Loading...
HomeMy WebLinkAboutDRB140563_A4-3_1424821200.pdf2ND UNIT MAIN LEVEL FLOOR PLAN FINISHED FLOOR 8162' - 0" 2ND UNIT UPPER LEVEL FLOOR PLAN FINISHED FLOOR 8174' - 0" 2ND UNIT LOWER LEVEL FINISHED FLOOR 8150' - 0" PRIMARY UNIT LOWER LEVEL FINISHED FLOOR 8147' - 6" PRIMARY UNIT MAIN LEVEL FINISHED FLOOR 8159' - 6" PRIMARY UNIT UPPER LEVEL FINISHED FLOOR 8171' - 6" AA BB CC 3 A5.7 1 A5.8 QQ 203 MMM 204 W 100 EEEE 100 IIII 100 Y 100 M 204 LLL 204 OBLIQUE ELEVATION SEE SHEET A4.2 TRUE ELEVATION OBLIQUE ELEVATION SEE SHEET A4.4 8168' - 3" 8164' - 3" 8161' - 3" LINE OF 33' ABOVE EXISTING GRADE @ EAVE LINE OF EXISTING GRADE @ EAVE ABOVE T.O. ROOF EAVE @ 8186' - 3" 22 2ND UNIT MAIN LEVEL FLOOR PLAN FINISHED FLOOR 8162' - 0" 2ND UNIT UPPER LEVEL FLOOR PLAN FINISHED FLOOR 8174' - 0" 2ND UNIT LOWER LEVEL FINISHED FLOOR 8150' - 0" PRIMARY UNIT LOWER LEVEL FINISHED FLOOR 8147' - 6" PRIMARY UNIT MAIN LEVEL FINISHED FLOOR 8159' - 6" PRIMARY UNIT UPPER LEVEL FINISHED FLOOR 8171' - 6" 1A 2A 1 A5.5 3 A5.5 AA 101 DD 103 A 000 A 000 TRUE ELEVATION OBLIQUE ELEVATION SEE SHEET A4.1 M 205 H 206 LLL 205 DDDD 101 CCCC 101 3/4" Q M M M MONOPOINTS MOUNTED TO DECK ABOVE 1' - 6" A.F.F. A6.7 9 GENERAL NOTES: 1) EXTERIOR LIGHTING IS NOTED AS: Q-WAC LIGHTING WL-LED100 EXT. STEPLIGHT BRONZE FINISH MOUNTED 18" OR LESS ABOVE FINISHED GRADE- (32) TOTAL FIXTURES B- HUBBARTON FORGE AIRIS SMALL-SEEDED GLASS LENS- 307910-07-ZL222 SURFACE MOUNT DOWN LIGHT - (3) TOTAL FIXTURES M- HEVI LITE INC HL-384-BZ SURFACE MOUNT MONO POINT BRONZE POWDER COAT FINISH. PERMANENTLY FIXED/INSTALLED AS A DOWNLIGHT- (17) TOTAL FIXTURES A4- LIGHTOLIER- CALCULITE EVOLUTION- C4AICLVM- 4" LOW VOLTAGE ADJUSTABLE CAN- (4) TOTAL FIXTURES 2) SEE EXTERIOR MATERIAL AND COLOR INFORMATION SHEET FOR MORE INFORMATION ON COLORS. SEE OUTLINE SPEC AND ARCHITECTURAL FINISH SCHEDULE. 3) ALL SNOW FENCES AT STANDING SEAM ROOF TO BE AN ENGINEERED SYSTEM PER ROOF TYPE AND SLOPE INSTALLED PER MANUFACTURES RECOMMENDATIONS RE: SPEC. 4) ALL DIMENSIONS / ELEVATIONS ARE FROM T.O. FINISH U.N.O. 5) WINDOW AND DOOR HEAD / SILL HEIGHTS ARE FROM T.O. FINISH. 6) SEE SHEET A4.1 FOR TYP. MATERIAL CALLOUTS 7) ALL EXTERIOR EXPOSED STEEL HEADERS, BEAM, KNIFE PLATES, ETC, TO BE PAINTED TO MATCH BLUE/BLACK STEEL SAMPLE. MATERIALS 1. STANDING SEAM METAL ROOF- DARK BRONZE RE: SPEC 2. 6X10 WOOD RAFTERS. RE: STRUCT- COLOR: PORTER STAINS 709 BLACK WALNUT 3. 2X6 FASCIA.- COLOR: PORTER STAINS 709 BLACK WALNUT 4. COPPER PANEL SIDING W/ DARK SEALED PATINA RE: SPEC 5. DRY STACKED STONE VENEER RE: SPEC & FINISH SCHEDULE 6. VERTICAL RECLAIMED WOOD SIDING RE: SPEC & FINISH SCHEDULE 7. HORIZONTAL RECLAIMED WOOD SIDING RE: SPEC & FINISH SCHEDULE 8. 3X3 WOOD TRIM- COLOR: PORTER STAINS 709 BLACK WALNUT 9. DIMENSIONAL WOOD TRIM- COLOR: PORTER STAINS 709 BLACK WALNUT 50% FORMULA 10. STEEL C-CHANNEL WINDOW HEADER. RE: STRUCT 11. COLORADO BUFF STONE HEADER 12. COLORADO BUFF STONE CAP W/ 10 PERCENT MIN. SLOPE AT TOP TO SHED WATER 13. STEEL BEAM. RE: STRUCT 14. 8X8 WOOD STRUT W/ KNIFE PLATE CONNECTIONS @ WALL AND STEEL BEAM- COLOR: PORTER STAINS 709 BLACK WALNUT 15. 8X8 WOOD COLUMN W/ STEEL CAP AND 4X4 HSS COLUMN CONNECTIONS @ TOP AND BOTTOM- COLOR: PORTER STAINS 709 BLACK WALNUT 16. TYPICAL STEEL HANDRAIL PAINTED CUSTOM BLUE/BLACK COLOR 17. 5" ROUND PFSM GUTTER AND 3" DOWNSPOUT. PIPE UNDERGROUND TO DAYLIGHT OUTSIDE OF AREA OF EXCAVATION FOR FOUNDATION AND PROVIDE POWER FOR HEAT TAPE. 18. STEEL COLUMN 19. 4X4 TUBE STEEL COLUMNS @ CHIMNEY CAP PAINTED TO MATCH WINDOW CLADDING 20. 3" THICK STONE CHIMNEY CAP 21. SNOW FENCE TYP. SEE ROOF PLAN FOR LOCATIONS. 22. FROSTED GLASS PANEL GARAGE DOOR WITH METAL FRAME TO MATCH WINDOW CLADDING Scale Drawn by Checked by US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Issue Date REVISION 1/4" = 1'-0" 1/27/2015 10:34:54 AM A4.3 ELEVATIONS AG HB GORE CREEK RESIDENCES 01/20/15 223 BEAVER DAM RD, VAIL, CO 81657 VAIL VILLAGE FILING 1, BLOCK 7, LOT 39 REVISED FINAL DRB SET No. Revision Date Revision Description 1/4" = 1'-0" 1 SOUTH WEST ELEVATION 1/4" = 1'-0" 2 NORTH WEST ELEVATION ADDED FURRING TO SHOW 2 5/8" DIFFERENCE BETWEEN FACE OF WOOD AND FACE OF COPPER DRB APPROVED 2/18/2015 12:00:00 AM