Loading...
HomeMy WebLinkAboutDRB150443_DRB150443 Action Form_1444324500.pdfDesign Review Board ACTION FORM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: MOUNTAIN CI CHANGES DRB Number: DRB150443 Project Description: Participants: Changes: Use of stoneterra blocks for retain 42'@ driveway, change in stone veneer, change from on grade terrace to elevated drip thru, light fixture OWNER MOUNTAIN C.I. HOLDINGS LTD 09/24/2015 1480 SANDHILLS DR UNIT 4 ANCASTER ONTARIO L9G 4V5 CANADA APPLICANT MARTIN MANLEY ARCHITECTS 09/24/2015 Phone: 970-328-1299 PO BOX 1587 EAGLE co 81631 License: C000003902 ARCHITECT MARTIN MANLEY ARCHITECTS 09/24/2015 Phone: 970-328-1299 PO BOX 1587 EAGLE co 81631 License: C000003902 Project Address: 2755 SNOWBERRY DR VAIL Location: West Side of Duplex Legal Description: Lot: 10 Block: 9 Subdivision: VAIL INTERMOUNTAIN DEV S Parcel Number: 2103-143-0104-0 Comments: Please see below. BOARD/STAFF ACTION Motion By: Forstl Second By: cahill Vote: 4-0-0 Action: APPROVED Date of Approval: 10/07/2015 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:O (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. .... : ' ;.J ' ' '1 ~ Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0014336 1. The approved options for the wall in question include the previously approved boulder wall, a cement wall with stone veneer matching the house body stone with an appropriate transition (as determined by staff) to the constructed boulder wall to the west, or a stucco wall that terminates at an inside corner with an appropriate transition (as determined by staff) to the constructed boulder wall to the west. Planner: Jonathan Spence ORB Fee Paid: $20.00 '· .:· .. 1."