Loading...
HomeMy WebLinkAboutDRB160010_PROJECT NARRATIVE_1453491540.pdfFebruary PROJECT GALVIN R PROJECT Galvin Resi Project #1 2/17/16 Design Re This proje completely will be reb be extend This final D specifically review me This proje closely wit district. O building he Neighbor of units 8 a We have a their home We are be eroded. W submitting 17, 2016 NARRATIVE RESIDENCE #1408 dence 408 eview Board, ct encompass y demolished built in partner ed vertically an DRB submittal y, it takes into a eetings on 4/1 ct is the first co th the Town P One significant eight. This wa approval is no and 11 and ha also coordinat es during our eing sensitive t We have agree g our stabilizati es units 9 & 1 and one single rship with the O nd horizontally is the culmina account comm 1/15, 5/6/15 a omplete redev Planners to ass accomplishme as key for our ot required for ave coordinate ed our constr construction. to the creeksid ed to work wi on plan at a la 0 of the Vail R e unit will be c Owner of unit y as required. ation of years o ments made by and 6/7/15. velopment of sure we are co ent was establi project and es r final DRB, bu ed our project uction schedu We have the de setting, but th the Town E ater date. Row Houses o constructed in t 8. The party of planning an y the Design R its kind for thi omplying with ishing historic stablished a ba ut we have had with their in-p le with them t ir support to m there is a sect Engineer to sta on Gore Cree their place. T y wall betwee d discussion w Review Board s zone district the intent of t grade as a bas aseline for all fu d constant com progress and p to minimize im move forward tion of stream abilize it as pa k Drive. Both The party wall n units 10/11 with the Town in the more r t so we have b the design guid seline to meas future projects mmunications planned future mpacts on thei d with this proj m bank off of ou rt of our proje Page 1 of 2 h units will be between unit will remain, b n of Vail. More recent concep been working delines and zo sure against fo s in the comple with the Own e remodel wo ir ability to enj ject. ur property th ect and will be ts 8/9 but will e ptual one r our ex. ners ork. oy hat has e Galvin Residence Project #1408 2/17/16 Page 2 of 2 We have taken great care in the design, detailing and finish selections to create a building appropriate to the style and property value of the location. We believe our project will represent a benchmark for future redevelopment projects in the zone district. Thank you, Ryan Wolffe, AIA, Architect Senior Associate