER CONTACTOR ELECTRIC MOTOR METER THERMOSTAT ATS AUTOMATIC TRANSFER SWITCH ONE-LINE DIAGRAM SYMBOLS CIRCUIT HOMERUN CONDUIT RUN CONDUIT RUN BELOW GRADE CONDUIT UP CONDUIT DOWN DISCONNECT SWITCH FUSE CIRCUIT BREAKER CURRENT TRANSFORMER POTENTIAL TRANSFORMER METER SURGE PROTECTION DEVICE VOLT-METER SELECTOR SWITCH GROUND GF GROUND FAULT PROTECTION AMP-METER ST SHUNT TRIP NORMALLY OPEN CONTACT NORMALLY CLOSED CONTACT COLD WATER GROUND CONNECTION BUILDING STEEL GROUND CONNECTION TIMER SWITCH MULTI-OUTLET PLUG STRIP TIME CLOCK PHOTO-CELL SWITCH THERMAL OVERLOAD SWITCH VARIABLE SPEED SWITCH KEY SWITCH SK SV ST S PC TC TS A V SPD M T C T PB CB N -- J J J PRESSURE REDUCING VALVE SHOCK ABSORBER STRAINER W/ BLOW-OFF VALVE SAFETY RELIEF VALVE VACUUM BREAKER PRESSURE GAUGE W/ PIG TAIL & COCK THERMOMETER PRESSURE - TEMP. TAP AIR VENT PIPE ANCHOR FLEXIBLE CONNECTOR PIPE EXPANSION JOINT PIPE UNION DOUBLE CHECK BACKFLOW PREVENTER PUMP & EQUIPMENT CONNECTOR TEMPERATURE CONTROL VALVE (2-WAY) DRAIN VALVE W/ HOSE END PLUG VALVE IN RISER FLOW BALANCING VALVE GATE OR GLOBE VALVE IN RISER FLOW CONTROL VALVE BALL VALVE PLUG OR BALANCING VALVE CHECK VALVE GLOBE VALVE BUTTERFLY VALVE VENTURI/FLOW INDICATOR TEMPERATURE CONTROL VALVE (3-WAY) SOLENOID VALVE 90° ELBOW UP TEE UP TEE DOWN SHUT OFF (BALL, GATE, BUTTERFLY) PIPING SYMBOLS 90° ELBOW DN S FLOW SWITCH HOSE BIBB WALL HYDRANT TEMPERATURE CONTROLLER OR SENSOR STEAM TRAP TEST CHAMBER STEAM TRAP: FT-FLOAT & THERMOSTATIC TD-THERMODYNAMIC IB-INVERTED BUCKET TS-THERMOSTATIC BP-BALANCED PRESSURE H B W H TC FS ROOF DRAIN FLOOR DRAIN FLOOR SINK HORIZONTAL CLEANOUT VERTICAL CLEANOUT DECK/ROOF DRAIN ABOVE PIPING DESIGNATIONS SNOWMELT SUPPLY SNOWMELT RETURN NATURAL GAS MEDIUM PRESSURE GAS DOMESTIC WATER DOMESTIC HOT WATER DOMESTIC HOT WATER (TEMP. SHOWN) DHW RECIRCULATION FIRE LINE PRESSURIZED WASTE PLUMBING VENT PIPE WASTE PIPE HEATING WATER SUPPLY HEATING WATER RETURN DRAIN PIPE PLUMBING PIPING HWR HWS SMS SMR D MG G CW HW HWC 140° HW V W PW F HYDRONIC PIPING PLAN SYMBOLS CONTROL PANEL/RADIANT MANIFOLD CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR DIAGRAM CONTINUATION REFERENCE PLUMBING/HVAC RISER POINT OF NEW CONNECTION DUCT STATIC PRESSURE SENSOR ROOM PRESSURE SENSOR EMERGENCY POWER OFF SWITCH ACCESS PANEL SNOWMELT MANIFOLD SECTION CUT LETTER/SHEET SHOWN ON POINT OF DISCONNECTION - SP CO2 EPO P CO -- -P THERMOSTAT HUMIDISTAT REMOTE TEMPERATURE SENSOR T S H MECHANICAL SPECIFICATIONS: 1. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. 2. ALL CONTRACTORS SHALL BE LICENSED, EXPERIENCED, AND THOROUGHLY KNOWLEDGEABLE IN THEIR RESPECTIVE AREAS OF THE CONSTRUCTION INDUSTRY AND SHALL PERFORM IN A RESPONSIBLE MANNER WITH ESTABLISHED CONSTRUCTION SEQUENCE, SHALL RECOGNIZE THE PRIORITY OF THE CONSTRUCTION DOCUMENTS, AND SHALL INFORM THE OWNER OF POTENTIAL PROBLEMS WHEN THE CONSTRUCTION DOCUMENTS ARE UNCLEAR OR INCONSISTENT. 