Loading...
HomeMy WebLinkAboutDRB150457_A2.2 New Floor Plans_1444429020.pdfELV 64'-8 1/2" NEW POWDER ROOM. RELOCATE ELECT. PANELS TO BEDROOM SIDE OF WALL NEW LOCATION FOR DOOR TO BEDROOM RELOCATE DOOR TO BATH NEW CLOSET WITH BY-PASS DOORS LINE OF NEW DECK ABOVE NEW WINDOWS NEW ENTRY DOOR & SIDELITE NEW HEAT N GLO COSMO 42 GAS FIREPLACE AT DINING NEW STAIR RAILING NEW STAIR DOWN 16 R @ 7.5" NEW 3-PANEL SLIDER NEW TOWN & COUNTRY TC 42 FIREPLACE W/ PAINTED DRYWALL OR VENITIAN PLASTER SURROUND. REDUCED WIDTH STONE CHASE TO MATCH EXISTING AT EXT. REF. REF. DRAWERS NEW 3-PANEL SLIDER AND WINDOWS AT LIVING ROOM LOW CABS (MATCH KITCH HEIGHT) W/ SHELVES ABOVE BOTH SIDES OF FP BASE CABS BASE CABS W/ SHELVES ABOVE DW NEW WOOD FLOORING THROUGHOUT MAIN LEVEL REF. DRAWERS REMOVE EXISTING SOFFIT, NEW VANITY, PLUMBING FIXTURES AND SHOWER ELV 73'-5 1/2" RELOCATE DOOR, REMOVE WALL, AND REPLACE WITH NEW RAILING NEW BARN DOOR- ELIMINATE BUMP OUT AT WALL TO ALLOW DOOR TO SLIDE BACK EXISTING BOOKSHELVES TO REMAIN AND TO BE PAINTED NEW HEAT N GLO COSMO 42 GAS FIREPLACE- CHASE TO BE SHARED WITH DINING FIREPLACE FLUE. NEW PAINTED DRYWALL FINISH AT CHASE NEW WOOD-FRAMED, DRIP THROUGH IPE WOOD DECK AND STEEL RAILING WITH IPE TOP RAIL NEW 3-PANEL SLIDER NEW SHOWER WALLS AND GLASS. PLUMBING FIXTURES TO BE RELOCATED TO ADJACENT WALL NEW VANITY AND PLUMBING FIXTURES NEW FREE-STANDING TUB NEW PARTIALLY TRANSLUCENT SHOWER GLASS ENCLOSURE AT W.C. REMOVE EXISTING SOFFIT, NEW VANITY, PLUMBING FIXTURES AND SHOWER NEW MASTER DOOR LOCATION RENOVATION GENERAL NOTES: 1. NO WORK TO LOWER LEVEL UNLESS NOTED OTHERWISE 2. ALL WORK TO BE COMPLIANT WITH TOWN OF VAIL ADOPTED BUILDING CODES. CONTRACTOR IS RESPONSIBLE TO ASSURE ADHERENCE WITH CODES. 3. VERIFY ALL DIMENSIONS IN THE FIELD. NOTIFY ARCHITECT OF ANY DISCREPANCIES 4. NEW WOOD FLOORING TYP. @ MAIN LIVING LEVEL, INCL. BEDROOM 5. NEW TILE AT BATH FLOORS, SHOWERS AND SHOWER FLOORS 6. REMOVE ALL TUBS AND REPLACE WITH SHOWERS WITH FRAMELESS GLASS ENCLOSURES. TEMPERED GLAZING AT SHOWER ENCLOSURES PER IRC R308.4 7. REPLACE ALL PLUMBING FIXTURES TYP. 8. REPLACE ALL VANITIES TYP. 9. REPLACE KITCHEN CABINETS AND APPLIANCES. SAVE EXISTING REF. FOR REUSE AT PANTRY. 10. ELIMINATE CROWN MOULDING TYP. 11. NEW SKIM COAT AND SQUARE CORNERS AT DRYWALL TYP. 12. DRYWALL RETURNS AT ALL WINDOWS AND DOORS TYP. 13. NEW PAINTED 5 8" X 6" WOOD BASE TYP. 14. PAINT INTERIOR OF ALL WINDOW FRAMES 15. REPLACE WINDOWS AS SHOWN. ALL NEW FENESTRATION TO MEET MAX U-VALUE .30 16. REPLACE ENTRY DOOR AND ENLARGE TO ADD NEW ENTRY DOOR AND SIDELITE. 17. REPLACE ALL INTERIOR DOORS WITH NEW PAINTED 3 PANEL SHAKER, SQUARE SHOULDER, PAINTED JAMB 18. ELIMINATE WOOD CEILINGS AT DINING AND REPLACE W/ DRYWALL. MAXIMIZE HEIGHT 19. PAINT WOOD CEILING AT LIVING. EXISTING LIGHTING TO REMAIN. 20. NEW STEEL RAILING AT STAIRS AND LANDING 21. NEW U-STAIR TO REPLACE EXISTING CIRCULAR STAIR 22. ELIMINATE WOOD BURNING FIREPLACE AT LIVING, AND REPLACE WITH NEW GAS FIREPLACE. REDUCE WIDTH OF STONE SURROUND AT EXTERIOR. NEW DRYWALL SURROUND AT INTERIOR. 23. ELIMINATE EXISTING FIREPLACE AT DINING AND REPLACE WITH NEW GAS FIREPLACE 24. NEW CABINETS AND COUNTERS AT DINING AND KITCHEN 25. INSTALL NEW GAS FIREPLACE AT MASTER BEDROOM W/ TV ABOVE 26. EXISTING MASTER BEDROOM SHELVES TO REMAIN AND TO BE PAINTED 27. NEW MINI RECESSED CAN LIGHTING TO REPLACE EXISTING 6" RECESSED CANS. ALL EXIST. MINI-RECESSED CANS TO REMAIN. NEW DECORATIVE FIXTURES AT SCONCES, CHANDELIERS AND BATH VANITIES TYP. ALL NEW LAMPS TO BE LED (HIGH EFFICACY) 28. NEW DARK SKY COMPLIANT EXTERIOR LIGHT FIXTURES TYP. TO MATCH DUPLEX MATE 29. ADD NEW MORTAR AT EXTERIOR STONE VENEER TO MATCH ADJACENT UNIT 30. ADD NEW WOOD GATE AND PRIVACY WALL IN PLACE OF EXISTING GATE 31. REPLACE EXISTING METER DOORS WITH NEW SLATTED WOOD DOORS TO MATCH GATE C & DESIGN PO box 8332 Avon CO 81620 970.390.0968 pavan@kruegerarchitecture.com COPYRIGHT 2015 KRUEGER ARCHITECTURE & DESIGN 1/4" = 1'-0" 1/4" = 1'-0" DRB APPROVED 10/9/2015 12:00:00 AM