Loading...
HomeMy WebLinkAboutDRB150274_A000_1438021680.pdfARCHITECT K.H. WEBB ARCHITECTS P.C. 710 W. LIONSHEAD CIR. UNIT A VAIL, CO 81657 PH. 970.477.2990 FX, 970.477.2965 studio@khwebb.com CONTACTS: KYLE H. WEBB / HEATHER BARRIE LODGE AT LIONSHEAD KH WEBB REPAIR DRB SUBMITTAL 07.06.15 PROJECT TEAM: GENERAL NOTES: 1. DO NOT SCALE DRAWINGS. 2. VERIFY ALL DIMENSIONS, CONDITIONS, AND UTILITY LOCATIONS PRIOR TO BEGINNING ANY WORK OR ORDERING ANY MATERIALS. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES IN THE DOCUMENTS IMMEDIATELY. 3. AREAS OF CONFLICTS OR DISCREPANCIES MUST BE FULLY RESOLVED WITH WRITTEN APPROVAL FROM THE ARCHITECTS BEFORE CONSTRUCTION CONTINUES IN THESE PARTICULAR AREAS. 4. PLAN DIMENSIONS ARE TO FACE OF STUD, CENTERLINE OF STEEL, TIMBER, STUD COLUMNS, OR FACE OF CONCRETE UNLESS OTHERWISE NOTED. SECTION AND ELEVATION DIMENSIONS ARE TO TOP OF CONCRETE, TOP OF PLYWOOD, OR TOP OF WALL PLATES OR BEAMS UNLESS OTHERWISE NOTED. 5. PROVIDE ALL NECESSARY BLOCKING IN STUD WALLS AND CEILINGS. LOCATIONS INCLUDE BUT ARE NOT LIMITED TO CEILING AND WALL MOUNTED FIXTURES, TOILETS, TOILET ACCESSORIES, CABINETRY, COUNTERTOPS, SHELVES, CLOSET RODS AND FALSE BEAMS. 6. REFER TO FLOOR PLANS FOR DOOR LOCATIONS. REFER TO DOOR SCHEDULE FOR DOOR TYPES. 7. REFER TO FLOOR PLANS FOR WINDOW LOCATIONS. REFER TO WINDOW SCHEDULE FOR WINDOW TYPES. 8. COORDINATE ALL ELECTRICAL AND MECHANICAL FIXTURES TO FIT WITHIN CEILING FLOOR AND WALL SPACES. VERIFY WITH ARCHITECT WHEN DIVERTING FROM DRAWINGS. 9. IN THE EVENT THAT ADDITIONAL DETAILS OR GUIDANCE IS NEEDED BY THE CONTRACTOR FOR CONSTRUCTION OF ANY ASPECT OF THE PROJECT, THEY SHALL IMMEDIATELY NOTIFY THE ARCHITECT. RESPONSE TIME SHALL BE ON A CASE BY CASE BASIS AND SHALL NOT CONSTITUTE A DELAY IN THE PROJECT. 10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL APPLICABLE CODES AND OBTAINING ALL PERMITS AND REQUIRED APPROVALS. THIS PROJECT IS GOVERNED BY THE UNIFORM BUILDING CODE 1997 EDITION. COMPLIANCE IS MANDATORY. THE CONSTRUCTION DOCUMENTS SHALL NOT PERMIT WORK THAT DOES NOT CONFORM TO ALL RELEVANT CODES INCLUDING IN UBC AND ALL LOCAL AND REGIONAL CODES. 11. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FIELD COORDINATE AND OBTAIN APPROVALS FROM THE ARCHITECT/ENGINEER BEFORE ANY CUTTING, NOTCHING, OR DRILLING OF ANY CAST-IN-PLACE CONCRETE, STRUCTURAL FRAMING, OR ANY OTHER STRUCTURAL ELEMENTS WHICH MAY AFFECT THE STRUCTURAL INTEGRITY OF THE CONSTRUCTION. 12. