HomeMy WebLinkAboutDRB140156_4289 Nugget Lane-Design Development_1405458420.pdfA3
4EAST ELEVATION
--
DEMO WALLS, DOOR AND SIDING.
SAVE FOR FUTURE SHED WALLS
REMOVE AND REPLANT SMALL
TREE PER OWNERS DIRECTION
MULCH/NATIVE AREA
NOTE: ADD ALTERNATE TO
REMOVE TREE AND PREP FOR
HOT TUB. HOT TUB BASE TO
BE SUNKEN PIT WITH CENTER
DRAIN
MORTAR SET
FLAGSTONE OVER
CONCRETE TO REMAIN
DEMO BOILER FLUE EXHAUST
COVER AND SAVE FOR
FUTURE USE
A3
4EAST ELEVATION
POUR CONCRETE @ NEW SHED EXTENSION
ADD ALTERNATE TO SET FLAGSTONE TO MATCH
11' - 0"
4' - 9" 6' - 3"
STUB OUT FOR FUTURE HOT
TUB ELECTRICAL
ELECTRICAL CONDUIT FOR
FUTURE HOT TUB
ELECTRICAL CONDUIT AT WALL THEN TO
NEW TRENCH FOR FUTURE HOT TUB
NOTE: ADD ALTERNATE TO INSULATE WATER
PIPES IN SHED FOR FREEZE PROTECTION
NEW W6 STEEL BEAM ABOVE TO
SUPPORT NEW DECK EXTENSION
PACK HOLE @ WALL @ BOILER
FLUE WITH NON SHRINK
GROUT
REPLANT SMALL TREE PER
OWNERS DIRECTION
MULCH/NATIVE AREA
NOTE: ADD ALTERNATE TO
REMOVE TREE AND PREP FOR
HOT TUB. HOT TUB BASE TO
BE SUNKEN PIT WITH CENTER
DRAIN. 6" CONCRETE WALL
WITH 6" OF STONE.
ELECTRICAL PANEL FOR FUTURE HOT
TUB
MORTAR SET
FLAGSTONE OVER
CONCRETE
HOT TUB
EXISTING LAMP TO REMAIN
INTERIOR OF HOUSE
GAS FOR FIRE PIT
FUTURE GAS PIT
A3
6
HOT TUB ELEVATIONA3
4EAST ELEVATION
OTHER HALF OF DUPLEX
EXISTING DECK
--
EXISTING RAILING TO BE
REMOVED AND REUSED WITH
NEW RAILING
REUSED RAILING PORTION
ADD 90 DEGREE TURN AND
REUSED EXISTING RAILING
PORTION IF POSSIBLE
3' - 0"
NEW 3'-0" DECK EXTENSION
3' - 0"
BOILER EXHAUST @ ROOF OF
SHED
SHINGLED ROOF
PARTITION WALL TO REMAIN AS-IS
NEW HOT TUB LOCATION @
LEVEL BELOW
-
-HOT TUB ELEVATION1
-
---
RIP TOP OF FRAMING OVER SHED TO 1/8" PER
FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER
1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL
SLEEPERS OVER W.P MEMBRANE FOR DECKING.
NEW DECKING PER OWNERS
DIRECTION
NEW STRUCTURAL FRAMING
SCABBED TO EXISTING 2X
FRAMING FOR 3'-0" EXTENSION
7
A3
EXISTING/DEMO
LOWER LEVEL
FLOORPLAN
7411' - 1 1/2"
MAIN LEVEL DEMO
& NEW
FLOORPLAN
7419' - 0"
7' - 0 1/2"
6' - 4"
6' - 0"
ROOF TO MATCH PITCH OF DIVISING WALL
RAILING TO BE REUTILIZED
W6 STEEL BEAM TO SUPPORT DECK EXTENSION
SCISSOR 2X10 RAFTER ONTO EXISTING DECK RAFTER
WITH TIMBERLOCK SCREWS MIN. OF 6" O.C
NOTCH 2X10 RAFTER 1" TO MAINTAIN 6'-8" CLR. HEAD HEIGHT
BOILER FLUE EXHAUST OUT ROOF OF SHED
FUTURE FIRE PIT
RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT.
ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD
OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P
MEMBRANE FOR DECKING
A3
7
EXISTING/DEMO
LOWER LEVEL
FLOORPLAN
7411' - 1 1/2"
HOT TUB ACCESS PANEL
FOUNDATION WALL FOR HOT TUB PIT
FOUNDATION FOOTING FOR HOT TUB PIT
CONC. PIT SLAB SLOPED TO CENTER DRAIN
STONE PER OWNERS DIRECTION
STONE CAP PER OWNERS DIRECTION
HOT TUB
0' - 0 1/2"
2X DECKING PER OWNER
2X SLEEPER RIPPED TO LEVEL DECK
W.P MEMBRANE OVER 1/2" PLYWOOD OVER RIPPED DECK FRAMING
1X4 FASCIA BOARD ATTACHED TO SLEEPER FRAMING
FLASHING DRIP EDGE
2X RIM JOIST RIPPED TO FIT
DOUBLE 2X10 BEAM
ASPHALT SHINGLE OVER W.P MEMBRANE OVER
1/2" PLYWOOD OVER 2X 8 ROOF FRAMING
JOIST HANGER
1X4 OVER 1X10 FASCIA BOARD
1X10 FASCIA BOARD ATTACHED TO DECK FRAMING
SHED INTERIOR
METAL RAILING TO MATCH EXISTING
<4"
VERIFY SLOPE IN FIELD
SCALE
PROJECT NUMBER
DATE
DRAWN BY
CHECKED BY
As indicated
A3
MAIN LEVEL
FLOORPLANS &
DETAILS
13.07.01
4289 NUGGET LN EAST VAIL, CO 81658
DESIGN DEVELOPMENT
05.14.2014
HDB
HDB
No. Description Date
1/4" = 1'-0"
1
EXISTING/DEMO LOWER LEVEL
FLOORPLAN
1/4" = 1'-0"
2
NEW LOWER LEVEL FLOORPLAN
1/4" = 1'-0"
3
MAIN LEVEL DEMO & NEW FLOORPLAN
1/2" = 1'-0"
4
EAST ELEVATION
12" = 1'-0"
5
3D View 8_16
1/2" = 1'-0" 6
HOT TUB ELEVATION
1 1/2" = 1'-0"
7
DECK TO ROOF DETAIL
DRB
APPROVED
7/15/2014 12:00:00 AM