Loading...
HomeMy WebLinkAboutHoly Cross Verification.pdf UTILITY APPROVAL &VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: 1414 Moraine Drive Vail,Colorado Lot 7 Block Subdivision: Dauphinais Moseley Filing 1 Primary Contact 1 Owner Representative: Brian Gillette Phone: 970.390.7981 Plans Dated: 04/08/2016 Primary Contact/Owner Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Kelly McClernon kelly.mcclernon@centurylink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker emington.c.baker@xcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) Date: 970.945.4081 (fax) 2016.04.1 1 Contact: Jeff Vroom / 12:47:01 jvroom@holycross.com -06'00' XCEL Energy 970.262.4032(tel) 970.262.4038(fax) Contacts: Britt Mace brittany.mace@xcelenergy.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218(fax) Contact: Tug Birk tbirk@erwsd.org COMCAST CABLE 970.930.4713 (tel) 303.603.1004(fax) Contact: Michael Johnson Michaeljohnson@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.