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING GRADES AND SCALE OUT THE BUILDING FOOTPRINT FOR OWNER AND ARCHITECT APPROVAL PRIOR TO BEGINNING ANY SITE WORK. 13. THE OWNER HAS BEEN ADVISED THAT DUE TO HARSH WINTER CONDITIONS, ROOF & DECK SURFACES MUST BE MAINTAINED REASONABLE FREE OF ICE & SNOW TO ENSURE MINIMAL PROBLEMS WITH THESE SURFACES. 14. SUBSTITUTIONS OF "EQUAL" PRODUCTS WILL BE ACCEPTABLE WITH ARCHITECT'S WRITTEN APPROVAL. 15. IT IS THE INTENT AND MEANING OF THESE DOCUMENTS THAT THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR PROVIDE ALL LABOR, MATERIALS TRANSPORTATION, SUPPLIES, EQUIPMENT, ETC. TO OBTAIN A COMPLETE JOB WITHIN THE RECOGNIZED STANDARDS OF THE INDUSTRY. 16. ALL CONSTRUCTION IS TO FIT WITHIN THE BUILDING ENVELOPE AND/OR OUTSIDE SETBACKS WITHOUT CREATING EASEMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. 17. THE GENERAL CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED TO MINIMIZE EXCAVATION AND VEGETATION IMPACTS TO THE SITE. 18. THE GENERAL CONTRACTOR SHALL MINIMIZE THE LIMITS OF EXCAVATION AND TAKE ADEQUATE MEASURES TO PROTECT ALL VEGETATION BEYOND THE LIMITS OF EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE EXCAVATION. ALL AREAS OF DISTURBANCE SHALL BE RE-VEGETATED TO BLEND WITH THE NON-DISTURBED LANDSCAPE. 19. THE SOILS REPORT IS AVAILABLE FROM OWNER'S SOILS ENGINEER. 20. GENERAL CONTRACTOR SHALL VERIFY ALL SITE DEVELOPMENT WITH LANDSCAPE CONSTRUCTION DOCUMENTS. THE SITE PLAN IS FOR GRADING AND LANDSCAPE PLAN IS FOR LAYOUT; ANY DISCREPANCIES VERIFY WITH ARCHITECT. 21. CONTRACTOR TO COMPLY WITH SPECIAL INSPECTIONS- IBC-1704.1.1 BUILDING PERMIT REQUIREMENT. 22. THE POOL AND SPA DRAWINGS SHALL BE INCLUDED AS A DEFERED PERMIT SET LANDSCAPE ARCHITECT COLORADO LAND ART STUDIO, INC. PO BOX 2257 EAGLE, CO 81631 PH. 970.376.2977 CONTACTS: CRISTIAN BASSO A000 COVER SHEET A001 PHASE I&II FLOOR AREA L-0.0 TOPOGRAPHIC SURVEY 1"=20'-0" L-1 EXISTING CONDITIONS 1 16"=1'-0" L-2 SITE PLAN 1"=20'-0" L-3 LANDSCAPE PLAN 1"=20'-0" L-4 WINTER SPA ENLARGED PLANS 1 4"=1'-0" L-5 SUMMER POOL & SPA ENLARGED PLANS 1 4"=1'-0" L-6 SECTIONS 1 4"=1'-0" L-7 SNOWMELT PLAN L-8 PLANTING DETAILS NTS L-9 DETAILS L-10 DETAILS/ ELEVATION AE1.0 SITE LIGHTING PLAN 1"=10'-0" C-1 GRADING- DRAINAGE PLAN C-2 GRADING- DRAINAGE PLAN NORTH C-3 GRADING- DRAINAGE PLAN SOUTH C-4 GRADING- DRAINAGE PLAN DETAILS D1.0 DEMO PLAN/ PHASE I LEVEL 1 3 16"=1'-0" D1.1 DEMO PLAN/ PHASE I LEVEL 2 3 16"=1'-0" D1.2 DEMO PLAN/ PHASE I LEVEL 3 3 16"=1'-0" D1.3 DEMO PLAN/ PHASE I LEVEL 4 3 16"=1'-0" D1.4 DEMO PLAN/ PHASE I LEVEL 5 3 16"=1'-0" D1.5 DEMO PLAN/ PHASE II GARAGE 3 16"=1'-0" D1.6 