HomeMy WebLinkAboutDRB150113_2015-04-13-Utility Verification-Binder_1428956220.pdfUTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of VaiL
Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2
~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i
.f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,.,
Primary Contac'l;fer Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McCiernon
l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
"''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
lhJro~-lmt"" .corn
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
I ~\:Jirk@erwscL QffJ
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
•,n;, iohn: ·""""· ,;., com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
IDanieLrcussin@dot.state.co.us
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Michael Johnson 4-8-15approved by Comcast
1
Beth Levine
From:Roussin - CDOT, Daniel <daniel.roussin@state.co.us>
Sent:Wednesday, April 08, 2015 4:13 PM
To:Beth Levine
Subject:Re: 1755 West Gore Creek-TOV DRB Utility form
I have no comments on this. This email should work for you.
thanks
Dan Roussin
Permit Unit Manager
Traffic and Safety
P 970.683.6284 | F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniel.roussin@state.co.us | www.coloradodot.info | www.cotrip.org
On Wed, Apr 8, 2015 at 9:47 AM, Beth Levine <beth@bethlevinearchitect.com> wrote:
2015-04-08
Collis
Hello Kelly, Remington, Jeff, Britt, Tug, Michael, and Dan,
Please find attached the Town of Vail Design Review application for the utilities form. I have attached all of
the project drawings dated 2015-03-30 and the utility form.
Thank you for E-mailing me back your utility approval.
Sincerely,
Beth
Beth Levine Architect, Inc.
2
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of VaiL
Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2
~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i
.f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,.,
Primary Contac'l;fer Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McCiernon
l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
"''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
lhJro~-lmt"" .corn
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
I ~\:Jirk@erwscL QffJ
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
•,n;, iohn: ·""""· ,;., com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
IDanieLrcussin@dot.state.co.us
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of VaiL
Subject Property Address: 115 S W · Y~ G(:; ''l',;.t,f, k:.. Lot 1tP Block __ Subdivision: V V W • ~ 2
~tn Lev··V\ , "' ~ ·~-~ I "'1"""fPi .t.:fJ'~,ofi,.<t ~ Primary r;~ I O~er Representative: . -/ · ' .i i . \L j:l;"'i~.-'V! . ''•{;,,, Phone: ,;.,, t-· ·· / :i
.f' 1/: /'l' /;.,"t/'-Plans Dated: t.L'I6' (..) ~, ~i) ~ .;r.J,.,
Primary Contac'l;fer Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288 (tel)
970.328.8282 (fax)
Contacts: Kelly McCiernon
l:~e!l·t.;·ncc!ernonlfLlcs;Tturvi!nl;:.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
"''''"'~ .J> .c.bak~;;,,'"" 1!'<:]\!.COnl
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
lhJro~-lmt"" .corn
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
i"oriil:aiW.iT'"" ·""' > JcFQ\f.GOni
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
I ~\:Jirk@erwscL QffJ
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
•,n;, iohn: ·""""· ,;., com
COOT (Only in COOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
IDanieLrcussin@dot.state.co.us
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Beth Levine Architect, Inc.
P.O. Box 1825
Avon, CO 81620
Phone: 970-926-4993
Fax: 970-926-2993
beth@bethlevinearchitect.com
2015-04-13
Utility Verification and Approval
Missing: Remington Baker, Xcel Energy, High Pressure
Britt Mace, Xcel Energy
I have contacted Remington and Britt three times; I will continue to follow-up and get the
information as soon as I receive it into the planner. Please see below.
Sincerely,
Beth
Beth Levine Architect, Inc.
2015-04-13
Collis
Hello Remington and Brittany,
I am sorry to be a pest about 1755 West Gore Creek Road’s utility approval; I have all of
the other approvals, so, you’re are the last ones.
Please E-mail or call (970-926-4993) if there are any questions you would like me to
address.
Thank you,
Beth
Beth Levine Architect, Inc.
From: Beth Levine [mailto:beth@bethlevinearchitect.com]
Sent: Friday, April 10, 2015 10:41 AM
To: 'kelly.mcclernon@centurylink.com'; remington.c.baker@xcelenergy.com;
brittany.mace@xcelenergy.com
Subject: FW: 1755 West Gore Creek-TOV DRB Utility form (2)
Importance: High
2015-04-10
Collis
Hello Kelly, Remington, and Brittany,
I was hoping I could touch base with you regarding the utility approval for 1755 W. Gore
Creek, Vail, as I’ve heard from everyone else.
Thank you very much for looking at this utility verification.
Sincerely,
Beth
Beth Levine Architect, Inc.
From: Beth Levine [mailto:beth@bethlevinearchitect.com]
Sent: Wednesday, April 08, 2015 9:47 AM
To: 'kelly.mcclernon@centurylink.com'; remington.c.baker@xcelenergy.com;
jvroom@holycross.com; brittany.mace@xcelenergy.com; 'tbirk@erwsd.org';
Michael_johnson@cable.comcast.com; 'daniel.roussin@dot.state.co.us'
Subject: 1755 West Gore Creek-TOV DRB Utility form
2015-04-08
Collis
Hello Kelly, Remington, Jeff, Britt, Tug, Michael, and Dan,
Please find attached the Town of Vail Design Review application for the utilities form. I
have attached all of the project drawings dated 2015-03-30 and the utility form.
Thank you for E-mailing me back your utility approval.
Sincerely,
Beth
Beth Levine Architect, Inc.