Loading...
HomeMy WebLinkAboutDRB150019_A202_1425939840.pdfLEVEL 1 0" 1 2 3 4 5 6 LEVEL 2 10' - 2 5/16" T.O. ROOF RIDGE 23' - 2 1/2" T.O. TOWER 62' - 8 1/2" B.O. SOFFIT 8' - 3 3/4" M-9 KN-3 M-12 B.O. BEAMS 7' - 6" M-9 M-9 M-11 M-5 M-5 M-11 M-11 KN-3 KN-3 M-1 M-5 M-3 M-3 M-2 M-2 KN-7 KN-6 KN-6 KN-6 KN-6 M-11 KN-15 KN-15 KN-1 KN-7 KN-7 KN-2 A400 3 A401 1 A401 2 A402 2 A403 1 A403 2 A404 1 5.8 5.5 4.7 A402 1 3.8 2.5 1.5 1.2 M-8 KN-16 KN-16 KN-16 KN-16 KN-14 KN-14 104A 104B 107 A C E E C 101B F 101A C KN-5 LEVEL 1 0" B LEVEL 2 10' - 2 5/16" T.O. ROOF RIDGE 23' - 2 1/2" B.O. SOFFIT 8' - 3 3/4" B.O. BEAMS 7' - 6" KN-7 M-9 KN-2 M-8 M-11 M-2 M-5 A405 1 A404 3 A D A405 3 A403 3 PROJECT NUMBER: PROJECT DATE: SHEET TITLE: SHEET NUMBER: © COPYRIGHT 2014 ANY UNAUTHORIZED USE OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF: SEMPLE BROWN DESIGN, P.C. A202 143100 GORSUCH RESTAURANT ADDITION 2014.11.24 WEST AND NORTH ELEVATION 263 EAST GORE CREEK DRIVE, VAIL, CO 81657 1/4" = 1'-0" 1 WEST ELEVATION PEC NOTE LEGEND TAG DESCRIPTION KN-1 SIGNAGE SHOWN FOR PROXIMITY ACTUAL DESIGN TO BE FUTURE SUBMITTAL KN-2 EXISTING PAINTED WOOD BALCONY RAILING TO BE RE-MADE TO MATCH EXISTING DESIGN KN-3 EXISTING STREET LAMP REPLACE STONE CLADING ON PLINTH KN-4 EXISTING STREET LAMP REPLACE STONE CLADING ON PLINTH KN-5 TOWN OF VAIL TRASH AND RECYCLING KN-6 HEAVY TIMBER RAFTERS sTAINED TO MATCH EXISTING KN-7 STAINED WOOD FASCIA BOARD DETAILING TO MATCH EXISTING KN-8 NEW STONE STAIRS TO MAIN ENTRY KN-9 NEW KNOTTY ALDER WOOD PANEL DOOR WITH DECORATIVE RONDELLE GLASS AND ANTLER PULL, MARINE GRADE DULL FINISH KN-13 EXISTING TREE TO REMAIN KN-14 4" ROUND COPPER DOWN SPOUT TIE INTO STORM SEWER KN-15 INTEGRAL COPPER GUTTER KN-16 2 PIPE SNOW FENCE ON CLAMP TO SEAM AT 12" O.C. POWDER COATED BRONZE [ROCKY MOUNTAIN SNOWGUARDS OR EQUAL] KN-17 RE GRADE AND REPLACE CONCRETE PAVERS TO MATCH EXISTING PER TOWN OF VAIL STANDARDS M-1 WHITE 3 COAT CEMENTITIOUS STUCCO TO MATCH EXISTING ON METAL LATH ON MOISTURE BARRIER ON 5/8" DENSGLASS SHEATING 6" METAL FRAMING M-2 7/8" THICK EBONY SOLID ROUGH SAWN CEDAR STAINED TO MATCH EXISTING M-3 COLD ROOF ASSEMBLY. 20 OZ COPPER STANDING SEAM [12" O.C. SEAMS ROOFING TO MATCH EXISTING] ON ICE AND WATER SHIELD ON 3/4" PLYWOOD ON 2X4 AIR CIRCULATION SPACERS ON 3/4" PLWYOOD ON HEAVY TIMBER FRAMING [TBD] WITH R-49 SPRAY CLOSED CELL CELLULOSE INSULATION M-4 CUSTOM PROFILE PAINTED WOOD WINDOW BIFOLDING DOOR SYSTEM, GREEN PAINT TO MATCH EXISTING, WITH 1" CLEAR INSULATED GLAZING M-5 3" STONE CLADDING ON RETAINING WALL; GALLEGOS STACKED ASPEN GRANITE AND TUMBLED T GOLD M-6 WROUGHT IRON RAILING AT 4" O.C. BY DENCOL WITH 1 1/2"X10" THICK IPE WOOD CAP M-7 1X6 STAINED CEDAR T&G WOOD TO MATCH EXISTING M-8 COPPER GUTTER AND FLASHING TO MATCH EXISTING M-9 WOOD PLANTER BOX PAINTED GREEN TO MATCH EXISTING M-10 INTEGRAL STONE SEAT, STONE WALL WITH STONE CAP M-11 NEW FIXED CUSTOM PROFILE WOOD WINDOW PAINTED GREEN TO MATCH EXISTING, 1" CLEAR INSULATED GLAZGING M-12 REVISION DATE 1 PEC DRB 11.24.14 2 PEC R1 12.09.14 3 FINAL DRB PEC 01.26.15 4 DD PRICING 02.04.15 1/4" = 1'-0" 2 NORTH ELEVATION DRB APPROVED 2/18/2015 12:00:00 AM