DEMO PLAN/ PHASE II LEVEL 1 3 16"=1'-0" D1.7 DEMO PLAN/ PHASE II LEVEL 2 3 16"=1'-0" D1.8 DEMO PLAN/ PHASE II LEVEL 3 3 16"=1'-0" D1.9 DEMO PLAN/ PHASE II LEVEL 4 3 16"=1'-0" A2.1 PHASE I/ LEVEL ONE FLOOR PLAN 3 16=1'-0" A2.2 PHASE I/ LEVEL TWO FLOOR PLAN 3 16"=1'-0" A2.3 PHASE I/ LEVEL THREE FLOOR PLAN 3 16=1'-0" A2.4 PHASE I/ LEVEL FOUR FLOOR PLAN 3 16"=1'-0" A2.5 PHASE I/ LEVEL FIVE FLOOR PLAN 3 16"=1'-0" A2.6 PHASE II/ GARAGE FLOOR PLAN 3 16"=1'-0" A2.7 PHASE II/ LEVEL ONE FLOOR PLAN 3 16"=1'-0" A2.8 PHASE II/ LEVEL TWO FLOOR PLAN 3 16"=1'-0" A2.9 PHASE II/ LEVEL THREE FLOOR PLAN 3 16"=1'-0" A2.10 PHASE II/ LEVEL FOUR FLOOR PLAN 3 16"=1'-0" A2.11 PHASE I & II ROOF PLAN 3 16"=1'-0" A2.12A ENLARGED PLAN 1 2"=1'-0" A2.12B ENLARGED PLAN 1 2 "=1'-0" A2.12C ENLARGED PLAN 1 2 "=1'-0" A2.12D ENLARGED PLAN 1 2 "=1'-0" A2.12E ENLARGED PLAN 1 2 "=1'-0" A2.13 PHASE I/ LEVEL 1 REF. CLG. PLA 1 2"=1'-0" A2.14 PHASE I/ LEVEL 2 REF. CLG. PLAN 3/16"=1'-0" A2.15 PHASE I/ LEVEL 3 REF. CLG. PLAN 3/16"=1'-0" A2.16 PHASE I/ LEVEL 4 REF. CLG. PLAN 3/16"=1'-0" A2.17 PHASE I/ LEVEL 5 REF. CLG. PLAN 3 16"=1'-0" A2.18 PHASE II/ GARGE LEVEL REF. CLG. PLAN 3 16"=1'-0" A2.19 PHASE II/ LEVEL ONE REF. CLG. PLAN 3 16"=1'-0" A2.20 PHASE II/ LEVEL TWO REF. CLG. PLAN 3 16"=1'-0" A2.21 PHASE II/ LEVEL THREE REF. CLG. PLAN 3 16"=1'-0" A2.22 PHASE II/ LEVEL FOUR REF. CLG. PLAN 3 16"=1'-0" A3.0A ELEVATION KEYNOTES NTS A3.0 PHASE I ELEVATIONS 3 16"=1'-0" A3.1 PHASE I ELEVATIONS 3 16"=1'-0" A3.2 PHASE I & II ELEVATIONS 3 16"=1'-0" A3.3 PHASE II ELEVATIONS 3 16"=1'-0" A3.4 POOL ELEVATIONS 1/4"=1'-0" A3.5 PHASE I ELEVATIONS 3 16"=1'-0" A4.0 SECTIONS 1 4"=1'-0" A4.1 SECTIONS 1 4"=1'-0" A4.2 UL DETAILS NTS A4.3 WATERPROOFING DETAILS VARIES A4.4 WATERPROOFING DETAILS VARIES A4.4B WATERPROOFING DETAILS VARIES A4.5 DETAILS VARIES A4.6 SECTIONS AT PENTHOUSE VARIES A4.7 WINDOW DETAILS VARIES A4.8 DOOR DETAILS VARIES DRAWING INDEX: INTERNATIONAL BUILDING CODE 2003 PROJECT CODE SUMMARY : GENERAL CONTRACTOR EVANS-CHAFFEE CONSTRUCTION PO BOX 8266 AVON, CO 81620 PH. 970.845.0466 FX. 970.845.0465 CONTACT: COLLEEN BUTLER MECHANICAL ENGINEER BIGHORN CONSULTING ENGINEERS, INC. 569 S. WESTGATE DR. STE. 1 GRAND JUNCTION, CO 81505 PH. 970.241.8709 FX. 970.241.9514 CONTACTS: BLAINE BUCK, PE MECHANICAL CONTRACTOR COMMERCIAL DESIGN ENGINEERING, LTD 1003 WINTERS AVE. GRAND JUNCTION, CO 81501 PH.970.245.0595 FX.970.245.1015 CONTACT: STEVE KING ELECTRICAL CONTRACTOR EC ELECTRIC1 80 METCALF RD. UNIT C3 AVON, CO 81620 PH. 970.748.0934 FX. 970.748.0935 CONTACT: DUSTIN