Loading...
HomeMy WebLinkAboutB16-0087_A0-02_1478901560.pdfUP WD DN W D UP DN DN VAIL FIRE STATION #1 1ST LEVEL 2ND LEVEL 2886 SF 3RD LEVEL / 4TH LEVEL EXISTING PROPOSED FIRE STATION ADDITION 5TH LEVEL 1635 SF PROPOSED EHU ADDITION TOTAL PROPOSED ADDITION (NEW SPACE) 105 SF GROSS SF TOTAL 1740 SF 4626 SF 1360 SF 20 SF 20 SF 0 SF 1380 SF 1566 SF 150 SF 0 SF 150 SF 1716 SF 220 SF 150 SF 0 SF 150 SF 370 SF TOTAL 6032 SF 2060 SF 125 SF 1935 SF 8092 SF SQUARE FOOTAGE OVERVIEW * NEW FIRE STATION SPACE = 1935 SF * EXISTING GYM CONVERTED INTO NEW EHU SPACE = 644 SF ON THE 2ND LEVEL * SQUARE FOOTAGE CALCULATIONS ARE APPROXIMATE AND SHOULD BE VERIFIED BY THE GENERAL CONTRACTOR. * CURRENT RESTROOM WILL REBUILT TO BE ADA COMPLIANT. * NEW FRONT ENTRY WILL HAVE AN ADA APPROVED DOOR OPENER EXISTING 2886 SF PROPOSED FIRESTATION ADDITION 1635 SF PROPOSED EHU 105 SF TOTAL EXISTING 1360 SF EXISTING GYM CONVERTED INTO PROPOSED EHU 644 SF EXISTING EHU 787 SF AREAS BELOW AND ABOVE 20 SF NEW AREA BELOW EXISTING EHU (4TH LEVEL) 212 SF EXISTING FIRE STATION DUTY QUARTERS (3RD LEVEL) 1566 SF PROPOSED ADDITION FOR DUTY QUARTERS 150 SF EXISTING FIRESTATION DUTY QUARTERS LOFT 220 SF PROPOSED ADDITION FIRESTATION DUTY QUARTERS LOFT 154 SF EXISTING AREA AREA BELOW OR ABOVE PROJECT INFO LEGEND PROPOSED NEW CONSTRUCTION 1650 Fallridge Road, Suite C-1 Vail, Colorado 81657 f.(970) 476-4901 p.(970)476-6342 LOT 15 BIGHORN SUBDIVISION 4116 COLUMBINE DRIVE VAIL, CO 81657 A0.02 PROJECT OVERVIEW VAIL FIRE STATION # 1 Project Number - 1547 04.29.2016 PERMIT SUBMITTAL 1/16" = 1'-0" 1 LEVEL 1 - PROJECT OVERVIEW 1/16" = 1'-0" 2 LEVEL 2 - PROJECT OVERVIEW 1/16" = 1'-0" 3 LEVEL 3 AND LEVEL 4 - PROJECT OVERVIEW 1/16" = 1'-0" 4 LEVEL 5 (FS LOFT) - PROJECT OVERVIEW 06/14/16