Loading...
HomeMy WebLinkAboutDRB150009_DRB150009_1421187780.pdf Department of Community Development 75 South Frontage Road TOWN OF VAIL A Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator Application for Design Review Minor Exterior Alteration General Information: This application is required for all proposals involving minor changes to buildings and site improve- ments, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information —Town Code Online. All projects requiring de- sign review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building per- mit is issued and construction commences. Fee: $250—Multi-Family/Commercial $20—Single Family/Duplex I— Single Family Duplex Multi-Family I— Commercial Description of the Request: 4oc7 ` - `-A c ,pc--1G X?Art o r,w rJ G P o pon • woc4.(c, Physical Address: l2( o wCcS-rVe-pa c S Parcel Number: '2( 12f— d3 - G/0 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: p o-J G t.-/'E`''rtr-"E�L vi-'rl- A Mailing Address: e(S20 i4"„4 . S,,cle (61d eivwcS.s Gt ( / rki Phone: I r ' (3 ' 148 9. 4114F7 Owner's Signature: Primary Contact/Owner Representative: s-STA(A Mailing Address: k7-fl • g-,x 3360 Phone: 1.7o • '326 . 30-0 E-Mail: s . morn Fax: 1'10 • '326 • 39.° For Office Use Only: Cash_ CC: Visa/MC Last 4 CC#_ Exp. Date: Auth# Check# Fee Paid: Received From: Meeting Date: DRB No.: Planner: Project No: Zoning: Land Use: Location of the Proposal: Lot: Block: Subdivision: Nov 2013 Property Information Property Address 2 0 es-nc--t i'-' i t3 Parcel# 2/6 .5 /a. q ® 6'2) - of o Legal Description Development Site Area sq ft acres buildable sq ft Zone District/SDD# Hazard Zones Snow Avalanche _;High Severity I—Moderate Severity fl N/A Sections 12-21 &14-7 Debris Flow jHig h Flow Moderate Flow High Avalanche N/A � g Rock fall rilligh Severity Medium Severity n N/A Excessive Slopes n N/A Floodplain 17100 year floodplain =Floodway I Wetlands [ N/A Creeks,Streams LIGore Creek r on site f adjacent to site N/A Section 12-14-17 Other tributary: non site n adjacent to site N/A Project Information Project Description 4-v o s-jx...412_ ' -t `E P'-yo ccf @ p,4c-V_ p o Development Standards Allowed Existing Proposed Gross Residential Floor Area Primary sq ft (maximum) Secondary sq ft Chapter 12-15 EHU sq ft TOTAL sq ft 250 Addition Interior Conversion Credits: Setbacks(minimum) Front ft Section 14-10-4 Side ft Side ft Rear ft Watercourse ft Site Coverage(maximum) see definition Section 12-2-2 P 212 F.F . Building Height(maximum) Sloping ft see definition Section 12-2-2 Flat ft Landscaping Softscape sq ft See definition Section 14-2-1 Section 14-10-8 Hardscape sq ft tAPO 212 TOTAL sq ft Driveway Max Curb-cuts Sections 14-3-1 & 14-3-2 Max Grade @ cen- terline Min Width Heated drive'? `;Yes i No IT Yes No Snow Storage% Parking #Enclosed Spaces Sections 12-10& 14-5 #Unenclosed TOTAL Outdoor Lighting(maximum) #fixtures Section 14-10-7 PROPOSED MATERIALS Building Materials Type of Material Color Roof Siding Other Wall Materials Fascia 5 ylt Ys iYac Woo scfa-oC/ Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting 41.wckt- L— 9 1)%..,ta1.4 Gy4S b,(t,iswc P N!J/¢ Other Notes: Please specify the manufacturer's name,the color name and number and attach a color chip. PROPOSED LANDSCAPING Botanical Name Common Name Quantity Size PROPOSED TREES AND SHRUBS EXISTING TREES S / IV" TO BE REMOVED CIA yvc.e, �- y Minimum Requirements for Landscaping: Deciduous Trees—2" Caliper Coniferous Trees—6' in height Shrubs—5 Gal. Type Square Footage GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL Please specify other landscape features(i.e. retaining walls, fences, swimming pools, etc.) UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: / 2' ® c.Je sC.`, C Le— Lot 21 Block Subdivision: 6 LET' L i'w J Primary Contact/Owner Representative: Sr re,c_- fi(- Phone: '(T® ' 3 •310-' Plans Dated: 'B • ?A° 1`i Primary Contact/Owner Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Kelly McClernon kelly.mcclernoncenturylink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker remington.c.baker(a�xcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact: Jeff Vroom jvroomholycross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire pamela.mcquire(a�xcelenergy.corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact: Tug Birk tbirk(a�erwsd.org COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact: Michael Johnson Michael johnson(a�cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussindot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.