RIDDLE FIRE SPRINKLER CONSULTANTS BFPE PO BOX 1068 WESTMINISTER, CO PH. 303.933.1555 CONTACT: PERRY MATTHEWS WATERPROOFING CONSULTANTS BUILDING CONSULTANTS & ENGINEERS, INC. 1520 WEST CANAL COURT, STE. 240 LITTLETON, CO 80120 PH. 303.350.1000 CONTACT: LINDA MCGOWAN, PE SOILS ENGINEER LKP ENGINEERING, INC. EDWARDS, CO PH. 970.926.9088 FX. 970.926.9089 CONTACT: LUIZA PETROVSKA STRUCTURAL ENGINEER KRM CONSULTANTS, INC. PO BOX 4572 VAIL,CO 81658 PH. 970.949.9391 FX. 970.949.1577 CONTACT: MIKE STRUMPH FA1 PHASE I- FIRE ALARM MISC. NTS FA2 PHASE I- FIRE ALARM MISC. NTS FA3 PHASE I- FIRE ALARM MISC. NTS FA4 PHASE I FIRE ALARM -1ST FLOOR 1 8 "=1'-0" FA5 PHASE I FIRE ALARM- 2ND FLOOR 1 8 "=1'-0" FA6 PHASE I FIRE ALARM- 3RD FLOOR 1 8 "=1'-0" FA7 PHASE I FIRE ALARM- 4TH FLOOR 1 8 "=1'-0 FA8 PHASE I FIRE ALARM- 5TH FLOOR 1 8"=1'-0 FA9 PHASE I FIRE ALARM- LOFT FLOOR 1 8"=1'-0 FP1 PHASE I FIRE SPRINKLER MISC. NTS FP2 PHASE I FIRE SPRINKLER MISC. NTS FP3 PHASE I FIRE SPRINKLER 1ST FLOOR 1 8"=1'-0" FP4 PHASE I FIRE SPRINKLER 2ND FLOOR 1 8 "=1'-0" FP5 PHASE I FIRE SPRINKLER 3RD FLOOR 1 8 "=1'-0" FP6 PHASE I FIRE SPRINKLER 4TH FLOOR 1 8 "=1'-0" FP7 PHASE I FIRE SPRINKLER 5TH FLOOR 1 8 "=1'-0" FP8 PHASE I FIRE SPRINKLER LOFT FLOOR 1 8 "=1'-0" FA1 PHASE II FIRE ALARM MISC NTS FA2 PHASE II- FIRE ALARM MISC. NTS FA3 PHASE II- FIRE ALARM MISC. NTS FA4 PHASE II FIRE ALARM -GARAGE "=1'-0" FA5 PHASE II FIRE ALARM- 1ST FLOOR 1 8 "=1'-0" FA6 PHASE II FIRE ALARM- 2ND FLOOR 1 8 "=1'-0" FA7 PHASE II FIRE ALARM- 3RD FLOOR 1 8 "=1'-0 FA8 PHASE II FIRE ALARM- 4TH FLOOR 1 8 "=1'-0 FP1 PHASE II FIRE SPRINKLER MISC. NTS FP2 PHASE II FIRE SPRINKLER MISC. NTS FP3 PHASE II FIRE SPRINKLER GARAGE 1 8 "=1'-0" FP4 PHASE II FIRE SPRINKLER 1ST FLOOR 1 8 "=1'-0" FP5 PHASE II FIRE SPRINKLER 2ND FLOOR 1 8 "=1'-0" FP6 PHASE II FIRE SPRINKLER 3RD FLOOR 1 8 "=1'-0" FP7 PHASE II FIRE SPRINKLER 4TH FLOOR 1 8"=1'-0" Main Occupancy Classification and Type of Construction - R-2- Type III- B Automatic sprinkler system Table 503- Phase I/Four stories plus basement, Phase II/ Four Stories plus basement 8QGHUVTXDUHIHHWRI´DUHDEXLOGLQJµSHUIORRUVHHDWWDFKHGDOORZDEOHIORRUDUHDFDOFXODWLRQV See A001- For area calculations. Other Occupancy Classifications shall be classified under Table 302.1.1 Incidental Use areas as follows: Room: Separation: Boiler Room Provide automatic fire-extinguishing system/ plus smoke separation. Parking Garage 1 hour and provide automatic fire-extinguishing system/ plus smoke separation. Waste and Linen collection Room Provide automatic