Loading...
HomeMy WebLinkAboutDRB140482_DRB140482_1413222540.pdf Department of Community Development 75 South Frontage Road (°) TOWN OF VAII Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator Application for Design Review Minor Exterior Alteration General Information: This application is required for all proposals involving minor changes to buildings and site improve- ments, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information —Town Code Online. All projects requiring de- sign review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building per- mit is issued and construction commences. Fee: $250—Multi-Family/Commercial $20—Single Family/Duplex Single Family I Duplex I— Multi-Family IT-z Commercial Description of the Request: doCU.v►l efrij- Physical Address: (Q,2I 1 fvor-li Proe Qab IJ)., jai' �I L0.S- Parcel Number: 0-10,111\v{ ,SO 1� `1 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: UUuAct,,,,;SI,., Oa;\ ` LLC Mailing Address: as R k1, roh e U1. 00,.,;\ SILDSq Phone: Owner's Signature: C/0 i1 ;,�,,Co,,,,\ _�,L�,,� o ; Primary Contact/ Owner Representative: b(Lec�1�A�o�e; _t 2C- Mailing Address: �0 Rox. OP) en \ (fl O LI la Phone: 9q0 - 8g7-010 ( E-Mail: Lbple\@-1-Lo-r-oolco•Co rv, Fax: °Y-0- - 01010 For Office Use Only: Cash CC: Visa/MC Last 4 CC # Exp. Date: Auth # Check# Fee Paid: Received From: Meeting Date: DRB No.: Planner: Project No: Zoning: Land Use: Location of the Proposal: Lot: Block: Subdivision: Nov 2013 Vail Holiday Inn DRB- Minor Exterior Repair Description of request: Flat Roof: Re-roof the flat roof area. Same for same. Remove existing flat roof system. Build a knee wall. Install new insulation and 60 mil TPO, fully adhered. Install walkway pads from the stairs to the RTU units. Shingle Roof: Remove metal roofing in the center roof area from the flat roof to the ridge. Install Grace Ice and Water Shield and Owens Corning Tru Def Shingles in this area. Gutters/ Downspouts/ Heat Cable/ Hot Spot Remove and reinstall gutters, downspouts, and heat cable. Install Hot Spot roof edge ice melt system at metal panel areas.