HomeMy WebLinkAboutDRB140551_A6-3_1423001760.pdfT.O. PLYWOOD
RE: FLOOR PLANS
SEE 1/A6.1 FOR TYP. STONE VENEER
WALL ASSEMBLY INFORMATION
FILL JOIST CAVITY W/
BLOWN-IN INSULATION
RE: SPEC
ICE AND WATER SHIELD LAPS OVER
CONC. FOUNDATION STONE LEDGE
AND DOWN 6" MIN. AND CONTINUE
REMAINDER OF 36" ROLL UP WALL.
2"
RE: STRUCT.
RE: STRUCT. RE: STRUCT.
FINISHED FLOOR RE: PLANS AND SPEC OVER
GYPCRETE W/ IN-FLOOR RADIANT HEAT
RE: PLANS AND SPEC. TOTAL ASSEMBLY FOR
FINISH & GYPCRETE IS 2 1/4"
MIRADRAIN WHICH LAPS OVER
WATER &AIR INFILTRATION BARRIER
LAPS OVER ICE AND WATER SHIELD
FLASHING.
SEE DETAIL 1/A6.1 FOR TYP.
FOUNDATION NOTES
STL. ANGLE RE: STRUCT. COAT
W/ ASPHALTIC DAMP PROOFING
TYP.
1 1/2" 2# CLOSED CELL SPARY
FOAM INSULATION BETWEEN 2X
FURRING
2X P.T. FURRING HELD 1/2" OFF OF
CONC. FOUNDATION WALL
MIRADRAIN CONTINUOUS @ STL
ANGLE LEDGE TO ALLOW STONE
VENEER TO DRAIN
PRESSURE TREATED PLATE
SLOPE
INTERIOR
EXTERIOR
GRID
LINE
SLOPE GRADE @ 5%
MIN. AWAY FROM
BUILDING PER SOILS
ENGINEER
SEE 1/A6.1 FOR TYP. STONE VENEER
WALL ASSEMBLY INFORMATION VARIES RE: STRUCT.T.O. CONC. LEDGE
RE: STRUCT
FLASHING EXTENDS UP BEHIND AIR
INFILTRATION BARRIER MIN. 4", AND
EXTENDS OUT OVER STONE MIN. 3"
APPROX. 2" THICK STONE CAP WITH TOP
SLOPED MIN 10%. EXTENDS BEYOND FACE
OF STONE APPROX. 1"
7 3/4"
T.O. PLYWOOD
RE: FLOOR PLANS
5/8" TYPE X GYP SHEATH ADHERED
DIRECTLY TO CONC. FOUNDATION
WALL.
FILL JOIST CAVITY W/
BLOWN-IN INSULATION
RE: SPEC
2"
RE: STRUCT.
RE: STRUCT. RE: STRUCT.
SEE DETAIL 1/A6.1 FOR TYP.
FOUNDATION NOTES
1 1/2" 2# CLOSED CELL SPARY
FOAM INSULATION BETWEEN 2X
FURRING
2X P.T. FURRING HELD 1/2" OFF OF
CONC. FOUNDATION WALL
MIRADRAIN CONTINUOUS @ STL
ANGLE LEDGE TO ALLOW STONE
VENEER TO DRAIN
PRESSURE TREATED PLATE
SLOPE
INTERIOR EXTERIOR
GRID
LINE
SLOPE GRADE @ 5%
MIN. AWAY FROM
BUILDING PER SOILS
ENGINEER
SEE 1/A6.1 FOR TYP. STONE VENEER
WALL ASSEMBLY INFORMATION
VARIES RE: STRUCT.T.O. CONC. LEDGE
RE: STRUCT
FLASHING EXTENDS UP BEHIND AIR
INFILTRATION BARRIER MIN. 4", AND
EXTENDS OUT OVER STONE MIN. 3"
APPROX. 2" THICK STONE CAP WITH TOP
SLOPED MIN 10%. EXTENDS BEYOND FACE
OF STONE APPROX. 1"
7 3/4"
GARAGE
4" CONC. SLAB WP MEMBRANE OVER 3/4
PLYWOOD OVER 2X SLEEPERS SLOPED TO
CENTER DRAINS
RE: STRUCT AND FLOOR PLANS
W.P. EPOXY LIQUID GRANITE
FLOORING OVER CONC. SLAB AND
TURNS UP WALL MIN 6" RE: SPEC
SLOPE
EXTERIOR
SLOPE GRADE @ 5% MIN.
