HomeMy WebLinkAboutDRB150089_A3.2 BRIAR_1431122640.pdf2. MAIN LEVEL
41' - 0 3/8"
3. ENTRY LEVEL
50' - 2 1/2"
Plate Height
58' - 3 1/2"
1. BASEMENT
31' - 10 3/4"
4. LOFT LEVEL
59' - 3 1/4"
1
A4.3
1
A4.2
1
A4.1
2
A4.3
2
A4.2
2
A4.1
2
A5.1
4
A5.1
ROOF ASPHALT SHINGLES
TO REMAIN
REPLACE FASCIAS WITH NEW
WOOD FASCIA TO MATCH
AND TO PAINT
NEW HORIZONTAL COMPOSITE
SIDING W/ PAINT
TRIM WINDOWS AND CORNERS WITH
COMPOSITE MATERIAL TO MATCH
3-COAT STUCCO SYSTEM
W/ INTEGRAL COLOR
NEW METAL RAILINGS
NEW STONE WRAP AT
EXISTING COLUMN
DECK WALL TO RECIEVE 3-COAT
STUCCO SYSTEM / INTEGRAL COLOR
NEW UNDER-DECK
WALL W/ STUCCO
FINISH
FILL W/ DIRT TO BRING GRADES TO WITHIN 30" OF DECK
12' - 1 5/8"
NEW SHED ROOF W/ STANDING SEAM METAL
NEW SHINGLE ROOF TO MATCH EXISTING
970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631
www.martinmanleyarchitects.com
Project number Date REVISIONS
4/30/2015 10:18:20 PM
A3.2 EAST ELEVATION xxxx
BRIAR PATCH IMPROVEMENTS
DRB SUBMITTAL 5-1-15 BRIAR PATCH UNITS 1390 Briar Patch Ln, Vail, CO
UNITS 1, 2, & 3 1/4" = 1'-0"
1
EAST (REAR) ELEVATION
No. Description Date
DRB
APPROVED
5/8/2015 12:00:00 AM