Loading...
HomeMy WebLinkAboutDRB140202_A6.22 EM Lot 2_1402336380.pdf • REFER TO ROOF PLAN PAINTED METAL FLASHING WITH DRIP EDGE 1"STANDING SEAM METAL ROOF - PAINTED FLAT FINISH 2"CLOSED CELL SPRAY FOAM GRID 1"STANDING SEAM METAL ROOF iiiiiiii� . GRID INSULATION AT UNDER SIDE OF - PAINTED FLAT FINISH , 2" . ROOF DECKING �\ METAL ROOF APPROPRIATE a METAL ROOF APPROPRIATE PLYWOOD ROOF DECKING. WATERPROOF MEMBRANE ' _ ' I 1 2'x 2"TUBE STEEL TOP RAIL WATERPROOF MEMBRANE RE:STRUCTURE 2"CLOSED CELL SPRAY FOAM ; FINISH WELDED TO STEEL INSULATION AT UNDER SIDE OF , -- 1111\1111" ROOF DECKING • /""' VERTICAL SUPPORT POSTS. 1 / MITER CORNERS-PAINTED PAINTED METAL EAVE �! FINISH FLASHING WITH DRIP EDGE \\ N \\ �\ PLYWOOD ROOF DECKING. %�/ N RE:STRUCTURE a i ZV® 12 -�; a' RE: ROOF PLAN � �� � '� � I U (2) 2' X 2"TUBE STEEL VERTICAL SUPPORT POSTS FINISH 2X WOOD FASCIA \ � WELDED TO TOP RAIL AND SEMI TRANSPARENT STAIN \ L� ® BOTTOM ANCHOR PLATES- PAINTED FINISH If21IIP , , ---0.. CLOSED CELL SPRAY FOAM , INSULATION CONTINUED ' M �I 2'x 2'STEEL BAR RAILS DOWN AT EXTERIOR Wi t- ; FINISH WELDED TO STEEL WALL LINE-TYP. ' �� t3 • VERTICAL SUPPORT POSTS. 2 I 0 BLOCKING //1/ � N w A MITER CORNERS-PAINTED 1 � 5� ~ °V r- CZ IA FINISH RIM BOARD \ CLOSED CELL SPRAY FOAM INSULATION ,404/ � �Yp _ 4 4 . Yi'IN(?. 0 u l' F, o • ® , \ WALL L NE CONTINUED TYPOWN AT EXTERIOR ' w „ -All CC >- %AOC /��l �. 2X WOODFASCIA � SEMI-TRANSPARENT TAIN STEEL BAR RAILS 2x6 EXTERIOR FRAME n I AT SIDE PANELS BEYOND WALL WITH INSULATION © .::, SEE RCPS FOR CEILING • M FINISH AND LOCATIONS %2' EXTERIOR SHEATHING T /��� EAVE FRAMING-SEE BLOWN-IN CELLULOSE �� STRUCTURAL FOR DETAILS BUILDING PAPER 1 ill / INSULATION i SEE ELEVATIONS ,,� EXPOSED lx6 WOOD T&G SIDING ® FOR DETAILS ON , :.'� s „ ROOF FRAMING 2 2NI EXTERIOR WALL FINISH4110 VAPOR UM RE:STRUCTURAL WITH SQUARE REVEAL O i SEMI TRANSPARENT STAIN AND LOCATIONS SEAL AT EDGE AND 2 e 5 PENETRATIONS , 1 A6.22 %$'GYPSUM BOARD OVER VAPOR RETARDER i\ •, I- -- SEE RCPS FOR CEILING 2x6 EXTERIOR FRAME IM SEAL AT EDGE AND �\ F.Ilb FINISH AND LOCATIONS ;i WALL WITH INSULATION ® PENETRATIONS 1 r:..• 0 1 %"GYPSUM BOARD OVER - VAPOR RETARDER- y SEAL AT EDGE AND ` %2' EXTERIOR SHEATHING PENETRATIONS 1• ' BUILDING PAPER A6.22 SCALE. 3" = 1 -0" 3 DETAIL a@ TYPICAL RAKING EAVE .::I ELEVATIONS FOR DETAILS ON A6.22 SCALE: 3" = 1'-0" EXTERIOR WALL FINISH Z (I n AND LOCATIONS C (7 ii%/)i/`' 3/8"STEEL BASE PLATE • FINISH WELDED TO STEEL - 0 II VERTICAL SUPPORT POSTS AND ( m a Ant / LAG BOLTED TO HEAVY TIMBER • REFER TO ROOF PLAN 4 0 BELOW- PAINTED FINISH BLOCKING H J 2x6 DRIP THROUGH DECKING 12 3 ‘110 o 2 x 2 STEEL BAR RAILS � RE: ROOF PLAN O 0 EXPOSED HEAVY TIMBER FINISH WELDED TO STEEL SEE ROOF PLAN FOR SNOW FENCE J I PERIMETER DECK BEAMS- VERTICAL SUPPORT POSTS. PLYWOOD ROOF DECKING. DETAILS AND LOCATIONS W ; STAIN FINISH MITER CORNERS PAINTED RE:STRUCTURE FINISH RE: STRUCTURAL oft,. O STANDING SEAM METAL ROOF PAINTED he 1...'