Loading...
HomeMy WebLinkAboutDRB150272_A1.1_1436218920.pdfRevised March 2015 Bathroom Upgrade Original Drwg Feb 27,1996 Montaneros Condos Unit 414 1 bedroom + loft 2 bathrooms WINDOWS Maxine &Chick Gleicher Vail414 Main 3-2015.skf cg MAINLEVEL STAIRWAY ReplaceExisting EntryDoor With New Add 2 Sconces 60" 72" 506" 144" 130" 212" New Cans in Bathroom Remove Partician Wall &Door New Fan Replace Existing Can Lights with New Add Can Lights Existing Kitchen to Remain Bath NewFinishes Replace ExistingTile Finish at Tub. Maintain Fire Rating at Party Wall Replace Existing Electric Base Board Heat Throughout Replace Existing Electrical Devives Throughout FIREPLACE SHOWER MASTER BEDROOM KITCHEN BATHROOM ENTRANCE Location of proposed window replacement DRB APPROVED 7/6/2015 12:00:00 AM