Project Name: MOUNTAIN CI CHANGES DRB Number: DRB150443
Project Description:
Participants:
Changes: Use of stoneterra blocks for retain 42'@ driveway, change in stone veneer, change
from on grade terrace to elevated drip thru, light fixture
OWNER MOUNTAIN C.I. HOLDINGS LTD 09/24/2015
1480 SANDHILLS DR UNIT 4
ANCASTER ONTARIO
L9G 4V5 CANADA
APPLICANT MARTIN MANLEY ARCHITECTS 09/24/2015 Phone: 970-328-1299
PO BOX 1587
EAGLE co 81631
License: C000003902
ARCHITECT MARTIN MANLEY ARCHITECTS 09/24/2015 Phone: 970-328-1299
PO BOX 1587
EAGLE co 81631
License: C000003902
Project Address: 2755 SNOWBERRY DR VAIL Location: West Side of Duplex
Legal Description: Lot: 10 Block: 9 Subdivision: VAIL INTERMOUNTAIN DEV S
Parcel Number: 2103-143-0104-0
Comments: Please see below.
BOARD/STAFF ACTION
Motion By: Forstl
Second By: cahill
Vote: 4-0-0
Action: APPROVED
Date of Approval: 10/07/2015
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:O
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
.... : ' ;.J
' ' '1 ~
Cond: 202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Cond: CON0014336
1. The approved options for the wall in question include the previously approved
boulder wall, a cement wall with stone veneer matching the house body stone with an
appropriate transition (as determined by staff) to the constructed boulder wall to
the west, or a stucco wall that terminates at an inside corner with an appropriate
transition (as determined by staff) to the constructed boulder wall to the west.
Planner: Jonathan Spence ORB Fee Paid: $20.00
'· .:· .. 1."