Loading...
HomeMy WebLinkAboutDRB150337_A4.4_1438727460.pdfREMOVE DECKS REMOVE RAILING R @ 7 3/16" 5 EXTERIOR COMP. WOOD STAIRS STUCCO VENEER REMOVE STAIRS SMALL CONC. PAD 2' - 6" 2X12 NEW METAL ROOFING R-49 BIBS INSULATION (14" DEEP) EXTRA INSULATION SOFFIT TO MATCH EXIST. 2X8 FASCIA NEW CEILING BEAM TO SUPPORT HEADER REMOVE DOOR REMOVE WINDOW, CREATE OPENING NEW SLIDER DOOR 2' - 6" NEW FLOOR JOISTS R-30 BIBS INSULATION NEW BEAM NEW LEDGER 2" 12" REMOVE EXIST. ROOF 2X12 R @ 6" 4 EXTERIOR COMP. WOOD STAIRS STUCCO VENEER STUCCO VENEER NEW PATIO DOOR 7' - 0" 2' - 6" CONTRACTOR TO VERIFY SEWER LINE LOCATION 2. MAIN LEVEL 41' - 0 3/8" 3. ENTRY LEVEL 50' - 2 1/2" 1. BASEMENT 31' - 10 3/4" EXISTING SONOTUBE FOUNDATION PIERS EXISTING NON- BEARING WALL EXISTING RIM BEAM EXISTING SLAB REMOVE WALL AFTER NEW EXTERIOR WALL PLACED TO PICK UP CANTILEVER. NEW BEARING EXTERIOR WALL 28' - 10 3/4" 2' - 4" 9" 2' - 4" 2' - 6" MAX WITHOUT RAILING BOULDER RETAINING WALL CONTRACTOR TO VERIFY HEIGHT 5' - 2 13/16" BLOCKING CANTILEVER WATERPROOF DECK: 3" CONC SLAB (COLOR & PATTERN) OVER W.P.MEMBRANE (NO PENTETRATIONS) OVER SHEATHING OVER SLOPING JOISTS (1/8" / FT.) BEAM RE: STRUCT. WRAP POST W/ STONE VENEER SPIRAL STAIR - CENTER POLE DRIP-THRU DECK - COMPOSITE DECKING OVER JOISTS 3' - 0" NEW HOT TUB SLAB BUILD-UP GRADE 2X12 2X12 UNCONDITIONED SPACE 6' - 6" R-22 BIBS INSULATION R-30 BIBS INSULATION CONTRACTOR TO VERIFY SEWER LINE LOCATION HOT TUB CONDITIONED SPACE EXISTING SPACE CLIMATE ZONE FENESTRATION U-FACTOR SKYLIGHT U-FACTOR GLAZED FENESTRATION SHGC CEILING R-VALUE WOOD FRAME WALL R-VALUE MASS WALL R-VALUE FLOOR R-VALUE BASEMENT WALL R-VALUE SLAB R-VALUE & DEPTH CRAWLSPACE WALL R-VALUE 6 .32 .55 NOT REQUIRED 49 20 + 5 (OR 13 + 10) 15 / 20 30 15 / 19 10 , 4 ft. 15 / 19 FROM TABLE R402.1.1 - IRC 2012 FROM TABLE N1102.1.1 - IECC 2012 INSULATION MINIMAL VALUES BY CODE a b c d e f e a. Eagle County lies in climate zone 6B. b. This is a prescriptive maximum u-factor for all windows and doors for a project considered an "addition". c. This means R-20 for cavity insulation + R-5 for exterior continuous insulation. The Town of Vail has not adopted the additional R-5 at this time per amendment to section 101.1. d. The second R-value applies when more than half the insulation is on the interior of the mass wall. e. "15/19" means R-15 continuous insulation on the interior or exterior of the basement wall -or- R-19 cavity insulation at the interior of the basement wall (a combination cavity and continuous must equal R-19 as well). f. R-5 shall be added for heated slabs. The R-values and depth dimension can be spread between perimeter and under-slab locations. 