HomeMy WebLinkAboutDRB150274_A000_1438021680.pdfARCHITECT
K.H. WEBB ARCHITECTS P.C.
710 W. LIONSHEAD CIR. UNIT A
VAIL, CO 81657
PH. 970.477.2990
FX, 970.477.2965
studio@khwebb.com
CONTACTS:
KYLE H. WEBB / HEATHER BARRIE
LODGE AT LIONSHEAD
KH WEBB REPAIR DRB SUBMITTAL 07.06.15
PROJECT TEAM:
GENERAL NOTES:
1. DO NOT SCALE DRAWINGS.
2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY
WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR
DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY.
3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN
APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR
AREAS.
4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR
FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE
TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS
OTHERWISE NOTED.
5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE
BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET
ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS.
6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR
TYPES.
7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR
WINDOW TYPES.
8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR
AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS.
9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR
FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE
ARCHITECT. RESPONSE TIME SHALL BE ON A CASE BY CASE BASIS AND SHALL NOT CONSTITUTE
A DELAY IN THE PROJECT.
10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES
AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE
UNIFORM BUILDING CODE 1997 EDITION. COMPLIANCE IS MANDATORY. THE CONSTRUCTION
DOCUMENTS SHALL NOT PERMIT WORK THAT DOES NOT CONFORM TO ALL RELEVANT CODES
INCLUDING IN UBC AND ALL LOCAL AND REGIONAL CODES.
11. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND
OBTAIN APPROVALS FROM THE ARCHITECT/ENGINEER BEFORE ANY CUTTING, NOTCHING, OR
DRILLING OF ANY CAST-IN-PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER
STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE
CONSTRUCTION.
12. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE
BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE
WORK.
13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK
SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL
PROBLEMS WITH THESE SURFACES.
14. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN
APPROVAL.
15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR
AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES,
EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE
INDUSTRY.
16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND/OR OUTSIDE
SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING
UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION
IMPACTS TO THE SITE.
18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE
ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL
AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED
LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND
WITH THE NON-DISTURBED LANDSCAPE.
19. THE SOILS REPORT IS AVAILABLE FROM OWNER'S SOILS ENGINEER.
20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE
CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR
LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT.
