HomeMy WebLinkAboutDRB140378_2014-06-05-Kelly-CenturyLink-1418 Vail Valley Drive_1409237160.pdfUTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: 1418 Vail Valley Dr, East Lot~ Block_3_ Subdivision: Vail Valley 1st
Beth Levine Architect Inc 476 4300 ' Phone: -P~~~~ ~epresentative:
Plans Dated: 05-09-2014
Pf imary ~Owner Representative Signature
Authorized Signature Comments ~
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McCiernon
kelll£.mcclernon@centu[l£1ink.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
remington. c. baker(Q)xcelenergl£. com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4039 (tel)
970.262.4038 (fax)
Contacts: Pam McGuire
Qamela.mcguire@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael johnson@cable.comcast.com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel. roussin@dot. state. co. us
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Kelly McClernon It is the responsibility of the
customer to locate and move all
drops in conflict with the project.
5/16/14