Loading...
HomeMy WebLinkAboutDRB150487_A201 - ELEV_1454361720.pdfLEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 FLOOR PLAN 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" LEVEL 5 - 77 77' - 0" LEVEL 2 GARAGE 45' - 0" LEVEL 1 - GARAGE 35' - 0" ALL WOOD SIDING TO BE REPLACED 3 COAT STUCCO SYSTEM BAY WINDOWS CLAD W/ COPPER PANELS (ALT: PREFINISHED METAL PANELS) REPLACE ALL WINDOWS AND DOORS, UNITS BY OWNER SANDBLAST AND ALL NEW POWDER COAT FINISH ALL RAILINGS NEW STANDING SEAM METAL PANEL SHED ROOFS AT STAIR TOWERS BY ASSOC. STAIR TOWERS CLAD IN 4" WESTERN RIB CORTEN STEEL PERFORATED METAL SCREENS TO NEW ROOFS PERF. MTL SCREENS TO NEW ROOFS LEVEL 1 CEILING 42' - 9" RECTANGULAR STAIR BAYS TO BE REFRAMED COPLANAR WITH ADJACENT WALLS . (DRAWINGS FORTHCOMING). NEW BAYS WILL BE CLAD IN MATERIAL SIMILAR TO TRIANGLE STAIR BAYS ABOVE. TYPICAL THROUGH OUT BUILDING LEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 FLOOR PLAN 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" LEVEL 8 108' - 0" LEVEL 5 - 77 77' - 0" LEVEL 2 GARAGE 45' - 0" LEVEL 1 - GARAGE 35' - 0" 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 17 REPLACE ALL WINDOWS AND DOORS, SEE WIN SCHEDULE SANDBLAST AND POWDER COAT ALL EXISTING RAILINGS CEDAR SLATS ON BOTH SIDES OF ALL LOW TERRACE WALLS CORRUGATED CORTEN STEEL CLADDING ON ALL STAIR TOWERS, NEW METAL SHED ROOFS INTEGRAL COLOR STUCCO SKIMCOAT ON ALL PRECAST CONCRETE WALL CEMENTIOUS TRIM BOARD AND 3 COAT STUCCO SYSTEM AT WINDOW/DOOR WALLS 1 A304 3 A304 LEVEL 1 CEILING 42' - 9" CAST IN PLACE CONCRETE WALL TO BE PATCHED AND REPAIRED WITH EPOXY SYSTEM AND INTEGRAL COLOR STUCCO SKIM COAT ALL REMAINING GLU-LAMS TO BE CLAD WITH COPPER SHEET (ALT: PREFINISHED METAL) BUILT-UP WALL WITH CEDAR SLATING ON FACE. (EXISTING CONCRETE WALL DASHED AS BEYOND) Scale Date Drawn By Checked By Project Number 1/8" = 1'-0" 10/12/2015 11:37:47 AM A201 ELEVATIONS VAIL SPA CONDOMINIUMS - wmc 09/18/2014 VSC14 710 W. LIONSHEAD CIRCLE 1/8" = 1'-0" 1 SOUTHEAST ELEVATION 1 1/8" = 1'-0" 2 WEST ELEVATION No. Description Date 1 Revision 1 Date 101 PROGRESS/PRICING 2 OCT 15 02 DRB REVIEW 12 OCT 15 DRB APPROVED 11/18/2015 12:00:00 AM