Loading...
HomeMy WebLinkAboutDRB150089_A3.2 BRIAR_1431122640.pdf2. MAIN LEVEL 41' - 0 3/8" 3. ENTRY LEVEL 50' - 2 1/2" Plate Height 58' - 3 1/2" 1. BASEMENT 31' - 10 3/4" 4. LOFT LEVEL 59' - 3 1/4" 1 A4.3 1 A4.2 1 A4.1 2 A4.3 2 A4.2 2 A4.1 2 A5.1 4 A5.1 ROOF ASPHALT SHINGLES TO REMAIN REPLACE FASCIAS WITH NEW WOOD FASCIA TO MATCH AND TO PAINT NEW HORIZONTAL COMPOSITE SIDING W/ PAINT TRIM WINDOWS AND CORNERS WITH COMPOSITE MATERIAL TO MATCH 3-COAT STUCCO SYSTEM W/ INTEGRAL COLOR NEW METAL RAILINGS NEW STONE WRAP AT EXISTING COLUMN DECK WALL TO RECIEVE 3-COAT STUCCO SYSTEM / INTEGRAL COLOR NEW UNDER-DECK WALL W/ STUCCO FINISH FILL W/ DIRT TO BRING GRADES TO WITHIN 30" OF DECK 12' - 1 5/8" NEW SHED ROOF W/ STANDING SEAM METAL NEW SHINGLE ROOF TO MATCH EXISTING 970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number Date REVISIONS 4/30/2015 10:18:20 PM A3.2 EAST ELEVATION xxxx BRIAR PATCH IMPROVEMENTS DRB SUBMITTAL 5-1-15 BRIAR PATCH UNITS 1390 Briar Patch Ln, Vail, CO UNITS 1, 2, & 3 1/4" = 1'-0" 1 EAST (REAR) ELEVATION No. Description Date DRB APPROVED 5/8/2015 12:00:00 AM