HomeMy WebLinkAboutScope Summary Permit Addendum - DRB review 2016-04-20.pdf Summary of Sebastian Penthouse Remodel Permit Addendum #1, dated 02.15.2016 RE:Town of Vail Building Permit Number B-140081 & DRB Action DRB130238 The following revisions have been made to the Permit Drawings, originally submitted on March 24, 2014. Specific revision items are generally listed here in drawing-by-drawing format. Floor plan and exterior modifications have been included in this listing of drawings submitted for Design Review Board review. Please advise if there are any questions.Thank you. Architectural Drawing Sheets: A21.2 Main Level Plan: 1. Revised master balcony hot tub and surrounding protective balcony wall. 2. Revised &clarified mechanical attic equipment at master bedroom. 3. Revised exterior wall framing at Q-line attics due to structural bearing& existing conditions. 4. Added wood flooring and wall with 4'0" opening at corridor/foyer. 5. Revised doors at wet bar. A21.3 Upper Level Plan: 1. Revised living room balcony walls and adjacent roof areas due to structural bearing& existing conditions. 2. Revised living room fireplace location. 3. Deleted dining room fireplace and stone surround. 4. Enlarged and combined electrical &A/V rooms into powder room to accommodate clearances for required equipment. 5. Revised access to library/sitting from guest master ante to new library/sitting hallway. A21.6 Lower Roof Plan: 1. Revised master balcony side walls& added small roof areas due to structural bearing& existing conditions. A21.7 Upper Roof Plan: 1. Revised copper roof skirting near Q-19 & 0-20 due to structural framing conditions. 2. Noted final locations of fireplace flues & kitchen exhaust. 3. Revised linen & laundry chute chimney cap to match kitchen exhaust cap (top of cap is lowered by approx. 3' 0"). A23.2 Partial Enlarged Elevations- East: 1. Revised copper roof skirting near Q-19 & 0-20 due to structural framing conditions. 2. Revised living room balcony walls and adjacent roof areas due to structural bearing& existing conditions. 3. Noted fireplace flues & kitchen exhaust. 4. Revised master balcony hot tub protection wall. A23.3 Partial Enlarged Elevations-South: 1. Revised copper roof skirting near Q-19 & 0-20 due structural framing conditions. 2. Revised living room balcony walls and adjacent roof areas due to structural bearing& existing conditions. 3. Revised existing chimney&commercial kitchen exhaust extensions due to existing conditions. Note that height of commercial kitchen exhaust revisions were structural and the height and size remained the same as permitted.Also note that smaller exhaust chase chimney to the east of the commercial exhaust was not raised (as permitted), because existing chimney did not contain a flue, as previously assumed. 4. Revised master balcony hot tub protection wall. 5. Revised laundry chute chimney cap and reduced height by approx. 3' 0"to reduce loads on existing framing. A23.4 Partial Enlarged Elevations-West: 1. Revised copper roof skirting near Q-19 & Q-20 due structural framing conditions. 2. Revised living room balcony walls and adjacent roof areas due to structural bearing& existing conditions. 3. Revised existing commercial kitchen exhaust extension due to existing conditions. 4. Revised master balcony hot tub protection wall. 5. Revised laundry& linen chute chimney cap. 6. Reduced height of windows 1 & 2. Structural Drawing Sheets: S1.1 Lower Level Framing Plan: 1. Clarification of existing eave framing to remain at 18& 21-lines, between Q&S-lines. 2. Addition of landing stringer support at stair. S1.2 Penthouse Floor Framing Plan: 1. Added supplemental sketches to resolve existing conditions. 2. Added details of east&west gable framing at R-line. S1.3 Roof Framing Plan: 1. Added supplemental sketches to resolve existing conditions. 2. Added RO framing for laundry chute chimney. 3. Revised skylight framing. 4. Added framing details of commercial kitchen exhaust chimney due to existing conditions. 5. Revised Q-line eave framing. 6. Revised east ridge framing at R-line to double beam. S2.0 General Notes &Sections: 1. Added Section 8, revised detail at double ridge beam. S2.1 Framing Sections: 1. Deleted Sections 3, 4, 6, 10, 12 & 17. S2.2 Framing Sections: 1. Deleted Section 10. 2. Added sections 8 &9. 3. Corrected joist size note in Section 1. S2.3 Framing Sections: 1. Added new sheet of supplemental details as needed by field conditions and RFIs. S2.4 Framing Sections: 1. Added new sheet of supplemental details as needed by field conditions and RFIs. Mechanical Drawing Sheets: M01.2 Mechanical Schedules: 1. Added boiler and snowmelt manifold schedules. M21.1 HVAC Main level Plan: 1. Revised return &supply ducts and diffusers in bunkroom, guest bedroom 4, guest bedroom 5 and master bedroom. 2. Revised flue details at master bedroom. 3. Revised exhaust venting at hers. 4. Revised master balcony to hydronic snowmelt. 5. Added air grille for 02 generator. M21.2 HVAC Upper Level Plan: 1. Revised return &supply ducts and diffusers in living stair hall, guest master bedroom, powder room and library/sitting. 2. Revised northwest attic duct feeds to bunk room below. 3. Revised fireplace flues at living room and from master bedroom below. M21.3 Plumbing Main Level Plan: 1. Added gas line to dryer in her dressing. 2. Revised pipe routing due to existing conditions. M21.4 Plumbing Upper Level Plan: 1. Revised gas rough-ins to kitchen and living room fireplace. 2. Added steam shower generator note. M31.1 Mechanical Diagrams: 1. Revised gas piping one-line. M41.1 Mechanical Controls: 1. Added boiler piping&control diagram. Electrical Drawing Sheets: E01.1 Electrical Cover Sheet: 1. Updated sheet index. 2. Added roof gutter melt system notes. E21.1 Electrical Main Level Plan: 1. Revised electrical provisions for hot tub. 2. Deleted electric snowmelt at master balcony. 3. Revised electrical provisions for equipment, including power toilets,towel warmer, her dressing washer&dryer,TVs, and steam generators. 4. Revised in-floor heat extents. E21.2 Electrical Main Level Plan: 1. Revised electrical provisions for fireplaces& kitchen appliances. 2. Revised electrical room 602. 3. Made misc. revisions to accommodate room layout changes noted on sheet A21.3. E31.1 Electrical One-Line Diagram & Schedules: 1. Added panel L1. 2. Revised panels D1 & D2. 3. Revised short circuit calculations summary table. 4. Revised mechanical equipment schedule, including HP ratings& added snowmelt boiler& pump.