HomeMy WebLinkAboutDRB160033_A5-3_1456164780.pdfMASTER LEVEL
82' - 6"
ENTRY LEVEL
70' - 9"
2
A5.3
3
A5.3
LIVING RM LEVEL
81' - 0"
BEDROOM 4&5
LEVEL
72' - 3"
EXISTING SLAB
NEW SLAB RE: STRUCT.
NEW FINISH FLOOR
TO MATCH EXISTING
EXISTING FLAGSTONE
TO BE REMOVED
BUNK ROOM
SLOPE 1.5 % SLOPE 1.5 %
REPLACE EXISTING
SLAB AND STONE
PATIO WITH NEW
SLAB AND STONE
SLOPED TO DRAIN
EXISTING RAILING TO BE REUSED
SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 1.5 %
NEW STONE TO SLOPE AWAY FROM NEW DECK
AT 1 1/2% AND TIE INTO EXISTING STONE
1
A6.1
WALLS TO BE REPLACED W/ CMU
CONSTRUCTION AND STONE TO
MATCH EXISTING
EXISTING DOOR TO REMAIN
NEW P.T. 2X4 WALL HOLD
OFF CONCRETE WALL 1"
FILL CAVITY W/ 3 1/2"
CLOSED CELL SPRAY FOAM
REMOVE EXISTING
STONE VENEER AND
SAVE FOR REUSE, TYP.
NEW WALL AND DOOR
EXISTING CONCRETE
FOUNDATION WALL TO REMAIN
DESIGN-BUILD ATTACHMENT
SYSTEM BY STONE MASON
A6.2
5
MASTER LEVEL
82' - 6"
1
A5.3
LIVING RM LEVEL
81' - 0"
BEDROOM 4&5
LEVEL
72' - 3"
EXISTING SLAB TO REMAIN
NEW SLAB RE: STRUCT.
NEW FINISH FLOOR
TO MATCH EXISTING
NEW DOOR TO MATCH
EXISTING DOOR AT
BEDROOM 4
A6.1
1
LINE OF EXISTING
FLAGSTONE TO
BE REMOVED
(2) NEW WINDOWS HEAD HEIGHT,
MULLIONS AND SILL HEIGHT TO ALIGN
WITH NEW DOOR ON ADJACENT WALL
EXISTING CONCRETE FOUNDATION
WALL TO REMAIN AS IS
RAISE FINISH LEVEL OF DECK 3"
FROM 82' -0" TO 82' - 3"
SLOPE 1.5 % SLOPE 1.5 %
NEW DROPPED CEILING TO
ALIGN WITH B.O. FINISH OF
NEW DECK STRUCTURE
EXISTING WALL
AND WINDOWS TO
BE REMOVED
BUNK ROOM
EXISTING WALL TO BE DEMO'D AND
REBUILT W/ CMU CONSTRUCTION
EXTERIOR TO MATCH EXISTING
NEW INTERIOR FURRED WALL
WALL TO BE REMOVED AND REPLACED
W/ CMU AND STONE TO MATCH EXISTING
NEW STONE CAP SLOPED TO DRAIN
EXISTING
MASTER
BATHROOM
EXISTING FOUNDATION
T.O. EXISTING WALL @ 76' - 3"
EXISTING 11 7/8 RIM JOIST
NEW CONCRETE/CMU WALL RE: STRUCT.
P.T. WOOD BLOCKING
A6.2
6
MASTER LEVEL
82' - 6"
1
A5.3
A6.1
1
LIVING RM LEVEL
81' - 0"
BEDROOM 4&5
LEVEL
72' - 3"
SLOPE 1.5 % SLOPE 1.5 %
SLOPE 1.5 % SLOPE 1.5 %
EXISTING
BEDROOM
EXISTING
MASTER
BEDROOM
REPLACE EXISTING
SLAB AND STONE
PATIO WITH NEW
SLAB AND STONE
SLOPED TO DRAIN
NEW DOOR TO MATCH
EXISTING DOOR RE: 1/A5.2
WALLS TO BE REPLACED W/
CMU CONSTRUCTION AND
STONE TO MATCH EXISTING
EXISTING RAILNG TO BE
REMOVED AND REUSED
EXISTING FOUNDATION
EXISTING 11 7/8 RIM JOIST
NEW SLOPED
COLORADO BUFF
CAP/SILL
DESIGN-BUILD ATTACHMENT
SYSTEM BY STONE MASON
2
003
NEW WOOD/STEEL FRAMED WALLS, FLOORS, ROOFS
AND COLUMNS SHOWN GRAY WITH SOLID BLACK LINES
NEW STONE VENEER SHOWN WITH DIAGONAL HATCH
NEW CMU WALL SHOWN WITH CROSS HATCH
EXISTING WALL, FLOORS, ROOFS AND COLUMNS TO BE
DEMOLISHED SHOWN WHITE WITH DASHED BLACK LINES
EXISTING WALL, FLOORS, ROOFS AND COLUMNS TO
REMAIN SHOWN WHITE WITH SOLID BLACK LINES
US Mail Only: P. O. Box 2378
Physical / Fedex: 210 Edwards
Village Blvd, Bldg A Suite A103
Edwards, Colorado 81632-2378
(970) 926 4301, Fax: 926 4364
hans@berglundarchitects.com
www . berglundarchitects.com
Scale
Date
Drawn by
Checked by
Issue Date 2/8/2016 3:47:21 PM
VAIL, CO
As indicated
84 BEAVER DAM
A5.3
BUILDING
SECTIONS
2-8-16
EW
HB
2-8-16
DRB SET
1/2" = 1'-0"
1
Section 4
1/2" = 1'-0"
2
Section 5
1/2" = 1'-0"
3 Section 6
REVISION SCHEDULE
# DESCRIPTION DATE
DRB
APPROVED
2/22/2016
12:00:00 AM