3. INASMUCH AS DESIGN FOR REMODEL AND/OR REHABILITATION REQUIRES THAT CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS, AND BECAUSE SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING, THE ENGINEER CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL CONSULTING SERVICES HEREIN ENCOMPASS ALL CONTINGENCIES. FIELD COORDINATION DURING CONSTRUCTION IS IMPERATIVE. MAKE REASONABLE ALLOWANCES FOR UNSEEN CONDITIONS. 4. THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL NOT BE HINDERED BY THIS WORK. ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED DUE TO THE DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES, FURNITURE, EQUIPMENT, ETC.; AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE ACCESSIBLE WHEN COMPILING HIS BID]. 5. BE RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT OR DUCTWORK REMAINING TO BE CONNECTED TO NEW OR EXISTING SYSTEMS. PROVIDE DUCTWORK, PIPING, CONTROLS, DIFFUSERS, ETC., AS REQUIRED TO RESTORE CONTINUITY OF SYSTEM (S), OR TO MAKE NEW WORK MEET EXISTING CONDITIONS, WHETHER INDICATED OR NOT. 6. IF NOT SPECIFICALLY DEFINED IN THESE CONSTRUCTION DOCUMENTS, MATERIALS AND/OR EQUIPMENT SHALL BE IDENTIFIED BY THE SUBCONTRACTOR WITH SUFFICIENT TIME TO ALLOW SELECTION, PURCHASE, AND DELIVERY TO MAINTAIN CONSTRUCTION SCHEDULE. 7. PROVIDE MECHANICAL DEMOLITION AS REQUIRED. REFER TO DEMOLITION DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED. VISIT SITE PRIOR TO BID TO DETERMINE EXTENT OF WORK INVOLVED. EXISTING FIXTURES, MECHANICAL EQUIPMENT, ETC., BEING REMOVED SHALL BE RETURNED TO THE OWNER. DISPOSE OF ALL REMOVED PIPING, DUCTWORK, ETC. UNLESS NOTED OTHERWISE. PIPES, DUCTWORK, EQUIPMENT, ETC. TO BE REMOVED, ARE SHOWN HATCHED, UNLESS OTHERWISE NOTED. 8. ALL DUCTWORK, DIFFUSERS, PIPING, FIXTURES, AND EQUIPMENT SHOWN IN LIGHT LINE WEIGHT IS EXISTING, NEW INDICATED BY HEAVIER LINE WEIGHT, EXCEPT WHERE NOTED. PIPES, DUCTWORK, EQUIPMENT, ETC. TO BE REMOVED, ARE SHOWN HATCHED. 9. OFFSET PIPING, DUCTWORK, ETC. AS NECESSARY TO ACCOMMODATE STRUCTURE, BEAMS, AND COLUMNS, AND EXISTING EQUIPMENT. 10. ALL EXISTING SUPPORT RODS AND STRAPS NOW SUPPORTING DUCTS, PIPES, AIR TUBING, ELECTRICAL CONDUIT, ETC. THAT ARE REMOVED TO ALLOW ROOM FOR INSTALLATION OF NEW EQUIPMENT SHALL BE RELOCATED AND REINSTALLED, OR REPLACED IF DAMAGED. 11. WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT, OWNER, AND ENGINEER. 12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM HIS/HER WORK IN CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES AND LIFE SAFETY FEATURES AS REQUIRED BY LOCAL, STATE, OR NATIONAL AUTHORITIES. THE CONTRACTOR SHALL VERIFY WITH THE ARCHITECT IF MODIFICATION OF HIS/HER WORK IS REQUIRED FOR COMPLIANCE. 