�®° A (2) 2'X 2"VERTICAL 2"CLOSED CELL SPRAY FOAM \ OPEN DECK JOISTS 2x6 DRIP THROUGH SUPPORT POSTS FINISH INSULATION AT UNDER SIDE ftftl* ' \\ FLAT FINISH W -/ RE: STRUCTURAL ill OF ROOF DECKING 'WELDED TO TOP RAIL AND - ° METAL ROOF APPROPRIATE /7/1 Ir721 DECKING ° BOTTOM ANCHOR PLATES- PAINTED WATERPROOF MEMBRANE PAINTED FINISH I / I __,I 2 4,„,,././„. � i3/8"STEEL COLUMN TOP PLATE STEEL BASE PLATE / ` FINISH WELDED TO STEEL FINISH WELDED TO STEEL BLOWN-IN CELLULOSE \ VERTICAL SUPPORT POSTS AND INSULATION I COLUMN AND LAG BOLTED PAINTED METAL III TO HEAVY TIMBER - PAINTED FINISH. RE: STRUCTURE II LAG BOLTED TO HEAVY TIMBER d\l_ BELOW PAINTED FINISH ROOF FRAMING �`�� FLASHING RE:STRUCTURAL BLOCKING WITH DRIP EDGE 5" . . CLOSED CELL SPRAY FOAM INSULATIONILI I CONTINUED DOWN AT EXTERIOR 4 DETAIL a@ DECK GUARDRAIL 5 DETAIL a@ DECK GUARDRAIL WALL LINE-TYP. 8 A6.22 SCALE: 3" = 1'-0" A6.22 SCALE. 3" = 1'-0" / PAINTED METAL GUTTER REFER TO ROOF PLAN A EXPOSED HEAVY TIMBER 2 n n PERIMETER DECK BEAMS- ` TAIN FINISH ISSUED FOR: DATE: RE: STRUCTURAL FINISHSEE RCPS FOR CEILING ... AND LOCATIONS 2 % ����i SCHEMATIC DESIGN 4.16.14 I I 4 5/2, 6 �-��� TOV DRB FINAL REVIEW 6.9.14 m��� 3/8"STEEL COLUMN TOP PLATE CONCRETE FOUNDATION PIER 2 _ ��� ■.■ ■.■ ���� EAVE FRAMING-SEE ' � ' FINISH WELDED TO STEEL IMM1RE: STRUCTURE ���� / STRUCTURAL FOR DETAILS COLUMN AND LAG BOLTED ���� TO HEAVY TIMBER PAINTED FINISH. RE: STRUCTURE • % 5/„TYP �� 3/8”STEEL COLUMN BOTTOM PLATE ��� FINISH WELDED TO STEEL COLUMN 2x6 EXTERIOR FRAME ail- O O AND LAG BOLTED TO CONCRETE WALL WITH INSULATION "TYP, - PAINTED FINISH . ::• 4011 I I - EXPOSED STEEL WIDE FLANGE COLUMN RE: STRUCTURE �' %2' EXTERIOR SHEATHING Q FINISH WELDED TO STEEL TOP A6.22 AND BOTTOM PLATES PAINTED FINISH 0 EXPOSED STEEL WIDE FLANGE COLUMN 5/"GYPSUM BOARD OVER - 2X WOOD FASCIA �\ FINISH WELDED TO STEEL TOP VAPOR RETARDER- -SEMI-TRANSPARENT STAIN 2014 MICHAEL SUMAN ARCHITECT,LLC. NMI ® ® 3/g'STEEL COLUMN BOTTOM PLATE AND BOTTOM PLATES - PAINTED FINISH SEAL AT EDGE AND © ALL RIGHTS RESERVEDIII . FINISH WELDED TO STEEL COLUMN PENETRATIONS SCALE: 3"=V-0" AND LAG BOLTED TO CONCRETE 110h , BUILDING PAPER EXPOSED 1x6 WOOD T&G SIDING I I Q - PAINTED FINISH TOP OF ANCHOR BOLTS % WITH 2'SQUARE REVEAL DRAWN: I I I I RE: STRUCTURE - PAINT TO MATCH COLUMN L., SEE ELEVATIONS SEMI TRANSPARENT STAIN H H NOTE: ALL STEEL TO --1 FOR DETAILS ON Q CONCRETE FOUNDATION PIER STEEL PLATE CONNECTIONSV�/ EXTERIOR WALL FINISH PROJECT#: 1401 Q RE: STRUCTURE TO BE FINISH WELDED AND LOCATIONS SHEET TITLE: EXTERIOR DETAILS 6 DETAIL a@ TEEL COLUMN 7 DETAIL a@ STEEL COLUMN 2 DETAIL @ TYPICAL SHED EAVE A6.22 SCALE: 3" = 1'-0" A6.22 SCALE: 3" = 1'-0" A6.22 SCALE. 3" = 1'-0"