HomeMy WebLinkAboutDRB160010_PROJECT NARRATIVE_1453491540.pdfFebruary
PROJECT
GALVIN R
PROJECT
Galvin Resi
Project #1
2/17/16
Design Re
This proje
completely
will be reb
be extend
This final D
specifically
review me
This proje
closely wit
district. O
building he
Neighbor
of units 8 a
We have a
their home
We are be
eroded. W
submitting
17, 2016
NARRATIVE
RESIDENCE
#1408
dence
408
eview Board,
ct encompass
y demolished
built in partner
ed vertically an
DRB submittal
y, it takes into a
eetings on 4/1
ct is the first co
th the Town P
One significant
eight. This wa
approval is no
and 11 and ha
also coordinat
es during our
eing sensitive t
We have agree
g our stabilizati
es units 9 & 1
and one single
rship with the O
nd horizontally
is the culmina
account comm
1/15, 5/6/15 a
omplete redev
Planners to ass
accomplishme
as key for our
ot required for
ave coordinate
ed our constr
construction.
to the creeksid
ed to work wi
on plan at a la
0 of the Vail R
e unit will be c
Owner of unit
y as required.
ation of years o
ments made by
and 6/7/15.
velopment of
sure we are co
ent was establi
project and es
r final DRB, bu
ed our project
uction schedu
We have the
de setting, but
th the Town E
ater date.
Row Houses o
constructed in
t 8. The party
of planning an
y the Design R
its kind for thi
omplying with
ishing historic
stablished a ba
ut we have had
with their in-p
le with them t
ir support to m
there is a sect
Engineer to sta
on Gore Cree
their place. T
y wall betwee
d discussion w
Review Board
s zone district
the intent of t
grade as a bas
aseline for all fu
d constant com
progress and p
to minimize im
move forward
tion of stream
abilize it as pa
k Drive. Both
The party wall
n units 10/11
with the Town
in the more r
t so we have b
the design guid
seline to meas
future projects
mmunications
planned future
mpacts on thei
d with this proj
m bank off of ou
rt of our proje
Page 1 of 2
h units will be
between unit
will remain, b
n of Vail. More
recent concep
been working
delines and zo
sure against fo
s in the comple
with the Own
e remodel wo
ir ability to enj
ject.
ur property th
ect and will be
ts 8/9
but will
e
ptual
one
r our
ex.
ners
ork.
oy
hat has
e
Galvin Residence
Project #1408
2/17/16 Page 2 of 2
We have taken great care in the design, detailing and finish selections to create a building appropriate to the
style and property value of the location. We believe our project will represent a benchmark for future
redevelopment projects in the zone district.
Thank you,
Ryan Wolffe, AIA, Architect
Senior Associate