Loading...
HomeMy WebLinkAboutDRB150113_2015-04-13-Utility Verification-Binder_1428956220.pdfUTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of VaiL Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2 ~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i .f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,., Primary Contac'l;fer Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McCiernon l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker "''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom lhJro~-lmt"" .corn XCEL Energy 970.262.4032 (tel) 970.262.4038 (fax) Contacts: Britt Mace i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk I ~\:Jirk@erwscL QffJ COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson •,n;, iohn: ·""""· ,;., com COOT (Only in COOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin IDanieLrcussin@dot.state.co.us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. Michael Johnson 4-8-15approved by Comcast 1 Beth Levine From:Roussin - CDOT, Daniel <daniel.roussin@state.co.us> Sent:Wednesday, April 08, 2015 4:13 PM To:Beth Levine Subject:Re: 1755 West Gore Creek-TOV DRB Utility form I have no comments on this. This email should work for you. thanks Dan Roussin Permit Unit Manager Traffic and Safety P 970.683.6284 | F 970.683.6290 222 South 6th Street, Room 100, Grand Junction, CO 81501 daniel.roussin@state.co.us | www.coloradodot.info | www.cotrip.org On Wed, Apr 8, 2015 at 9:47 AM, Beth Levine <beth@bethlevinearchitect.com> wrote: 2015-04-08 Collis Hello Kelly, Remington, Jeff, Britt, Tug, Michael, and Dan, Please find attached the Town of Vail Design Review application for the utilities form. I have attached all of the project drawings dated 2015-03-30 and the utility form. Thank you for E-mailing me back your utility approval. Sincerely, Beth Beth Levine Architect, Inc. 2 UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of VaiL Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2 ~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i .f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,., Primary Contac'l;fer Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McCiernon l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker "''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom lhJro~-lmt"" .corn XCEL Energy 970.262.4032 (tel) 970.262.4038 (fax) Contacts: Britt Mace i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk I ~\:Jirk@erwscL QffJ COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson •,n;, iohn: ·""""· ,;., com COOT (Only in COOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin IDanieLrcussin@dot.state.co.us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of VaiL Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2 ~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i .f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,., Primary Contac'l;fer Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Kelly McCiernon l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker "''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom lhJro~-lmt"" .corn XCEL Energy 970.262.4032 (tel) 970.262.4038 (fax) Contacts: Britt Mace i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk I ~\:Jirk@erwscL QffJ COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson •,n;, iohn: ·""""· ,;., com COOT (Only in COOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin IDanieLrcussin@dot.state.co.us 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. Beth Levine Architect, Inc. P.O. Box 1825 Avon, CO 81620 Phone: 970-926-4993 Fax: 970-926-2993 beth@bethlevinearchitect.com 2015-04-13 Utility Verification and Approval Missing: Remington Baker, Xcel Energy, High Pressure Britt Mace, Xcel Energy I have contacted Remington and Britt three times; I will continue to follow-up and get the information as soon as I receive it into the planner. Please see below. Sincerely, Beth Beth Levine Architect, Inc. 2015-04-13 Collis Hello Remington and Brittany, I am sorry to be a pest about 1755 West Gore Creek Road’s utility approval; I have all of the other approvals, so, you’re are the last ones. Please E-mail or call (970-926-4993) if there are any questions you would like me to address. Thank you, Beth Beth Levine Architect, Inc. From: Beth Levine [mailto:beth@bethlevinearchitect.com] Sent: Friday, April 10, 2015 10:41 AM To: 'kelly.mcclernon@centurylink.com'; remington.c.baker@xcelenergy.com; brittany.mace@xcelenergy.com Subject: FW: 1755 West Gore Creek-TOV DRB Utility form (2) Importance: High 2015-04-10 Collis Hello Kelly, Remington, and Brittany, I was hoping I could touch base with you regarding the utility approval for 1755 W. Gore Creek, Vail, as I’ve heard from everyone else. Thank you very much for looking at this utility verification. Sincerely, Beth Beth Levine Architect, Inc. From: Beth Levine [mailto:beth@bethlevinearchitect.com] Sent: Wednesday, April 08, 2015 9:47 AM To: 'kelly.mcclernon@centurylink.com'; remington.c.baker@xcelenergy.com; jvroom@holycross.com; brittany.mace@xcelenergy.com; 'tbirk@erwsd.org'; Michael_johnson@cable.comcast.com; 'daniel.roussin@dot.state.co.us' Subject: 1755 West Gore Creek-TOV DRB Utility form 2015-04-08 Collis Hello Kelly, Remington, Jeff, Britt, Tug, Michael, and Dan, Please find attached the Town of Vail Design Review application for the utilities form. I have attached all of the project drawings dated 2015-03-30 and the utility form. Thank you for E-mailing me back your utility approval. Sincerely, Beth Beth Levine Architect, Inc.