21. CONTRACTOR TO COMPLY WITH SPECIAL INSPECTIONS- IBC-1704.1.1 BUILDING PERMIT
REQUIREMENT.
22. THE POOL AND SPA DRAWINGS SHALL BE INCLUDED AS A DEFERED PERMIT SET
LANDSCAPE ARCHITECT
COLORADO LAND ART STUDIO, INC.
PO BOX 2257
EAGLE, CO 81631
PH. 970.376.2977
CONTACTS:
CRISTIAN BASSO
A000 COVER SHEET
A001 PHASE I&II FLOOR AREA
L-0.0 TOPOGRAPHIC SURVEY 1"=20'-0"
L-1 EXISTING CONDITIONS 1
16"=1'-0"
L-2 SITE PLAN 1"=20'-0"
L-3 LANDSCAPE PLAN 1"=20'-0"
L-4 WINTER SPA ENLARGED PLANS 1
4"=1'-0"
L-5 SUMMER POOL & SPA ENLARGED PLANS 1
4"=1'-0"
L-6 SECTIONS 1
4"=1'-0"
L-7 SNOWMELT PLAN
L-8 PLANTING DETAILS NTS
L-9 DETAILS
L-10 DETAILS/ ELEVATION
AE1.0 SITE LIGHTING PLAN 1"=10'-0"
C-1 GRADING- DRAINAGE PLAN
C-2 GRADING- DRAINAGE PLAN NORTH
C-3 GRADING- DRAINAGE PLAN SOUTH
C-4 GRADING- DRAINAGE PLAN DETAILS
D1.0 DEMO PLAN/ PHASE I LEVEL 1
3
16"=1'-0"
D1.1 DEMO PLAN/ PHASE I LEVEL 2
3
16"=1'-0"
D1.2 DEMO PLAN/ PHASE I LEVEL 3
3
16"=1'-0"
D1.3 DEMO PLAN/ PHASE I LEVEL 4
3
16"=1'-0"
D1.4 DEMO PLAN/ PHASE I LEVEL 5
3
16"=1'-0"
D1.5 DEMO PLAN/ PHASE II GARAGE
3
16"=1'-0"
D1.6 DEMO PLAN/ PHASE II LEVEL 1
3
16"=1'-0"
D1.7 DEMO PLAN/ PHASE II LEVEL 2
3
16"=1'-0"
D1.8 DEMO PLAN/ PHASE II LEVEL 3
3
16"=1'-0"
D1.9 DEMO PLAN/ PHASE II LEVEL 4
3
16"=1'-0"
A2.1 PHASE I/ LEVEL ONE FLOOR PLAN
3
16=1'-0"
A2.2 PHASE I/ LEVEL TWO FLOOR PLAN
3
16"=1'-0"
A2.3 PHASE I/ LEVEL THREE FLOOR PLAN
3
16=1'-0"
A2.4 PHASE I/ LEVEL FOUR FLOOR PLAN
3
16"=1'-0"
A2.5 PHASE I/ LEVEL FIVE FLOOR PLAN
3
16"=1'-0"
A2.6 PHASE II/ GARAGE FLOOR PLAN
3
16"=1'-0"
A2.7 PHASE II/ LEVEL ONE FLOOR PLAN
3
16"=1'-0"
A2.8 PHASE II/ LEVEL TWO FLOOR PLAN
3
16"=1'-0"
A2.9 PHASE II/ LEVEL THREE FLOOR PLAN
3
16"=1'-0"
A2.10 PHASE II/ LEVEL FOUR FLOOR PLAN
3
16"=1'-0"
A2.11 PHASE I & II ROOF PLAN
3
16"=1'-0"
A2.12A ENLARGED PLAN
1
2"=1'-0"
A2.12B ENLARGED PLAN 1 2
"=1'-0"
A2.12C ENLARGED PLAN 1 2
"=1'-0"
A2.12D ENLARGED PLAN 1 2
"=1'-0"
A2.12E ENLARGED PLAN 1 2
"=1'-0"
A2.13 PHASE I/ LEVEL 1 REF. CLG. PLA
1
2"=1'-0"
A2.14 PHASE I/ LEVEL 2 REF. CLG. PLAN 3/16"=1'-0"
A2.15 PHASE I/ LEVEL 3 REF. CLG. PLAN 3/16"=1'-0"
A2.16 PHASE I/ LEVEL 4 REF. CLG. PLAN 3/16"=1'-0"
A2.17 PHASE I/ LEVEL 5 REF. CLG. PLAN 3
16"=1'-0"
A2.18 PHASE II/ GARGE LEVEL REF. CLG. PLAN 3
16"=1'-0"
A2.19 PHASE II/ LEVEL ONE REF. CLG. PLAN 3
16"=1'-0"
A2.20 PHASE II/ LEVEL TWO REF. CLG. PLAN 3
16"=1'-0"
A2.21 PHASE II/ LEVEL THREE REF. CLG. PLAN 3
16"=1'-0"
A2.22 PHASE II/ LEVEL FOUR REF. CLG. PLAN 3
16"=1'-0"
A3.0A ELEVATION KEYNOTES NTS
A3.0 PHASE I ELEVATIONS 3
16"=1'-0"
A3.1 PHASE I ELEVATIONS 3
16"=1'-0"
A3.2 PHASE I & II ELEVATIONS
3
16"=1'-0"
A3.3 PHASE II ELEVATIONS
3
16"=1'-0"
A3.4 POOL ELEVATIONS 1/4"=1'-0"
A3.5 PHASE I ELEVATIONS 3
16"=1'-0"
A4.0 SECTIONS
1
4"=1'-0"
A4.1 SECTIONS
1
4"=1'-0"
A4.2 UL DETAILS NTS
A4.3 WATERPROOFING DETAILS VARIES
A4.4 WATERPROOFING DETAILS VARIES
A4.4B WATERPROOFING DETAILS VARIES
A4.5 DETAILS VARIES
A4.6 SECTIONS AT PENTHOUSE VARIES
A4.7 WINDOW DETAILS VARIES
A4.8 DOOR DETAILS VARIES
DRAWING INDEX:
INTERNATIONAL BUILDING CODE 2003
PROJECT CODE SUMMARY :
GENERAL CONTRACTOR
EVANS-CHAFFEE CONSTRUCTION
PO BOX 8266
AVON, CO 81620
PH. 970.845.0466
FX. 970.845.0465
CONTACT: COLLEEN BUTLER
MECHANICAL ENGINEER
BIGHORN CONSULTING ENGINEERS, INC.
