Loading...
HomeMy WebLinkAboutDRB140551_A6-3_1423001760.pdfT.O. PLYWOOD RE: FLOOR PLANS SEE 1/A6.1 FOR TYP. STONE VENEER WALL ASSEMBLY INFORMATION FILL JOIST CAVITY W/ BLOWN-IN INSULATION RE: SPEC ICE AND WATER SHIELD LAPS OVER CONC. FOUNDATION STONE LEDGE AND DOWN 6" MIN. AND CONTINUE REMAINDER OF 36" ROLL UP WALL. 2" RE: STRUCT. RE: STRUCT. RE: STRUCT. FINISHED FLOOR RE: PLANS AND SPEC OVER GYPCRETE W/ IN-FLOOR RADIANT HEAT RE: PLANS AND SPEC. TOTAL ASSEMBLY FOR FINISH & GYPCRETE IS 2 1/4" MIRADRAIN WHICH LAPS OVER WATER &AIR INFILTRATION BARRIER LAPS OVER ICE AND WATER SHIELD FLASHING. SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES STL. ANGLE RE: STRUCT. COAT W/ ASPHALTIC DAMP PROOFING TYP. 1 1/2" 2# CLOSED CELL SPARY FOAM INSULATION BETWEEN 2X FURRING 2X P.T. FURRING HELD 1/2" OFF OF CONC. FOUNDATION WALL MIRADRAIN CONTINUOUS @ STL ANGLE LEDGE TO ALLOW STONE VENEER TO DRAIN PRESSURE TREATED PLATE SLOPE INTERIOR EXTERIOR GRID LINE SLOPE GRADE @ 5% MIN. AWAY FROM BUILDING PER SOILS ENGINEER SEE 1/A6.1 FOR TYP. STONE VENEER WALL ASSEMBLY INFORMATION VARIES RE: STRUCT.T.O. CONC. LEDGE RE: STRUCT FLASHING EXTENDS UP BEHIND AIR INFILTRATION BARRIER MIN. 4", AND EXTENDS OUT OVER STONE MIN. 3" APPROX. 2" THICK STONE CAP WITH TOP SLOPED MIN 10%. EXTENDS BEYOND FACE OF STONE APPROX. 1" 7 3/4" T.O. PLYWOOD RE: FLOOR PLANS 5/8" TYPE X GYP SHEATH ADHERED DIRECTLY TO CONC. FOUNDATION WALL. FILL JOIST CAVITY W/ BLOWN-IN INSULATION RE: SPEC 2" RE: STRUCT. RE: STRUCT. RE: STRUCT. SEE DETAIL 1/A6.1 FOR TYP. FOUNDATION NOTES 1 1/2" 2# CLOSED CELL SPARY FOAM INSULATION BETWEEN 2X FURRING 2X P.T. FURRING HELD 1/2" OFF OF CONC. FOUNDATION WALL MIRADRAIN CONTINUOUS @ STL ANGLE LEDGE TO ALLOW STONE VENEER TO DRAIN PRESSURE TREATED PLATE SLOPE INTERIOR EXTERIOR GRID LINE SLOPE GRADE @ 5% MIN. AWAY FROM BUILDING PER SOILS ENGINEER SEE 1/A6.1 FOR TYP. STONE VENEER WALL ASSEMBLY INFORMATION VARIES RE: STRUCT.T.O. CONC. LEDGE RE: STRUCT FLASHING EXTENDS UP BEHIND AIR INFILTRATION BARRIER MIN. 4", AND EXTENDS OUT OVER STONE MIN. 3" APPROX. 2" THICK STONE CAP WITH TOP SLOPED MIN 10%. EXTENDS BEYOND FACE OF STONE APPROX. 1" 7 3/4" GARAGE 4" CONC. SLAB WP MEMBRANE OVER 3/4 PLYWOOD OVER 2X SLEEPERS SLOPED TO CENTER DRAINS RE: STRUCT AND FLOOR PLANS W.P. EPOXY LIQUID GRANITE FLOORING OVER CONC. SLAB AND TURNS UP WALL MIN 6" RE: SPEC SLOPE EXTERIOR SLOPE GRADE @ 5% MIN. AWAY FROM BUILDING PER SOILS ENGINEER SMART MEMBRANE VAPOR BARRIER RE: SPEC 5/8" GYP SHEATHING OR MOISTURE RESISTANT DRYWALL TYP. @ GARAGE OUTSWING DOOR RE: DOOR SCHEDULE. POUR SLAB AFTER ELECTRIC CONDUIT IS INSTALLED ELECTRIC CLOSET 1/2" EXPANSION JOINT T.O. CONC. WALL RE: STRUCT. 4" NOM. CONC. SLAB SLOPED TOWARDS CENTER DRAINS INSTALLED OVER MIRADRAIN DRAINAGE MEDIUM OVER W.P. MEMBRANE OVER 3/4" PLYWOOD OVER 2X SLEEPERS RIPPED TO SLOPE PER PLAN. W.P. MEMBRANE CONTINUOUS UP WALL 12" RE: FLOOR PLANS AND SPEC GARAGE W.P. EPOXY LIQUID GRANITE FLOORING OVER CONC. SLAB AND TURNS UP WALL MIN 6" RE: SPEC INTERIOR 3/4" PLY. RE: STRUCT. P.T. RIM JOIST GRID LINE RE: PLANS GRID LINE 6X10 RAFTER TAIL ATTACHED TO WOOD RAFTERS @ 48" O.C. RE: STRUCTURAL DRAWINGS DRIP FLASHING OVER FASCIA RE: SPEC STANDING SEAM METAL ROOFING RE: SPEC 5/8" PLYWOOD SHEATHING INSULATION RE: SPEC 6X10 WOOD RAFTER LAG BOLTED TO EXTERIOR WALL - LAG BOLTS TO BE COUNTER SUNK AND PLUGGED PLYWOOD BLOCKING EXTEND ROOF SHEATHING TO EDGE OF ROOF TYP. EXTERIOR WALL ASSEMBLY RE: ELEVATIONS / SECTIONS CANTILEVERED 2X6 T&G DECKING VARIES PER OVERHANG RE: ROOF PLAN CONTINUOUS 2X8 STEEL INTERIOR BEAM RE: STRUCT. STEEL EXTERIOR BEAM NOTCHED AND WELDED TO T.O. INTERIOR STEEL BEAM RE: STRUCT. 1 1/2" BEVELED PLATE ON T.O. INTERIOR STEEL BEAM RE: STRUCT. RE: SECTIONS 3" EQ EQ US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Scale Date Drawn by Checked by Issue Date 11/24/2014 12:08:24 PM 1 1/2" = 1'-0" 1226 WEST HAVEN CIRCLE GLEN LYON SUB, LOT 38, BLK 0418 VAIL, CO A6.3 DETAILS 11-24-14 BKW HB 11-24-14 TOV FINAL DRB REVISION SCHEDULE # DESCRIPTION DATE 1 1/2" = 1'-0" 1 FOUNDATION DETAIL @ GRADE ABOVE FLOOR 1 1/2" = 1'-0" 2 FOUNDATION DETAIL @ GRADE ABOVE FLOOR @ UNIT 1 GARAGE 1 1/2" = 1'-0" 3 FOUNDATION DETAIL @ UNIT 1 ELCTRICAL CLOSET 1 1/2" = 1'-0" 4 ROOF RAKE/ RIDGE DETAIL @ STEEL OUTLOOK DRB APPROVED 2/3/2015 12:00:00 AM