Loading...
HomeMy WebLinkAboutDRB150458_TOV DRB FINAL- Shirley rowhouse letter_1443553140.pdf Transmittal: Town of Vail Community Development September 28, 2015 RE: 303 Gore Creek Dr. Unit 8 Enclosed: Final DRB submittal We have been working simultaneously with the Galvin’s architect (unit 9 and 10). The goal is to begin construction at the same time. Proposed is moving the façade towards the street which is a response to the Galvin’s project and stepping it back towards unit 7. The back of the house has been squared off and reduced the size of the existing decks. The current roof deck will be filled in to create a new master suite. The roof of the new master will have a sod roof and a flat roof deck. We are proposing to reuse several windows and stay with the existing materials and color pallet. Submittal: 1. Application 2. Site plan, Floor plans, Elevations, Sections Thank you, Millie Aldrich