970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number Date REVISIONS 7/23/2015 11:22:58 AM A4.4 WALL SECTIONS xxxx BRIAR PATCH IMPROVEMENTS PERMIT SET 7-23-15 7-23-15 BRIAR PATCH UNITS 1390 Briar Patch Ln, Vail, CO UNITS 1, 2, & 3 No. Description Date 1/2" = 1'-0" 1 2. ADDITION WALL SECTION 1 1/2" = 1'-0" 2 2. ADDITION WALL SECTION 2 Door Schedule Mark Family and Type Width Height Comments 01 3_Panel_Glass_Slider NO MULLIONS: 108" x 84" 9' - 0" 8' - 0" 02 Single-Glass 1: 30" x 84" 2' - 6" 7' - 0" 03 Single-Flush: 28" x 84" 2' - 4" 7' - 0" Window Schedule Mark Type Mark Window Type Width Height Head Height Comments 101 A Awning 3' - 4" 2' - 0" 3' - 3" 102 B Picture 2' - 8" 3' - 6" 6' - 9" 103 C Casement 3' - 4" 3' - 6" 6' - 9" INSULATION SUMMARY ALL MINIMUM INSULATION VALUES FROM IRC 2012 ROOF JOIST CAVITY = R-56 (NON-VENTED) (MIN. R-49) EXTERIOR WALL INSULATION = R-22 (MIN. R-20) BASEMENT WALL INSULATION = R-24 / R-19 (MIN. R-19) SLAB PERIMETER INSULATION = R-10 (MIN. R-10) UNDER-SLAB INSULATION = R-10/ R-15 (MIN. R-10) FLOOR OVER UNCONDITIONED = R-30 (MIN. R-30) WINDOWS U-VALUE MAX. = U-.32 (MAX. U-.32) INSULATION SUBCONTRACTOR MUST VERIFY THAT R-VALUES OF PROPRIETARY PRODUCTS MEET OR EXCEED THE R-VALUES LISTED ABOVE AND THAT INSTALLATION PERFORMED PER MANUFACTURER'S SPECIFICATIONS. ALL INSULATION SHALL COMPLETELY FILL STUD/JOIST SPACES AND HAVE PROPER AIR-BARRIER SHEATHING ON BOTH SIDES OF THE STUD/JOIST SPACES. WINDOW NOTES: 1. ALL NEW WINDOWS SHALL BE DOUBLE-PANED WOOD WINDOWS W/ ALUM. CLADDING OR FIBERGLASS AND SHALL MATCH THE WHITE CLADDING COLOR OF THE ORIGINAL WINDOWS. 2. U-VALUE OF .32 MAXIMUM (SEE INSULATION SUMMARY THIS SHEET). 3. ALL WINDOWS TO RECEIVE LOW-E TREATMENT. 4. ALL SIZES SHOWN ARE NOMINAL. CONTRACTOR TO VERIFY ROUGH-OPENING SIZES WITH CHOSEN WINDOW MANUFACTURER. 5. WINDOWS MUST DISPLAY MANUFACTURER SPECS INCLUDING R-VALUES PRIOR TO T.O.VAIL INSPECTIONS. DOOR NOTES: 1. ALL NEW GLASS DOORS SHALL BE WOOD W/ ALUM. CLADDING OR FIBERGLASS AND SHALL MATCH THE WHITE CLADDING COLOR OF THE ORIGINAL WINDOWS. 2. U-VALUE OF .32 MAXIMUM (SEE INSULATION SUMMARY THIS SHEET). 3. ALL GLASS DOORS TO RECEIVE LOW-E TREATMENT. 4. ALL SIZES SHOWN ARE NOMINAL. CONTRACTOR TO VERIFY ROUGH-OPENING SIZES WITH CHOSEN WINDOW MANUFACTURER. 5. WINDOWS MUST DISPLAY MANUFACTURER SPECS INCLUDING R-VALUES PRIOR TO T.O.VAIL INSPECTIONS. 1/4" = 1'-0" 3 2012 Energy Table DRB APPROVED 8/4/2015 12:00:00 AM