HomeMy WebLinkAboutDRB160022_DRB160022_1454110140.pdfProperty Information
Property Address
Parcel #
Legal Description
Development Site Area sq ft acres buildable sq ft
Zone District / SDD #
Hazard Zones
Sections 12-21 & 14-7
Snow Avalanche High Severity Moderate Severity N/A
Debris Flow High Flow Moderate Flow High Avalanche N/A
Rock fall High Severity Medium Severity N/A
Excessive Slopes ≥30% N/A
Floodplain 100 year floodplain Floodway Wetlands N/A
Creeks, Streams
Section 12-14-17
Gore Creek on site adjacent to site N/A
Other tributary: ______________ on site adjacent to site N/A
Project Information
Project Description
Development Standards Allowed Existing Proposed
Gross Residential Floor Area (maximum) Chapter 12-15
Primary sq ft
Secondary sq ft
EHU sq ft
TOTAL sq ft
250 Addition Interior Conversion
Credits:
Setbacks (minimum)
Section 14-10-4
Front ft
Side ft
Side ft
Rear ft
Watercourse ft
Site Coverage (maximum) see definition Section 12-2-2
Building Height (maximum)
see definition Section 12-2-2
Sloping ft Flat ft
Landscaping See definition Section 14-2-1
Section 14-10-8
Softscape sq ft
Hardscape sq ft
TOTAL sq ft
Driveway Sections 14-3-1 & 14-3-2
Max Curb-cuts
Max Grade @
centerline
Min Width
Heated drive? Yes No Yes No
Snow Storage %
Parking
Sections 12-10 & 14-5 #Enclosed Spaces #Unenclosed TOTAL
Outdoor Lighting (maximum) Section 14-10-7 # fixtures
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: ____________________________ Lot____ Block _____ Subdivision: _______________
Primary Contact / Owner Representative: ___________________________________ Phone: __________________
_________________________________________________________________ Plans Dated: _________________ Primary Contact/Owner Representative Signature
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Authorized Signature
Comments
Date
CENTURY LINK 970.328.8288 (tel) 970.328.8282 (fax)
Contacts: Kelly McClernon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.406.1784 (tel)
970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
XCEL Energy
970.262.4032 (tel)
970.262.4038 (fax)
Contacts: Britt Mace
brittany,mace@xcelenergy.com
EAGLE RIVER WATER & SANITATION
DISTRICT
970.477.5449 (tel)
970.845.7218 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.930.4713 (tel)
303.603.1004 (fax)
Contact: Michael Johnson
Michael_johnson@cable.comcast.com
CDOT (Only in CDOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us