HomeMy WebLinkAboutB17-0053_A2.1_1493400840.pdf12 .0'
10.0'
D
Y
H
CS
CS
CS
S
E
T
93.4
90.2
80.6
79.5
79.6
79.4 79.4
83.5
84.9
86.4
89.4
91.3
92.4
92.7
92.9
93.1
93.0
92.7
82.2
85.4
TV
0.1'
0.1'
0.1'
0.1'
0.1'
0.1'
1.0'
1.0'
1.0'
1.0'
1.0'
1.0'
1.0'
0.5'
0.5'
0.1'
0.5'
0.5'
0.5'
0.5'
0.5'
0.5'
0.5'
80
82
WATER LINE
PLANTER
CONC. PAN
DECK @
UPPER LEVEL
DECK @ MAIN LEVEL
PATIO @ L.L.
N
N
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
2" / 12"
2" / 12"
2" / 12"
SNOW STORAGE
2" / 12"
2240 Chamonix Lane, Vail, CO
Zone District: Two-Family Primary/Secondary Residential ( PS )
Lot is .3558 acres, equal to 15,499 SF
LANDSCAPE AREA: The area of a site not covered by buildings, driveways, and covered walkways. Core development
(hardscape) such as walks, decks, patios, terraces, water features, and like features shall also be considered landscape area
as long as they do not exceed twenty percent (20%) of the landscape area.
Landscape Area
Lot Size 15,499 SF
60% Landscape Area Requirement 9,300 SF
Lot Size 15,499 SF
LESS
Building Footprint / Driveway -6,199 SF
Total Landscape Area 9,300 SF
Total Hardscape Area Provided (12%) 980 SF
Total Softscape Area Provided 8,320 SF
= BUILDING FOOT PRINT AND DRIVE
= LANDSCAPE AREA
=HARDSCAPE AREA
E7990
E88
E86
E84
E82
E92
E92
E7990
E88
E86
E84
E82
E7980
EDGE OF
ASPHALT
CURB & GUTTER CHAMONIX LN
SIGN
LIGHT
FIRE
HYD
SHED
LOT 1
WATER
CURBSTOP
(TYP.)
N84
N86
N88
E7980
N82
N88
N90
N92
N94
N92
E7980
N80
N80
N80
2" / 12"
2" / 12"
LOWER LEVEL F.F. / GARAGE @ 81' - 6 3/4"
MAIN LEVEL GARAGE F.F. @ 92' - 2 1/2"
MAIN LEVEL F.F. @ 92' - 4 3/4"
UPPER LEVEL F.F. @ 103' - 7 3/4"
E88
E86
E84
E82
N80
2
4" / 12"
2
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date 3/23/2017
12:56:12 PM
1/8" = 1'-0"
LILES RESIDENCE
2440 CHAMONIX LANE
VAIL, CO 81657
A2.1
LANDSCAPE
COVERAGE
3-23-2017
CPM
HB
3-23-2017
PERMIT SET
1/8" = 1'-0"
1
LANDSCAPE CALC
0' 4' 8' 16' 32' NORTH
REVISION SCHEDULE
# DESCRIPTION DATE
2 CHANGES TO
APPROVED
PLANS
3-23-17
04/28/17