569 S. WESTGATE DR. STE. 1
GRAND JUNCTION, CO 81505
PH. 970.241.8709
FX. 970.241.9514
CONTACTS: BLAINE BUCK, PE
MECHANICAL CONTRACTOR
COMMERCIAL DESIGN ENGINEERING, LTD
1003 WINTERS AVE.
GRAND JUNCTION, CO 81501
PH.970.245.0595
FX.970.245.1015
CONTACT: STEVE KING
ELECTRICAL CONTRACTOR
EC ELECTRIC1
80 METCALF RD. UNIT C3
AVON, CO 81620
PH. 970.748.0934
FX. 970.748.0935
CONTACT: DUSTIN RIDDLE
FIRE SPRINKLER CONSULTANTS
BFPE
PO BOX 1068
WESTMINISTER, CO
PH. 303.933.1555
CONTACT: PERRY MATTHEWS
WATERPROOFING CONSULTANTS
BUILDING CONSULTANTS & ENGINEERS, INC.
1520 WEST CANAL COURT, STE. 240
LITTLETON, CO 80120
PH. 303.350.1000
CONTACT: LINDA MCGOWAN, PE
SOILS ENGINEER
LKP ENGINEERING, INC.
EDWARDS, CO
PH. 970.926.9088
FX. 970.926.9089
CONTACT: LUIZA PETROVSKA
STRUCTURAL ENGINEER
KRM CONSULTANTS, INC.
PO BOX 4572
VAIL,CO 81658
PH. 970.949.9391
FX. 970.949.1577
CONTACT: MIKE STRUMPH
FA1 PHASE I- FIRE ALARM MISC. NTS
FA2 PHASE I- FIRE ALARM MISC. NTS
FA3 PHASE I- FIRE ALARM MISC. NTS
FA4 PHASE I FIRE ALARM -1ST FLOOR 1 8
"=1'-0"
FA5 PHASE I FIRE ALARM- 2ND FLOOR 1 8
"=1'-0"
FA6 PHASE I FIRE ALARM- 3RD FLOOR 1 8
"=1'-0"
FA7 PHASE I FIRE ALARM- 4TH FLOOR 1 8
"=1'-0
FA8 PHASE I FIRE ALARM- 5TH FLOOR
1
8"=1'-0
FA9 PHASE I FIRE ALARM- LOFT FLOOR
1
8"=1'-0
FP1 PHASE I FIRE SPRINKLER MISC. NTS
FP2 PHASE I FIRE SPRINKLER MISC. NTS
FP3 PHASE I FIRE SPRINKLER 1ST FLOOR 1
8"=1'-0"
FP4 PHASE I FIRE SPRINKLER 2ND FLOOR 1 8
"=1'-0"
FP5 PHASE I FIRE SPRINKLER 3RD FLOOR 1 8
"=1'-0"
FP6 PHASE I FIRE SPRINKLER 4TH FLOOR 1 8
"=1'-0"
FP7 PHASE I FIRE SPRINKLER 5TH FLOOR 1 8
"=1'-0"
FP8 PHASE I FIRE SPRINKLER LOFT FLOOR 1 8
"=1'-0"
FA1 PHASE II FIRE ALARM MISC NTS
FA2 PHASE II- FIRE ALARM MISC. NTS
FA3 PHASE II- FIRE ALARM MISC. NTS
FA4 PHASE II FIRE ALARM -GARAGE "=1'-0"
FA5 PHASE II FIRE ALARM- 1ST FLOOR 1 8
"=1'-0"
FA6 PHASE II FIRE ALARM- 2ND FLOOR 1 8
"=1'-0"
FA7 PHASE II FIRE ALARM- 3RD FLOOR 1 8
"=1'-0
FA8 PHASE II FIRE ALARM- 4TH FLOOR 1 8
"=1'-0
FP1 PHASE II FIRE SPRINKLER MISC. NTS
FP2 PHASE II FIRE SPRINKLER MISC. NTS
FP3 PHASE II FIRE SPRINKLER GARAGE 1 8
"=1'-0"
FP4 PHASE II FIRE SPRINKLER 1ST FLOOR 1 8
"=1'-0"
FP5 PHASE II FIRE SPRINKLER 2ND FLOOR 1 8
"=1'-0"
FP6 PHASE II FIRE SPRINKLER 3RD FLOOR 1 8
"=1'-0"
FP7 PHASE II FIRE SPRINKLER 4TH FLOOR
1
8"=1'-0"
Main Occupancy Classification and Type of Construction - R-2- Type III- B
Automatic sprinkler system
Table 503- Phase I/Four stories plus basement, Phase II/ Four Stories plus basement
8QGHUVTXDUHIHHWRI´DUHDEXLOGLQJµSHUIORRUVHHDWWDFKHGDOORZDEOHIORRUDUHDFDOFXODWLRQV
See A001- For area calculations.
Other Occupancy Classifications shall be classified under Table 302.1.1 Incidental Use areas as follows:
Room: Separation:
Boiler Room Provide automatic fire-extinguishing system/ plus smoke separation.
