Loading...
HomeMy WebLinkAboutDRB140156_4289 Nugget Lane-Design Development_1405458420.pdfA3 4EAST ELEVATION -- DEMO WALLS, DOOR AND SIDING. SAVE FOR FUTURE SHED WALLS REMOVE AND REPLANT SMALL TREE PER OWNERS DIRECTION MULCH/NATIVE AREA NOTE: ADD ALTERNATE TO REMOVE TREE AND PREP FOR HOT TUB. HOT TUB BASE TO BE SUNKEN PIT WITH CENTER DRAIN MORTAR SET FLAGSTONE OVER CONCRETE TO REMAIN DEMO BOILER FLUE EXHAUST COVER AND SAVE FOR FUTURE USE A3 4EAST ELEVATION POUR CONCRETE @ NEW SHED EXTENSION ADD ALTERNATE TO SET FLAGSTONE TO MATCH 11' - 0" 4' - 9" 6' - 3" STUB OUT FOR FUTURE HOT TUB ELECTRICAL ELECTRICAL CONDUIT FOR FUTURE HOT TUB ELECTRICAL CONDUIT AT WALL THEN TO NEW TRENCH FOR FUTURE HOT TUB NOTE: ADD ALTERNATE TO INSULATE WATER PIPES IN SHED FOR FREEZE PROTECTION NEW W6 STEEL BEAM ABOVE TO SUPPORT NEW DECK EXTENSION PACK HOLE @ WALL @ BOILER FLUE WITH NON SHRINK GROUT REPLANT SMALL TREE PER OWNERS DIRECTION MULCH/NATIVE AREA NOTE: ADD ALTERNATE TO REMOVE TREE AND PREP FOR HOT TUB. HOT TUB BASE TO BE SUNKEN PIT WITH CENTER DRAIN. 6" CONCRETE WALL WITH 6" OF STONE. ELECTRICAL PANEL FOR FUTURE HOT TUB MORTAR SET FLAGSTONE OVER CONCRETE HOT TUB EXISTING LAMP TO REMAIN INTERIOR OF HOUSE GAS FOR FIRE PIT FUTURE GAS PIT A3 6 HOT TUB ELEVATIONA3 4EAST ELEVATION OTHER HALF OF DUPLEX EXISTING DECK -- EXISTING RAILING TO BE REMOVED AND REUSED WITH NEW RAILING REUSED RAILING PORTION ADD 90 DEGREE TURN AND REUSED EXISTING RAILING PORTION IF POSSIBLE 3' - 0" NEW 3'-0" DECK EXTENSION 3' - 0" BOILER EXHAUST @ ROOF OF SHED SHINGLED ROOF PARTITION WALL TO REMAIN AS-IS NEW HOT TUB LOCATION @ LEVEL BELOW - -HOT TUB ELEVATION1 - --- RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P MEMBRANE FOR DECKING. NEW DECKING PER OWNERS DIRECTION NEW STRUCTURAL FRAMING SCABBED TO EXISTING 2X FRAMING FOR 3'-0" EXTENSION 7 A3 EXISTING/DEMO LOWER LEVEL FLOORPLAN 7411' - 1 1/2" MAIN LEVEL DEMO & NEW FLOORPLAN 7419' - 0" 7' - 0 1/2" 6' - 4" 6' - 0" ROOF TO MATCH PITCH OF DIVISING WALL RAILING TO BE REUTILIZED W6 STEEL BEAM TO SUPPORT DECK EXTENSION SCISSOR 2X10 RAFTER ONTO EXISTING DECK RAFTER WITH TIMBERLOCK SCREWS MIN. OF 6" O.C NOTCH 2X10 RAFTER 1" TO MAINTAIN 6'-8" CLR. HEAD HEIGHT BOILER FLUE EXHAUST OUT ROOF OF SHED FUTURE FIRE PIT RIP TOP OF FRAMING OVER SHED TO 1/8" PER FOOT. ALLOW ROOM FOR W.P MEMBRANE OVER 1/2" PLYWOOD OVER FRAMING. INSTALL LEVEL SLEEPERS OVER W.P MEMBRANE FOR DECKING A3 7 EXISTING/DEMO LOWER LEVEL FLOORPLAN 7411' - 1 1/2" HOT TUB ACCESS PANEL FOUNDATION WALL FOR HOT TUB PIT FOUNDATION FOOTING FOR HOT TUB PIT CONC. PIT SLAB SLOPED TO CENTER DRAIN STONE PER OWNERS DIRECTION STONE CAP PER OWNERS DIRECTION HOT TUB 0' - 0 1/2" 2X DECKING PER OWNER 2X SLEEPER RIPPED TO LEVEL DECK W.P MEMBRANE OVER 1/2" PLYWOOD OVER RIPPED DECK FRAMING 1X4 FASCIA BOARD ATTACHED TO SLEEPER FRAMING FLASHING DRIP EDGE 2X RIM JOIST RIPPED TO FIT DOUBLE 2X10 BEAM ASPHALT SHINGLE OVER W.P MEMBRANE OVER 1/2" PLYWOOD OVER 2X 8 ROOF FRAMING JOIST HANGER 1X4 OVER 1X10 FASCIA BOARD 1X10 FASCIA BOARD ATTACHED TO DECK FRAMING SHED INTERIOR METAL RAILING TO MATCH EXISTING <4" VERIFY SLOPE IN FIELD SCALE PROJECT NUMBER DATE DRAWN BY CHECKED BY As indicated A3 MAIN LEVEL FLOORPLANS & DETAILS 13.07.01 4289 NUGGET LN EAST VAIL, CO 81658 DESIGN DEVELOPMENT 05.14.2014 HDB HDB No. Description Date 1/4" = 1'-0" 1 EXISTING/DEMO LOWER LEVEL FLOORPLAN 1/4" = 1'-0" 2 NEW LOWER LEVEL FLOORPLAN 1/4" = 1'-0" 3 MAIN LEVEL DEMO & NEW FLOORPLAN 1/2" = 1'-0" 4 EAST ELEVATION 12" = 1'-0" 5 3D View 8_16 1/2" = 1'-0" 6 HOT TUB ELEVATION 1 1/2" = 1'-0" 7 DECK TO ROOF DETAIL DRB APPROVED 7/15/2014 12:00:00 AM