13. ALL WORK OF ALL TRADES MUST BE IN STRICT COMPLIANCE, OR EXCEED THE MINIMUM MATERIAL AND METHOD REQUIREMENTS OF THE 2015 VERSION OF THE INTERNATIONAL BUILDING, MECHANICAL, PLUMBING, ENERGY CONSERVATION, AND FIRE CODES AND THE 2014 NATIONAL ELECTRICAL CODE, MOST CURRENT NFPA, ALL LOCAL ORDINANCES AND AMENDMENTS AND MANUFACTURER'S INSTALLATION RECOMMENDATIONS. IF A CONFLICT BETWEEN THOSE PUBLICATIONS EXISTS, THE MOST STRINGENT REQUIREMENT SHALL APPLY. 14. PAY FOR AND SECURE ALL REQUIRED PERMITS AND INSPECTIONS. 15. WARRANTY THE INSTALLATION AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP. THE WARRANTY SHALL BE FOR A PERIOD OF ONE YEAR AFTER OWNER'S ACCEPTANCE. DEFECTS SHALL BE PROMPTLY REMEDIED WITHOUT COST TO THE OWNER. 16. SUBMIT RECORD DOCUMENTS TO OWNER. DOCUMENTS SHALL INCLUDE ALL ADDENDUM ITEMS, CHANGE ORDERS, ALTERATIONS, RE-ROUTINGS, ETC. 17. SYSTEMS SHALL BE COMPLETE, OPERABLE, AND READY FOR CONTINUOUS OPERATION PRIOR TO ACCEPTANCE BY THE OWNER. 18. SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. PERFORM AT A MINIMUM ALL CODE REQUIRED TESTS OR SYSTEMS. IF TESTS OF WORK ARE DEFECTIVE, CONTRACTOR SHALL MAKE CORRECTIONS NECESSARY AT NO ADDITIONAL COST TO OWNER. 19. ALL MATERIALS AND/OR EQUIPMENT SHALL BE HANDLED AND INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. 20. SUBMIT ALL MECHANICAL DIVISION SHOP DRAWING AND PRODUCT DATA AT ONE TIME. PARTIAL SUBMITTALS WILL BE REJECTED. 21. SHOP DRAWING SUBMITTALS SHALL STATE CAPACITIES, SIZES, ETC., OF ALL EQUIPMENT AND SHALL BE CERTIFIED AND INCLUDE COMPUTER BASED PROJECT SPECIFIC SELECTIONS WHERE APPLICABLE. CLEARLY MARK EACH SHOP DRAWING, CATALOG CUT AND/OR SPECIFICATION SHEET TO INDICATE THOSE PRODUCTS AND FEATURES WHICH ARE INTENDED TO BE FURNISHED. SPECIFICALLY INDICATE ANY DEVIATIONS FROM THE DESIGN INTENT. ENGINEER RESERVES THE RIGHT TO REQUIRE CORRECTION AT NO COST TO OWNER FOR DEVIATIONS NOT SPECIFICALLY INDICATED IN THE SUBMITTALS. REVIEW AND APPROVAL OF SHOP DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF FURNISHING EQUIPMENT AND MATERIALS OF PROPER DIMENSION, SIZE, QUANTITY, QUALITY AND ALL PERFORMANCE CHARACTERISTICS TO EFFICIENTLY PERFORM THE REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS. SUBMITTAL SHALL BE BOUND AND INDEXED IN A NEAT AND ORDERLY MANNER. 22. FAILURE TO ORDER, OR RELEASE ORDER FOR MATERIALS AND/OR EQUIPMENT WILL NOT BE ACCEPTED AS A REASON TO SUBSTITUTE ALTERNATE MATERIALS, EQUIPMENT, OR INSTALLATION METHODS. 23. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN CONTINUITY, APPEARANCE OR FUNCTION. 