fire-extinguishing system/ plus smoke separation. Storage 100 sq ft or over- provide automatic fire-extinguishing system/ plus smoke separation. Type III B- See table 601 for complete fire-resistance rating Main Ratings Per Code: Structural frame- 0 hr (Table 601) Exterior (Non Bearing) Walls- 1 hr (Table 602) Interior Non Bearing- 0 hr (Table 601) Exterior Bearing Walls- 2 hr (Table 601) Roof Construction- 0 hr (Table 601) Corridors serving R-2- 0.5 hr Walls Separating Dwelling Units- 1 hr Hor. Floor/ Ceiling Assemblies- 0 hr Shaft Assemblies- 1 & 2 hr (707.4) Exit Stair Enclosures- 2 hr Non- Combustible material- Concealed Soffit, Overhang, Decks, Lobby Entry, Trash Dumpster, and Over Framed Roofs. A6.0 INTERIOR ELEVATIONS- PHASE I 3 16"=1'-0" A6.1 INTERIOR ELEVATIONS- PHASE II 3 16"=1'-0" A6.2 INTERIOR ELEVATIONS- PHASE II 3 16"=1'-0" A7.0 DOOR & WINDOW SCHEDULE A7.1 INTERIOR DOOR SCHEDULE S1 STRUCTURAL- SPECS. S2 STRUCTURAL- PHASE I STAIR TOWER VARIES S3 PHASE I ROOF FRAMING/ DUMPSTER FOUND./ PHASE II ROOF FRAMING/LOBBY FOUND. S4 PHASE II FOUND./LEVEL 1 DECK PLAN S5 PHASE II LEVEL 2/ LEVEL 3 DECK PLAN S6 PHASE II ROOF FRAMING S7 PHASE I FOUND./ MAINT. ROOF FRAMING S8 PHASE II FOUND./ SKI LOCKER ROOF FRAMING S9 DETAILS S10 PENTHOUSE REMODEL SPECS/ DETAILS S11 PENTHOUSE REMODEL ROOF FRAMING PLAN S12 DETAILS M1.0 MECHANICAL SITE PLAN M1.1 MECHANICAL LEGEND/ SCHEDULES M1.7 PHASE II GARAGE MECH. PLAN M1.8 PHASE II LEVEL 1 MECH. PLAN M1.9 PHASE II LEVEL 2 MECH. PLAN M1.10 PHASE II LEVEL 3 MECH. PLAN M1.11 PHASE II LEVEL 4 MECH. PLAN M1.12 MECH. BOILER SCHEMATIC & BOILER ROOM E1.0 PHI ELEC. ONE LINE DIAGRAMS PHASE I E1.1 PHI POWER PLAN & PANEL SCHEDULES E1.0 PHII ELEC. ONE LINE DIAGRAMS PHASE II E1.1 PHII SHORT CIRCIT CALCS, DIAGRAM & CALCS E1.2 ELEC. SCHEDULES AND DETAILS E1.3 PHASE I LEVEL 1 ELEC. PLAN E1.4 PHASE I LEVEL 2 ELEC. PLAN E1.5 PHASE I LEVEL 3 ELEC. PLAN E1.6 PHASE I LEVEL 4 ELEC. PLAN E1.7 PHASE I COVERED PARKING ELEC. PLAN E1.8 PHASE II GARAGE ELEC. PLAN E1.9 PHASE II LEVEL 1 ELEC. PLAN E1.10 PHASE II LEVEL 2 ELEC. PLAN E1.11 PHASE II LEVEL 3 ELEC. PLAN E1.12 PHASE II LEVEL 4 ELEC. PLAN E1.13 ELECTRICAL SITE PLAN E1.14 ELECTRICAL SITE PLAN E1.15 ELECTRICAL SITE PLAN P R O J E C T : 710 W. LIONSHEAD CIR. UNIT A VAIL . CO 81657 970.477.2990 970.477.2965(F) D R A W N B Y : D A T E : R E V I S I O N S : 2329/ 2330 Lodge at Lionshead-LoT 7 Block 1, Vail Lionshead Filing 1/ 380 E. Lionshead Cir. Town of Vail, Eagle County Colorado Common Elements/Improvements HB/GM DRB APPROVED 7/15/2015 12:00:00 AM