Loading...
HomeMy WebLinkAboutB17-0053_A6.6_1493402459.pdfINTERIOR GRID LINE T.O. SLAB RE: FLOOR PLANS EXTERIOR RE: STRUCT RE: STRUCT RE: STRUCT. RE: STRUCT. SLOPE RE: PLANS 1" 3" PATIO ASSEMBLY SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES SEE DETAIL 1/A6.2 FOR TYP. STONE PATIO ASSEMBLY L METAL FLASHING TURN UP 1/2" @ BACK EDGE OF DOOR PFSM FLASHING RE: SPEC TURN UP WALL AND UNDER WINDOW/ DOOR SILL DOOR SILL SET IN BED OF SEALANT OVER PFSM FLASHING OVER ICE AND WATER SHIELD OVER L METAL FLASHING W.P. MEMBRANE CONTINUOUS UNDER DOOR SILL LAP OVER L METAL AND CONTINUE DOWN WALL & LAP OVER CONC FOUNDATION W.P. MEMBRANE MIN 6" INTERIOR OF GARAGE EXTERIOR RE: STRUCT. RE: STRUCT. SLOPE GRID LINE 7" T.O. CONRETE SLAB RE: FLOOR PLANS 2" 1/2" RE: STRUCT. 1" 1 1/2" SLOPE T.O. CONRETE WALL RE: STRUCT 3"4"4" 2 1/2" SLOPE RE: PLANS WALL ASSEMBLY PER 1/A6.7 PFSM FLASHING RE: SPEC 6" MIN. SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES SEE DETAIL 1/A6.4 FOR TYP. GARAGE FOUNDATION NOTES RE: STRUCT. RE: STRUCT. TURN W.P. MEMBRANE UP WALL & BLOCKING 6" MIN. PRESSURE TREATED WOOD LEDGER RE: STRUCT. JOIST HANGER RE: STRUCT. T.O. CONRETE SLAB RE: FLOOR PLANS T.O. PLYWOOD RE: FLOOR PLANS RE: STRUCT RE: STRUCT. GRID LINE 1" DOOR SILL SET IN BED OF SEALANT SEE 1/A6.2 FOR TYP. STONE PATIO ASSEMBLY 8" RE: STRUCT. SLOPE RE: PLANS SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES INTERIOR EXTERIOR MECHANICAL / STORAGE ROOM FILL JOIST CAVITY W/ BLOWN-IN INSULATION RE: SPEC TJI FLOOR JOISTS RE: STRUCT. METAL "L" FLASHING W/ 1/2" TURN UP BACK EDGE OF DOOR PAINTED EPOXY FINISH @ MECH ROOM FLOOR PFSM FLASHING RE: SPEC - TURN UP WALL AND UNDER WINDOW/ DOOR SILL 3/4" T&G PLYWOOD RE: STRUCT. 2 1/4" FLOOR ASSEMBLY 2" 2# CLOSED CELL SPRAY FOAM INSULATION BETWEEN 2X FURRING P.T. BOTTOM PLATE 5/8" GWB LINE OF 2X P.T. FURRING HELD 1" OFF OF CONC. FOUNDATION WALL. SHIM AND SECURE TO CONC. WALL AS REQ'D 1/2" 2" 1 1/2" 1" 2 1/2" 3/4" FINISH FLOOR RE: FLOOR PLANS AND SPEC PRESSURE TREATED BOTTOM PLATE W.P. MEMBRANE CONTINUOUS UNDER DOOR SILL LAP OVER L METAL AND CONTINUE DOWN WALL & LAP OVER CONC FOUNDATION W.P. MEMBRANE MIN 6" INTERIOR OF GARAGE EXTERIOR RE: STRUCT. RE: STRUCT. SLOPE GRID LINE T.O. CONRETE SLAB RE: FLOOR PLANS RE: STRUCT. SLOPE T.O. CONRETE WALL RE: STRUCT SLOPE RE: PLANS WALL ASSEMBLY PER 1/A6.7 SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES SEE DETAIL 1/A6.4 FOR TYP. GARAGE FOUNDATION NOTES 3" MIN. 6" MIN. PFSM FLASHING RE: SPEC EXTENDS INTO GRADE MIN 3" INTERIOR OF GARAGE P.T. BLOCKING TURN W.P. MEMBRANE UP WALL & BLOCKING 6" MIN. INTERIOR OF GARAGE EXTERIOR RE: STRUCT. RE: STRUCT. SLOPE GRID LINE T.O. CONRETE SLAB RE: FLOOR PLANS 2" 1/2" RE: STRUCT. 1" 1 1/2" SLOPE 2 1/2" SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES SEE DETAIL 1/A6.4 FOR TYP. GARAGE FOUNDATION NOTES RE: STRUCT. RE: STRUCT. TURN W.P. MEMBRANE UP WALL & BLOCKING 6" MIN. SEE DETAIL 1/A6.2 FOR TYP. STONE PATIO ASSEMBLY NOTES STONE VENEER WALL ASSEMBLY PER 4/A6.7 DRAINAGE MEDIUM CONTINUOUS OVER FLASHING SO WALL CAN DRAIN PFSM FLASHING EXTENDS UP BEHIND AIR INFILTRATION BARRIER MIN. 4" RE: SPEC. PROVIDE CONC. CURB UP TO HEIGHT OF FLAGSTONE UNDER VENEER SO THAT WALL CAN DRAIN T.O. CONRETE WALL RE: STRUCT SLOPE RE: PLANS INTERIOR OF GARAGE SEE DETAIL 1/A6.2 FOR TYP. STONE PATIO ASSEMBLY EXTERIOR SLOPE PER PLANS STRUCT. SLAB RE: STRUCT. THICKENED EDGE RE: STRUCT. 3" US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Scale Date Drawn by Checked by Issue Date 3/23/2017 1:08:06 PM 1 1/2" = 1'-0" LILES RESIDENCE 2440 CHAMONIX LANE VAIL, CO 81657 A6.6 FOUNDATION DETAILS 3-23-2017 CPM HB 3-23-2017 PERMIT SET 1 1/2" = 1'-0" 1 FOUNDATION DETAIL @ LOWER LEVEL PATIO DOOR SILL 1 1/2" = 1'-0" 2 FOUNDATION DETAIL @ GARAGE GUEST PARKING 1 1/2" = 1'-0" 3 FOUNDATION DETAIL @ MUD ROOM ENTRY DOOR THRESHOLD 1 1/2" = 1'-0" 4 FOUNDATION DETAIL @ GARAGE PLANTER 1 1/2" = 1'-0" 5 FOUNDATION DETAIL @ MUDROOM ENTRY FLAGSTONE 1 1/2" = 1'-0" 6 FOUNDATION DETAIL @ EDGE OF PATIO REVISION SCHEDULE # DESCRIPTION DATE 04/28/17