24. PROVIDE 4” HIGH CONCRETE EQUIPMENT PADS BENEATH FLOOR MOUNTED MECHANICAL EQUIPMENT, IN ADDITION TO ANY BASE ASSEMBLIES REQUIRED OR RECOMMENDED BY THE MANUFACTURER. 25. FIRE STOPPING REQUIREMENT. PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTABLE MATERIALS INCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE, METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK FOR BARE PIPE, METAL CONDUIT, AND BUILDING CONSTRUCTION GAPS; 3M CP-25 CAULK AND FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES, PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE. SUBMIT UL LISTED APPLICATION DATA FOR EACH TYPE OF PENETRATION ENCOUNTERED. 26. CAREFULLY VERIFY ELECTRICAL SERVICE VOLTAGE AND PHASE AVAILABLE. 27. SUBMIT A WRITTEN BALANCE REPORT BY A NEBB OR AABC CERTIFIED BALANCING CONTRACTOR. BALANCING PROCEDURES SHALL BE IN ACCORDANCE WITH NEBB OR AABC GUIDELINES FOR PROPORTIONAL BALANCE. SUBMIT REPORT ON STANDARD NEBB FORMS OR SUBMIT FORMS FOR REVIEW PRIOR TO BALANCING. MEASUREMENTS SHALL INCLUDE ALL MOTOR AMPERAGE AND VOLTAGE READINGS; MOTOR AND FAN RPMS; STATIC PRESSURE AT INLET AND OUTLET OF ALL PACKAGED EQUIPMENT, FANS, COILS, AND FILTERS; PITOT TUBE MEASUREMENT OF SUPPLY, EXHAUST, RETURN, AND OUTSIDE AIR MAIN DUCTS, AT MINIMUM OUTSIDE AIR, AND 100% (ECONOMIZER) OUTSIDE AIR; VELOCITY DISTRIBUTION ACROSS THE FACE OF FILTERS; AIR INLET AND OUTLETS; WATER FLOW AT ALL FLOW MEASUREMENT STATIONS; INLET AND OUTLET PRESSURE AT PUMPS WITH FLOW CALCULATED FROM THE PUMP CURVE; WATER FLOW, TEMPERATURE DROP, AND PRESSURE DROP AT ALL COILS. 28. SUPPORT PIPE WITH ROD AND CLEVIS, RING HANGERS, TRAPEZE, OR CLAMPS. NO PIPE TAPE OR STRAPPING ALLOWED. ALL HANGERS SHALL BE SIZED FOR OD OF INSULATION, IF ANY. PROTECT INSULATED LINES WITH 20 GA SHEET METAL SHIELDS AND PROVIDE CALCIUM SILICATE INSULATION INSERTS FOR ALL INSULATED PIPING. MAINTAIN VAPOR BARRIER ON ALL COLD LINES. ISOLATE BARE COPPER LINES FROM HANGERS WITH VIBRASORB OR EQUIVALENT, COPPER COATED HANGERS ARE NOT SUFFICIENT, WRAPPING PIPE WITH TAPE NOT ACCEPTABLE. 29. COPPER PIPE VALVES AND SPECIALTIES A. GATE VALVES - BRONZE, CLASS 125, 200 LB. W.O.G. B. BALL VALVES - BRONZE, CLASS 125, 600 LB. W.O.G. C. CHECK VALVES - BRONZE, CLASS 125, 200 LB. W.O.G. D. BALANCING VALVES - 125 PSI W.P. FOR 250 DEGREE FAHRENHEIT SERVICE TIGHT SHUTOFF, TOUR AND ANDERSON STA, ARMSTRONG CBV, GERAND, OR FLOWSET, B&G CIRCUIT SETTER. E. DIRECT UNIONS: FURNISH AND INSTALL A DIELECTRIC UNION AT EACH CONNECTION BETWEEN DISSIMILAR METALS. 30. AS PIPING: SCHEDULE 40 BLACK STEEL PIPE, 150 LB. MALLEABLE IRON SCREWED FITTINGS ON ABOVE GROUND PIPE, WELDED FITTINGS WITH ALL PIPING COATED AND WRAPPED ON BURIED PIPE. 31. GAS VALVES: NON-LUBRICATED BALL STYLE VALVE WITH RESILIENT SEATS, AND ADJUSTABLE GLAND PACKING NUT, AGA AND UL LISTED FOR NATURAL GAS SERVICE. 