Transmittal:
Town of Vail Community Development September 28, 2015
RE: 303 Gore Creek Dr. Unit 8
Enclosed: Final DRB submittal
We have been working simultaneously with the Galvin’s architect (unit 9 and 10). The
goal is to begin construction at the same time. Proposed is moving the façade towards
the street which is a response to the Galvin’s project and stepping it back towards unit
7. The back of the house has been squared off and reduced the size of the existing
decks. The current roof deck will be filled in to create a new master suite. The roof of the
new master will have a sod roof and a flat roof deck. We are proposing to reuse several
windows and stay with the existing materials and color pallet.
Submittal:
1. Application
2. Site plan, Floor plans, Elevations, Sections
Thank you,
Millie Aldrich