Loading...
HomeMy WebLinkAboutDRB150321_Utility Verification_Comcast_1438110540.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: 5020 Main Gore Drive - M4 Lot Block Subdivision: Primary Contact/Owner Representative: Phone: - Plans Dated: Primary Contact/Owner Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Kelly McClernon kollv.fncclernon@ceniurvl nk corn XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker ramirrg1 fbakerOxceleneray.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact: Jeff Vroom 1vroom( holycross corn XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire parr ela.mcquire pDxcelenergy_corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk ikirk rYLO°rg COMCAST CABLE Pie c se ver,o'�r WL I4'Q S 970.930.4713(tel) rOrio �� 8 CaLuo� c� 303.603.1004(fax) Contact: Michael Johnson �^\ 1 (� Ui C C G 3 /e://K Mich*johnsonfIcabl9.comcast.corn 1 ��/\,ES*- CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel rougsin2dot.state,cc,u 6 NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.