32. FILL HEATING WATER SYSTEM WITH 20% PROPYLENE GLYCOL/WATER SOLUTION AND FILL SNOWMELT SYSTEM WITH 50% PROPYLENE GLYCOL/WATER SOLUTION. 33. GRADE AND VALVE ALL HEATING, CHILLED AND SNOWMELT WATER PIPING WITH 3/4” HOSE END VALVES TO PERMIT COMPLETE DRAINAGE OF THE SYSTEM. VENT ALL HIGH POINTS IN EQUIPMENT ROOMS AS NECESSARY WITH AUTOMATIC AIR VENTS PIPED TO CONVENIENT DRAIN. ALL HIGH POINTS IN SYSTEM OUTSIDE OF EQUIPMENT ROOMS WITH COMBINATION AUTOMATIC/MANUAL AIR VENTS AS REQUIRED TO RELIEVE AIR IN THE SYSTEM. 34. MATERIALS; HYDRONIC PIPING A. ABOVE GRADE, UP THROUGH 2-1/2”: SCHEDULE 40 STEEL PIPE WITH MALLEABLE IRON THREADED FITTINGS, OR TYPE “L” COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95-5 NO LEAD SOLDER. B. ABOVE GRADE, 3” AND LARGER: SCHEDULE 40 STEEL PIPE WITH CAST IRON OR STEEL WELDING FITTINGS. 35. DRAIN AND RECEPTOR PIPING FOR COMBUSTION CONDENSATE--NOT BURIED--TYPE: SCHEDULE 40 SOLID-WALL PVC, PVC FITTINGS, AND PVC CEMENT. PROVIDE NEUTRALIZATION SYSTEMS AS RECOMMENDED BY COMBUSTION APPLIANCE MANUFACTURER. 36. INDOOR PIPING INSULATION - INSULATE ALL NEW HEATING WATER PIPING WITH UL APPROVED, WHITE, ALL SERVICE, MINERAL FIBER, SNAP-ON, PIPE INSULATION. INSULATE FITTINGS WITH MINERAL FIBER BLANKET INSULATION AND PRE-MOLDED PVC COVERS. ALL MATERIALS SHALL HAVE A SMOKE DEVELOPED RATING OF 50 OR LESS AND A FLAME SPREAD RATING OF 25 OR LESS. PROVIDE CALCIUM SILICATE THERMAL INSERT AT HANGERS AND SUPPORTS. INSULATION SHALL PASS UNINTERRUPTED THROUGH HANGERS. VAPOR BARRIERS SHALL BE CONTINUOUS, AND SEALED WITH “NON-BREATHING” VAPOR BARRIER MASTIC ON PIPING OPERATING AT TEMPERATURES BELOW AMBIENT. ALL RAW EDGES OF INSULATION SHALL BE NEATLY TRIMMED AND SEALED WITH MASTIC. A. INSULATION THICKNESS BELOW BASED ON INSULATION CONDUCTIVITY VALUE NOT EXCEEDING 0.27 BTU*IN/(HR*FT^2*°F): 1) HEATING WATER (LESS THAN 200°F) - NPS 1.25 AND LESS, 1.5” THICK; NPS 1.5 AND GREATER, 2” THICK. RUNOUTS WITHIN 4 FEET OF TERMINAL AND 1” PIPE DIAMETER OR LESS, 1” THICK. 37. IDENTIFICATION: LABEL ALL NEW PIPING AND EQUIPMENT. PROVIDE FULL BAND OR STRIP TYPE MARKERS AND FLOW ARROWS ON PIPING. PROVIDE ENGRAVED PLASTIC VALVE TAGS WITH VALVE NUMBER AND ATTACH WITH STANDARD CHAIN OR S-HOOKS. PROVIDE ENGRAVED PLASTIC SIGN ON OR NEAR SPECIFIED EQUIPMENT. ELECTRICAL SPECIFICATIONS: 1. CONTRACTOR SHALL REVIEW ARCHITECTURAL, MECHANICAL, AND OTHER DRAWINGS. 2. WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT. 3. ALL NEW CONSTRUCTION SHALL ADHERE TO REQUIREMENTS OF THE 2008 NATIONAL ELECTRICAL CODE, 2003 INTERNATIONAL BUILDING CODE, 2003 INTERNATIONAL ENERGY CONSERVATION CODE, AND ALL OTHER LOCAL BUILDING CODES. IN THE EVENT OF A CONFLICT BETWEEN THE CONSTRUCTION DOCUMENTS AND THE DOCUMENTS LISTED ABOVE, THE CONTRACTOR SHALL CONSULT THE ENGINEER OF RECORD PRIOR TO PROCEEDING WITH THE INSTALLATION IN QUESTION. 