Parking Garage 1 hour and provide automatic fire-extinguishing system/ plus smoke separation.
Waste and Linen collection Room Provide automatic fire-extinguishing system/ plus smoke separation.
Storage 100 sq ft or over- provide automatic fire-extinguishing system/ plus smoke separation.
Type III B- See table 601 for complete fire-resistance rating
Main Ratings Per Code:
Structural frame- 0 hr (Table 601)
Exterior (Non Bearing) Walls- 1 hr (Table 602)
Interior Non Bearing- 0 hr (Table 601)
Exterior Bearing Walls- 2 hr (Table 601)
Roof Construction- 0 hr (Table 601)
Corridors serving R-2- 0.5 hr
Walls Separating Dwelling Units- 1 hr
Hor. Floor/ Ceiling Assemblies- 0 hr
Shaft Assemblies- 1 & 2 hr (707.4)
Exit Stair Enclosures- 2 hr
Non- Combustible material- Concealed Soffit, Overhang, Decks, Lobby Entry,
Trash Dumpster, and Over Framed Roofs.
A6.0 INTERIOR ELEVATIONS- PHASE I
3
16"=1'-0"
A6.1 INTERIOR ELEVATIONS- PHASE II
3
16"=1'-0"
A6.2 INTERIOR ELEVATIONS- PHASE II
3
16"=1'-0"
A7.0 DOOR & WINDOW SCHEDULE
A7.1 INTERIOR DOOR SCHEDULE
S1 STRUCTURAL- SPECS.
S2 STRUCTURAL- PHASE I STAIR TOWER VARIES
S3 PHASE I ROOF FRAMING/ DUMPSTER FOUND./
PHASE II ROOF FRAMING/LOBBY FOUND.
S4 PHASE II FOUND./LEVEL 1 DECK PLAN
S5 PHASE II LEVEL 2/ LEVEL 3 DECK PLAN
S6 PHASE II ROOF FRAMING
S7 PHASE I FOUND./ MAINT. ROOF FRAMING
S8 PHASE II FOUND./ SKI LOCKER ROOF FRAMING
S9 DETAILS
S10 PENTHOUSE REMODEL SPECS/ DETAILS
S11 PENTHOUSE REMODEL ROOF FRAMING PLAN
S12 DETAILS
M1.0 MECHANICAL SITE PLAN
M1.1 MECHANICAL LEGEND/ SCHEDULES
M1.7 PHASE II GARAGE MECH. PLAN
M1.8 PHASE II LEVEL 1 MECH. PLAN
M1.9 PHASE II LEVEL 2 MECH. PLAN
M1.10 PHASE II LEVEL 3 MECH. PLAN
M1.11 PHASE II LEVEL 4 MECH. PLAN
M1.12 MECH. BOILER SCHEMATIC & BOILER ROOM
E1.0 PHI ELEC. ONE LINE DIAGRAMS PHASE I
E1.1 PHI POWER PLAN & PANEL SCHEDULES
E1.0 PHII ELEC. ONE LINE DIAGRAMS PHASE II
E1.1 PHII SHORT CIRCIT CALCS, DIAGRAM & CALCS
E1.2 ELEC. SCHEDULES AND DETAILS
E1.3 PHASE I LEVEL 1 ELEC. PLAN
E1.4 PHASE I LEVEL 2 ELEC. PLAN
E1.5 PHASE I LEVEL 3 ELEC. PLAN
E1.6 PHASE I LEVEL 4 ELEC. PLAN
E1.7 PHASE I COVERED PARKING ELEC. PLAN
E1.8 PHASE II GARAGE ELEC. PLAN
E1.9 PHASE II LEVEL 1 ELEC. PLAN
E1.10 PHASE II LEVEL 2 ELEC. PLAN
E1.11 PHASE II LEVEL 3 ELEC. PLAN
E1.12 PHASE II LEVEL 4 ELEC. PLAN
E1.13 ELECTRICAL SITE PLAN
E1.14 ELECTRICAL SITE PLAN
E1.15 ELECTRICAL SITE PLAN
P R O J E C T :
710 W. LIONSHEAD CIR. UNIT A VAIL . CO 81657
970.477.2990 970.477.2965(F)
D R A W N B Y :
D A T E :
R E V I S I O N S :
2329/ 2330
Lodge at Lionshead-LoT 7 Block 1, Vail Lionshead Filing 1/ 380 E. Lionshead Cir.
Town of Vail, Eagle County Colorado
Common Elements/Improvements
HB/GM
DRB
APPROVED
7/15/2015
12:00:00 AM