Loading...
HomeMy WebLinkAboutDRB140378_2014-06-05-Kelly-CenturyLink-1418 Vail Valley Drive_1409237160.pdfUTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: 1418 Vail Valley Dr, East Lot~ Block_3_ Subdivision: Vail Valley 1st Beth Levine Architect Inc 476 4300 ' Phone: -P~~~~ ~epresentative: Plans Dated: 05-09-2014 Pf imary ~Owner Representative Signature Authorized Signature Comments ~ CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McCiernon kelll£.mcclernon@centu[l£1ink.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker remington. c. baker(Q)xcelenergl£. com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom jvroom@holycross.com XCEL Energy 970.262.4039 (tel) 970.262.4038 (fax) Contacts: Pam McGuire Qamela.mcguire@xcelenergy.com EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk tbirk@erwsd.org COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson Michael johnson@cable.comcast.com COOT (Only in COOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel. roussin@dot. state. co. us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. Kelly McClernon It is the responsibility of the customer to locate and move all drops in conflict with the project. 5/16/14