AWAY FROM BUILDING PER
SOILS ENGINEER
SMART MEMBRANE VAPOR BARRIER RE: SPEC
5/8" GYP SHEATHING OR MOISTURE RESISTANT
DRYWALL TYP. @ GARAGE
OUTSWING DOOR RE: DOOR SCHEDULE.
POUR SLAB AFTER ELECTRIC
CONDUIT IS INSTALLED
ELECTRIC CLOSET
1/2" EXPANSION JOINT
T.O. CONC. WALL
RE: STRUCT.
4" NOM. CONC. SLAB SLOPED TOWARDS CENTER
DRAINS INSTALLED OVER MIRADRAIN DRAINAGE
MEDIUM OVER W.P. MEMBRANE OVER 3/4"
PLYWOOD OVER 2X SLEEPERS RIPPED TO SLOPE
PER PLAN. W.P. MEMBRANE CONTINUOUS UP WALL
12"
RE: FLOOR PLANS AND SPEC
GARAGE
W.P. EPOXY LIQUID GRANITE
FLOORING OVER CONC. SLAB AND
TURNS UP WALL MIN 6" RE: SPEC
INTERIOR
3/4" PLY. RE: STRUCT.
P.T. RIM JOIST
GRID
LINE
RE: PLANS
GRID
LINE
6X10 RAFTER TAIL ATTACHED
TO WOOD RAFTERS @ 48" O.C.
RE: STRUCTURAL DRAWINGS
DRIP FLASHING OVER
FASCIA RE: SPEC
STANDING SEAM METAL
ROOFING RE: SPEC
5/8" PLYWOOD SHEATHING
INSULATION RE: SPEC
6X10 WOOD RAFTER LAG
BOLTED TO EXTERIOR WALL -
LAG BOLTS TO BE COUNTER
SUNK AND PLUGGED
PLYWOOD BLOCKING
EXTEND ROOF SHEATHING
TO EDGE OF ROOF
TYP. EXTERIOR WALL
ASSEMBLY RE: ELEVATIONS /
SECTIONS
CANTILEVERED 2X6 T&G
DECKING
VARIES PER OVERHANG
RE: ROOF PLAN
CONTINUOUS 2X8
STEEL INTERIOR BEAM
RE: STRUCT.
STEEL EXTERIOR BEAM
NOTCHED AND WELDED TO T.O.
INTERIOR STEEL BEAM
RE: STRUCT.
1 1/2"
BEVELED PLATE ON T.O.
INTERIOR STEEL BEAM
RE: STRUCT.
RE: SECTIONS
3"
EQ EQ
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date
11/24/2014 12:08:24 PM
1 1/2" = 1'-0"
1226 WEST HAVEN CIRCLE
GLEN LYON SUB, LOT 38, BLK 0418
VAIL, CO
A6.3
DETAILS
11-24-14
BKW
HB
11-24-14
TOV FINAL DRB
REVISION SCHEDULE
# DESCRIPTION DATE
1 1/2" = 1'-0"
1
FOUNDATION DETAIL @ GRADE ABOVE
FLOOR
1 1/2" = 1'-0"
2
FOUNDATION DETAIL @ GRADE ABOVE
FLOOR @ UNIT 1 GARAGE
1 1/2" = 1'-0"
3
FOUNDATION DETAIL @ UNIT 1
ELCTRICAL CLOSET
1 1/2" = 1'-0"
4
ROOF RAKE/ RIDGE DETAIL @ STEEL
OUTLOOK
DRB
APPROVED
2/3/2015 12:00:00 AM