HomeMy WebLinkAboutDRB140527_CenturyLink_1415310240.pdf UTILITY APPROVAL &VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. fie. �✓��� ��
)® �. ��f l-
Subject Property Address: /�� � Lot f� Block Subdivision:
Prim Contact 1 Owner Re•resentative: 14 " Phone: Ili" 4-74"
Plans Dated: 1I4°11
Pr' ary Contact/Ow•er Repres .ntative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McClernon
kellv.mcclernon(a�centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact: Remington Baker
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroomaholvcross.com
XCEL Energy
970.262.4039 (tel)
970.262.4038 (fax)
Contacts: Pam McGuire
pamela.mcquire(c�xcelenergv.com -
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact:Tug Birk
tbirkAerwsd.orq
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael iohnson(a7cable.comcast.com
COOT(Only in COOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussinAdot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970,479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.