Loading...
HomeMy WebLinkAboutDRB140115_D2-02_1399407900.pdf 41Fkit 74„, .4141111011 ICC rig 1 1003 VP DRB APPROVED 5/6/2014 12:00:00 AM Ia — Ia all . iRi ■ ■ lli NEIN Wm 4 © 6 O 8 DAVIS PARTNERSHIP ARCH ITECTS Denver 2301 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Vail 0225 Main Street, Unit C101 Edwards, CO 81632 970.926.8960 – 1 J L, Consultant rlREM VE LIGHT FOR REUSE. MOVE J-BOX TO NEW DEMOLISH THE WALL AS REQUIRED TO PREPARE FOR i LOCA ION, PATCH AND REPAIIR WALL FINISH. THE ATTACHMENT OF THE NEW DECK JOISTS. / / i i i II i CO O DEMOLISH TOP OF i /CT WALL AS REQUIREDCi) SCOTT MICHAEL O FOR RAILING EXISTING SPA * NEVIN 202985 6, DEMOLISH WALL AS REQUIRED TO PREPARE FOR THE ATTACHMENT OF THE NEW STAIR Issue/Revisions Date No. i REMOVE LIGHT FOR REUSE. MOVE J-BOX TO NEW LOCATION, PATCH AND REPAIR WALL FINISH. DEMOLISH EXISTING STAIR AND STRINGERS, PATCH AND REPAIR FLOOR AND WALLS AS DEMOLISH TOP OF i NECESSARY. SAVE SNOWMELT AND STONE WALL AS REQUIRED TREADS FOR REUSE ON NEW STAIR FOR NEW DECK AND BRIDGE , / I I I O I I I I DEMOLISH THE WALL AS REQUIRED TO PREPARE FOR THE ATTACHMENT OF THE NEW DECK JOISTS. I E - - - - - - – – – � – � Project Information • I V W Z 0 W N- Z CO < p COCI- X X Oo W Q < 1 w0 2J u) 0 LEVEL 9 - DEMOLITION FLOOR PLAN — Q Z w 3/4" = 1'-0" 1 U) Q J O (l) Sheet Information Sheet Title: LEVEL 9 - DEMOLITION PLAN PERMIT SET 01APR2014 Sheet Number: D 2 • 02O E, N DPA Project: 06232.00.310 COPYRIGHT 2011-DAVIS PARTNERSHIP,P.C.