Loading...
HomeMy WebLinkAboutDRB140378_2014-05-12-Eagle River Water and Sanitation-Tug-1418 Vail Valley Drive East_1409237160.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan,floor plan,and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: 1418 Vail Valley Dr, East Lot 19 Block 3 Subdivision: Vail Valley 1st Pri- ry Contact/ ner Representative: Beth Levine Architect, Inc. Phone: 476-4300 Plans Dated: 05-09-2014 Primary •nta• Owner Representative Signature Authorized Signature Comments 21112 CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClemon kelly.mcclernonacenturvl ink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact Remington Baker remi noton.c.bakeraxcelenergv.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact Jeff Vroom ivroomt holvcross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire pamela.mcouireetmcelenerov.corn EAGLE RIVER WATER&SANITATION DISTRICT 0 n 970.477.5449(tel) 970.845.7218(fax) ✓ x . I d) I Contact Tug Birk VV tbirk(a.erwsd.orq COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Michael iohnson(dtcable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact Dan Roussin Daniel.roussin( dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date.