HomeMy WebLinkAboutDRB150509_A004_1446220080.pdfPOOL LEVEL
8115' - 8 9/16"
EL 8120
8120' - 0"
EL 8130
8130' - 0"
EL 8140
8140' - 0"
T.O.W. 1
8132' - 3"
5
A7.01
SLAB TO BE EXTENDED 6"
BEYOND EQUIPMENT
CONDENSER
SUPPORTED BY
STRUCTURE (TOP OF
CONDENSER AT LEAST
2'-0" BELOW ADJACENT
WALL)
NEW CONCRETE WALL
DEHUMIDIFIER
@ ELEVATION 8116'-0"
STEEL
STRUCTURE
TO SUPPORT
CONDENSER
27'-3"
EXISTING
WINDOW PANES
TO REMAIN
GATES WITH
LOUVERS
EXISTING WALLS
FOUNDATION DRAIN
CONCRETE FOOTINGS
EXISTING WINDOW
PANES TO BE
REPLACED WITH
SPANDREL GLASS
RETURN DUCT TO RUN
BELOW GRADE AND TURN
TOWARDS MECHANICAL ROOM
BEYOND
SUPPLY DUCT
NEW GRADING AS
NECESSARY TO COVER
RETURN DUCT
POOL LEVEL
8115' - 8 9/16"
EL 8120
8120' - 0"
EL 8130
8130' - 0"
EL 8140
8140' - 0"
NEW CONCRETE WALL
(PAINT TO MATCH)
REVEALS TO MATCH
28'-11"
EXISTING CONCRETE
WALL
EXISTING RETAINING
WALL TO REMAIN
EXISTING WINDOW
PANES TO BE
REPLACED WITH
SPANDREL GLASS
EXISTING
WINDOW TO
REMAIN
1650 Fallridge Road, Suite C-1
Vail, Colorado 81657
f.(970) 476-4901 p.(970)476-6342
103 WILLOW PLACE
VAIL, CO 81657
Date 1
A004
APPROVED
AND
PROPOSED
ELEVATIONS
SIMBA RUN
Project Number - 1460
10/27/15
DRB
1/4" = 1'-0"
1 ENCLOSURE SECTION - PROPOSED
1/4" = 1'-0"
2
WEST ENCLOSURE ELEVATION -
PROPOSED
1/4" = 1'-0"
3
ENCLOSURE SECTION - APPROVED
1/4" = 1'-0" 4
WEST ENCLOSURE ELEVATION -
APPROVED
DRB
APPROVED
10/30/2015
12:00:00 AM