Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRB150093_14 A105_1434481980.pdf
14 A B C D E POST FOR DAVIT SYSTEM ANCHORED TO ROOF, TYP. RE: STRUCT. MANSARD ROOF STANDING SEAM MTL. ROOF - COLOR TO MATCH EXISTING AT CENTRAL BUILDING MANSARD ROOF STANDING SEAM MTL. ROOF TIE-OFF POST DAVIT SYSTEM POST CANOPY 000 4' 8' 16' SCALE: N This document is the property of Heery International, Inc. and Heery International Inc. retains all rights therein, including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International, Inc. is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, Heery International Inc. Copyright © 2013 by Heery International, Inc. all rights reserved. WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" drawn by checked by sheet number sheet title item date date issued for seal/signature consultants/construction managers owner's project number project number 1/8" = 1'-0" OWNER'S PROJECT NUMBER 4/24/2015 5:55:42 PM A105.DRB Checker Author ROOF PLAN - ZONE A&B DESIGN REVIEW BOARD VAIL VALLEY MEDICAL CENTER DESIGN REVIEW BOARD 181 WEST MEADOW DRIVE VAIL, CO HII-1302604 INTERIOR DESIGN: Gallun Snow 1920 Market Street, Suite 240, Denver, CO 80202 720.407.6002 EXISTING: NO WORK THIS AREA AREA OF CONSTRUCTION NOT FOR CONSTRUCTION 1/8" = 1'-0" 1 ROOF PLAN - ZONE A&B DRB BOTTOM OF MANSARD FROM TOP OF STEEL DECK = 11 1/2" TOP OF ROOF FROM TOP OF STEEL DECK = 10'-4" TOP OF ROOF FROM TOP OF STEEL DECK = 12'-4" TOP OF MANSARD TO TOP OF STEEL DECK = 8'-10" BOTTOM OF MANSARD TO TOP OF STEEL DECK = 11 1/2" TOP OF ROOF FROM TOP OF STEEL DECK = 10'-2" METAL ROOF SCREEN - COLOR TO MATCH MANSARD ROOF TOP OF SCREEN FROM TOP OF STEEL DECK = 12'-8" TOP OF MANSARD FROM TOP OF STEEL DECK = 8'-10" TOP OF ROOF FROM TOP OF STEEL DECK = 12'- 11" TOP OF AHU FROM TOP OF STEEL DECK = 15'-3" TAN STUCCO ROOF SCREEN - COLOR TO MATCH EXISTING CENTRAL BUILDING, TOP OF SCREEN FROM TOP OF STEEL DECK = 12'-1" TOP OF ROOF FROM TOP OF STEEL DECK = 9'-10" CORTEN METAL PANEL SCREEN, TOP OF SCREEN FROM TOP OF STEEL DECK = 9'-9" ROOF DRAIN AND OVERFLOW DRAIN, TYP. TOP OF AHU FROM TOP OF STEEL DECK = 15'-3" TOP OF CHILLER FROM TOP OF STEEL DECK = 8'-10" COMPRESSOR AHU CHILLLER AHU AHU BLACK EDPM ROOF METAL CLADDING SYSTEM - COLOR TO MATCH MANSARD ROOF METAL CLADDING SYSTEM - COLOR TO MATCH MANSARD ROOF EXISTING AHU TOP OF PARAPET TO TOP OF STEEL DECK = 3'-0" METAL CLADDING SYSTEM - COLOR TO MATCH MANSARD ROOF FINAL SUBMITTAL JUNE 1, 2015 WINDOW BROW TEMPORARY ENTRANCE BELOW - STANDING SEAM METAL ROOF - COLLOR TO MATCH EXISTING AT CENTRAL BUILDING RESUBMITTAL JUNE 8, 2015 DRB APPROVED 6/3/2015 12:00:00 AM