HomeMy WebLinkAboutDRB150089_A2.1 BRIAR_1431122640.pdfUP
DN
DN
UP
UP
DN
DN
BONUS ROOM
BATH #4
BEDROOM
#2
BEDROOM
#3
BATH #2 50' - 6"
BEDROOM
#2
BEDROOM
#3
BATH #
2
BATH #
3
CLOSE
T
CLOSET CLOSET
10' - 3 3/8"
NOOK
BATH
UTILITY ROOM
1
A4.3
1
A4.2
1
A4.1
2
A4.3
2
A4.2
2
A4.1
BEDROOM #
2
BEDROOM
#3
BATH #2
BATH #
3
CLOSET
BONUS ROOM
28' - 1" 28' - 1" 28' - 1"
43' - 6"
7' - 0"
11' - 0 1/2" 17' - 0 1/2" 28' - 1" 17' - 0 1/2" 11' - 0 1/2"
18' - 4"
GAS
METERS
(EXIST)
EXISTING
HOT TUB
EXISTING
HOT TUB
NEW STONE
SURROUND
ALL RAILINGS TO BE
REPLACED WITH
NEW
NEW DECK
NEW
LANDING
EXISTING
LANDING
NEW FLAGSTONE WALK
NEW CONC. PAD
NEW GATE
2
A5.1
NEW GAS
FIRE PIT NEW STEPS MATCH EXISTING.
NEW COMPOSITE DECKING
TO MATCH EXISTING
NEW RAILINGS
7' - 0"
EXISTING
EASEMENT LINE
11' - 0"
12' - 0"
NEW METAL PANEL
GUARDRAIL
NEW STONE
SURROUND
NEW STONE
SURROUND
CENTERLINE OF DRAINAGE DITCH
CORNER OF DECK
CANTILEVERED ABOVE
DRAINAGE DITCH
EXISTING
DECK
EXISTING
DECK
30' - 10 3/4"
29' - 4 3/4"
30' - 10 3/4"
UNIT 1
UNIT 2 UNIT 3
LINE OF DECK ABOVE
LINE OF DECK ABOVE
LINE OF HOUSE ABOVE LINE OF HOUSE ABOVE
3
A4.1
2' - 2 13/16"
SUNKEN
HOT TUB
LINE OF BLDG. ENVELOPE
DECKS MAY ENCROACH 5'-0"
HALL
REMOVE EXTERIOR WALL
ADDITION WALL
NEW WINDOWS
TO MATCH
DN.
-10' - 0"
-13' - 0"
NEW BEAM ABOVE
CANTILEVERED
DECK ABOVE
UP
DN.
NEW WALL BELOW
W/ STUCCO FINISH
METAL RAILING
REMOVE DECK
& STEPS
METAL STAIRS
970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631
www.martinmanleyarchitects.com
Project number Date REVISIONS
4/30/2015 10:17:40 PM
A2.1 BASEMENT FLOOR PLAN xxxx
BRIAR PATCH IMPROVEMENTS
DRB SUBMITTAL 5-1-15 BRIAR PATCH UNITS 1390 Briar Patch Ln, Vail, CO UNITS 1, 2, & 3 1/4" = 1'-0"
1
1. BASEMENT
No. Description Date
DRB
APPROVED
5/8/2015 12:00:00 AM