4. “PROVIDE” SHALL BE DEFINED AS “FURNISH AND INSTALL.” 5. PROVIDE ALL PERMITS AND INSPECTIONS REQUIRED. 6. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND SHALL NOT BE USED TO SCALE. VERIFY DIMENSIONS ON ARCHITECTURAL DRAWINGS AND IN FIELD PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL COORDINATE LIGHT FIXTURES, DEVICES, AND EQUIPMENT LOCATIONS WITH THE WORK OF OTHER TRADES PRIOR TO ROUGH-IN AND/OR INSTALLATION. COORDINATE WITH OTHER TRADES FOR CONNECTIONS TO EQUIPMENT. 7. ALL ELECTRICAL SYSTEM COMPONENTS SHALL BE LISTED OR LABELED BY UNITED LABORATORIES (UL) OR OTHER RECOGNIZED TESTING FACILITY. 8. CONTRACTOR'S FAILURE TO ORDER OR RELEASE ORDER FOR MATERIALS AND/OR EQUIPMENT WILL NOT BE ACCEPTED AS A REASON TO SUBSTITUTE ALTERNATE MATERIALS, EQUIPMENT, OR INSTALLATION METHODS. 9. INSTALL ALL MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. ANY DEVIATIONS SHALL BE BROUGHT TO THE ARCHITECT AND/OR ENGINEER'S ATTENTION PRIOR TO INSTALLATION. 10. THE CONTRACTOR SHALL PROVIDE APPROPRIATE FIRESTOPPING FOR ALL FIRE RATED ASSEMBLY PENETRATIONS. FIRESTOPPING SYSTEM SHALL BE UL LISTED AND TESTED IN ACCORDANCE WITH ASTM E814 OR ASTM E119 WITH AN F RATING EQUAL TO THE FIRE RATING OF PENETRATED ASSEMBLY. 11. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE UPDATED DIRECTORIES FOR ALL PANELBOARDS AND LOAD CENTERS. DIRECTORIES SHALL BE COMPUTER GENERATED USING WORD PROCESSING OR SPREADSHEET GENERATION SOFTWARE AND INSTALLED UNDER CLEAR PLASTIC COVERS. EACH CIRCUIT SHALL BE IDENTIFIED AS TO ITS SPECIFIC PURPOSE OR USE. THE IDENTIFICATION SHALL BE SUFFICIENTLY DETAILED TO DISTINGUISH EACH CIRCUIT FROM ALL OTHERS. ROOM NAMES AND NUMBERS SHALL BE AS DIRECTED BY OWNER. 12. WIRING DEVICES SHALL BE SPECIFICATION GRADE, RATED 20 AMPERES FOR LIGHT SWITCHES AND 20 AMPERES FOR DUPLEX RECEPTACLES. THE COLOR OF THE DEVICES AND COVER PLATES SHALL BE AS SELECTED BY ARCHITECT. 13. ALL NEW JUNCTION BOX COVERS SHALL BE CLEARLY LABELED AND IDENTIFIED WITH THE BRANCH CIRCUIT(S) CONTAINED WITHIN, INCLUDING THE SOURCE PANELBOARD NAME, ON THE FACE OF THE JUNCTION BOX COVER. 14. WIRE SHALL BE COPPER, 75 DEGREE CELSIUS RATED FOR GENERAL USE UNLESS INDICATED OTHERWISE ON THE DRAWINGS. WIRING WITHIN 3 INCHES OF FLUORESCENT BALLASTS WIRE SHALL BE COPPER, MINIMUM 90 DEGREE CELSIUS RATED. SIZES INDICATED ARE FOR INSTALLATION IN A MAXIMUM 30 DEGREE CELSIUS AMBIENT. CONDUCTOR AMPACITY SHALL BE DERATED FOR HIGHER AMBIENT INSTALLATIONS. 15. ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS. EMT FITTINGS SHALL BE MALLEABLE IRON OR STEEL. CONNECTORS SHALL BE INSULATED THROAT TYPE. MINIMUM CONDUIT SIZE IS 3/4”. FOLLOW NEC FOR MAXIMUM NUMBER OF CONDUCTORS PER CONDUIT. CONDUIT SHALL BE OF SUFFICIENT SIZE AND CONDUCTOR QUANTITY SHALL BE LIMITED TO ELIMINATE THE NEED TO DERATE CONDUCTORS. METAL CLAD CABLING SHALL NOT BE PERMITTED. 16. ALL EMPTY RACEWAY SYSTEMS SHALL HAVE A 200LB NYLON PULL STRING OR EQUIVALENT AND SHALL BE IDENTIFIED AT ALL JUNCTION, PULL, AND TERMINATION POINTS USING PERMANENT METALLIC TAGS. TAG SHALL INDICATE INTENDED USE OF CONDUIT, ORIGINATION, AND TERMINATION POINTS OF EACH INDIVIDUAL CONDUIT. 17. ALL NEW EMERGENCY LUMINAIRES SHALL MEET UL924, AS WELL AS ALL APPLICABLE SECTIONS OF NFPA 101, NEC, AND OSHA ILLUMINATION STANDARDS. 18. FINAL CONNECTIONS TO EQUIPMENT SHALL BE IN ACCORDANCE WITH MANUFACTURER'S APPROVED WIRING DIAGRAMS, DETAILS, AND INSTRUCTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE MATERIALS AND EQUIPMENT COMPATIBLE WITH EQUIPMENT SUPPLIED. 19. THE FINAL SIX (6) FEET OF ALL CONNECTIONS TO MOTORS, TRANSFORMERS, AND OTHER VIBRATING EQUIPMENT SHALL BE SEAL-TITE FLEX (OR EQUIVALENT) WITH APPROVED FITTINGS. DO NOT SECURE CONDUITS, DISCONNECTS, OR DEVICES TO DUCTWORK OR MECHANICAL EQUIPMENT. 20. SYSTEMS SHALL BE COMPLETE, OPERABLE, AND READY FOR CONTINUOUS OPERATION. LUMINAIRES, SWITCHES, RECEPTACLES, MOTORS, ETC. SHALL BE CONNECTED AND OPERABLE. 21. CONTRACTOR SHALL GUARANTEE THE INSTALLATION AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP WHICH MAY OCCUR UNDER NORMAL USAGE FOR A PERIOD OF ONE YEAR AFTER OWNER'S ACCEPTANCE. DEFECTS SHALL BE PROMPTLY REMEDIED WITHOUT COST TO THE OWNER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING EQUIPMENT WHICH IS DAMAGED DUE TO INCORRECT FIELD WIRING PROVIDED UNDER THIS SECTION OR FACTORY WIRING IN EQUIPMENT PROVIDED UNDER THIS SECTION. 23. SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. IF TESTS SHOW THAT WORK IS DEFECTIVE, CONTRACTOR SHALL MAKE NECESSARY CORRECTIONS AT NO COST TO THE OWNER. 24. CONDUCTOR COLOR CODING SHALL BE CONSISTENT THROUGHOUT THE ENTIRE PROJECT. 25. LOAD CENTERS SHALL NOT BE USED IN LIEU OF PANELBOARDS UNLESS SPECIFICALLY INDICATED ON DRAWINGS OR APPROVED BY ENGINEER OF RECORD. BUS BARS SHALL BE ALUMINUM AND LUGS SHALL BE ALUMINUM CAPABLE OF LANDING COPPER OR ALUMINUM CONDUCTORS. Designed: Reviewed: Project No: DAL DAL 8739.00 PH-002 Issued: PERMIT SET 09.23.2016 S:\BGPROJECTS\8739.00 VVMC – ON CALL CONSULTING SERVICES\CAD\DRAWINGS\VVMC - MPB - BOILER UPGRADE\873900ME10.DWG 12.21.16 10:16:57 AM Scale: As Shown VVMC - MPB BOILER UPGRADE VAIL, COLORADO 81657 Sheet Title: Sheet No: Date: © 2016 BG BUILDINGWORKS INC. Current Issue: PERMIT SET ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com 09.23.2016 MECHANICAL / ELECTRICAL COVER SHEET ME-1.0 01/20/17