HomeMy WebLinkAboutDRB150311_S2.2a_1438203900.pdfD E F G H.1 I
I
D.1
D.2 E.1 E.2 G.1 H
1
2
3.1
5.1
5.2
5.3
7.1
7.2
E.3 G.2
1
1
1
1
1
1
AB
AB
AB
AB
AB
AB
1
Partial Entry Level Floor Framing Plan
S2.2 a
Title
Framing Plan
Entry Level Floor
Sundquist
SDG
JDS
Date
Checked By
Drawn By
SDG Project No.
Date Issue
Progress Set
14-073
10/09/14
07/08/2015
Progress Set
10/17/14
Construction
10/20/14
Revision # 1
11/30/14
1
As-Built Conditions
07/08/15
AB
DRB
APPROVED
7/29/2015
12:00:00 AM