Loading...
HomeMy WebLinkAboutDRB150541_DRB150541 Action Form_1449772860.pdfDesign Review Board ACTION FORM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: HARMAN WETLANDS ORB Number: DRB150541 Project Description: Wetlands removal per Core of Engineers approval Participants: OWNER HARMAN, JEREMY & JULIA 11/30/2015 6733 VANDERBILT AVE DALLAS TX 75214 APPLICANT K.H. WEBB ARCHITECTS PC 11/30/2015 Phone: 970-477-2990 710 WEST LIONSHEAD CIR, UNIT A VAIL co 81657 License: C000001627 ARCHITECT K.H. WEBB ARCHITECTS PC 11/30/2015 Phone: 970-477-2990 710 WEST LIONSHEAD CIR, UNIT A VAIL co 81657 License: C000001627 Project Address: 4284 COLUMBINE DR VAIL Location: Legal Description: Lot: B Block: Subdivision: BIGHORN SUBDIVISION Parcel Number: 2101-122-2900-5 Comments: Please see below. Motion By: Second By: Vote: Conditions: BOARD/STAFF ACTION Action: STAFFAPP Date of Approval: 12/10/2015 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0014391 The applicant shall stake the property line to ensure that all work is contained within the property. No grading shall occur within the floodplain. Erosion control measures employing BMP shall be installed prior to the commencmenet of work. Recommendations: 1. Although not a condition of approval, the Town of Vail would suggest upsizing the proposed shrubs to the 5 gallon size. This will increase the odds of survival and provide greater soil stability. 2. Removal of the Sod area on the southeast corner of the property and an extension of riparian buffer planting or a low planting-no mow grass. This will reduce maintenance required, reduce nitrogen loading in stream from grass clippings Planner: Jonathan Spence ORB Fee Paid: $20.00